Jon Lowe, Super / Project Manager at Castaway Construction & Restoration LLC: • Recieved delivery of cargo lift. • Un crated, inspected, staged and verified the cargo lift is the correct size, with no damage • Notified Access Lifts of the above. • Shortened night stand cabinet at Kona bedside. • Woodys plumbing on-site completing sewer line install. • Maui County Plumbing scheduled for sewer line inspection, Thursday. • Began install of Iron Away at upper level laundry room. • Received Elegant Paintings proposal to paint the drywall ceilings. • Confirmed Elegant painting will be on-site Friday to prep wood ceilings for clear coat, spraying clear coat on Sat. • Hilltop working on exterior shower floor tile installs. • Continued base and door Fry Riglet installs at lower level. • Keith Drew and crew continued install of steel stingers for the interior stairs. • Drywall finishers continuing at main level. • Attended OC meeting with Mike B. and Gen. • Met with Sergei regarding HES proposal. • Continued covering and protecting floors and cabinetry. Quote of the day: “Responsiveness is respect made visible”
|
|||||||||||||||||