Jon Lowe, Super / Project Manager at Castaway Construction & Restoration LLC:
• Continued prepping exposed steel structure at elevator for paint. • Secured and picked up epoxy primer for the elevator steel structure. • Weekly OAC meeting with Gen, Drew and Mike B. • Worked with Ramos Pools on pool coping details, lanai to coping drainage, etc. • HES prepping to be ready for Maui County Elect. inspection end of day Friday. • Hilltop on-site completing grout at master wall tile, and various tile prep and installs. • Keith Drew on site. • Reviewed elevator stair details with Keith. • Requested and received additional radius details for elevator stairs from Drew. • Worked with Drew on various details. • EDesign not on-site. • Continued Monkey pod milling. • Drywall finish at Rack room, observatory, stair well, and walk in closet hidden door area in progress. • Continued roof top decking installs. Quote of the day: “Nothing is at urgent as your nervous system thinks it is”
|
|||||||||||||||||