|
Jon Lowe, Super / Project Manager at Castaway Construction & Restoration LLC: • Aloha Friday! • Site meeting with Leadcores Casey Lamb to discuss and review the gultch property line details. • Signature Shades on-site completing Master bath lanai trellis, starting BBQ shade structure. • Ramos team onsite working on inside pool details. • Hilltop Tile onsite setting pool wall shells reef tile. • Site meetings with Hilltop Dimitri. • Sturdevant on site continuing to commission the HVAC. • Continued Parklex finish details at top of elevator stair stringer/lanai. • Completed finish set of the main kitchen freezer and refrigerator. • Laid out and began fabrication of roof top timber tech electrical switch box. • HES down to Kihei and Makai electrical commissioning at interior. Fan controls outstanding. • HES began wiring BBQ structure. • Received and passed Maui County Electrical pool bonding inspection. • Keith Drew on-site. • Received notice the Kona Hall art sculpture is being delivered Monday. Quote of the day: “Beauty is in the eye of the beer holder”
|
|||||||||||||||||