Jon Lowe, Super / Project Manager at Castaway Construction & Restoration LLC: • Site meeting with Mike B. and Darren to confirm Decton stair veneer details. • Met with Keith Drew about Deckton stair railing attachment Details. • CMAC on-site completing back drainage project. • Received Haleakala pocket door hardware. • Received and installed Wolf BBQ knob replacement. • Recieved information about additional sliding gate hardware for the sliding shower doors. • Tomas landscape crew on-air continuing on installs of mainline water pipes. • Keith Drew on-site working the top of the circular stair stringer at elevator. • Mike Ramos on site working on bunker room pool equipment low volt wiring. • EDesign not on-site. • HES on-site. • Garrett/HES on-site continuing to program/charge PV system. • Woodys on-site accessing parts needed to complete gas line terminations. • Woodys crew back on site Friday to complete BBQ hook up. • Continued fabricating Dura Rock for steel stair tread assembly. • Finalized April and May pay app# 22 With Gen. Quote of the day: “The problem with trouble is it starts out as fun”
|
|||||||||||||||||