Jon Lowe, Super / Project Manager at Castaway Construction & Restoration LLC: • Completed island pendent light mahogany canopy Installs. • CMAC on-site altering top of concrete drain box. • Ordered additional sliding gate hardware for the sliding shower doors. • Tomas landscape crew on-site setting back flow device for irrigation and installing mainline water pipes. • Keith Drew on-site reaching the top of the circular stair stringer at elevator. • Mike Ramos on site working on bunker room pool equipment. • Ramos Pools detailing infinity edge tile. • Spoke with Reynolds sub about scheduling final cosmetic seal bead at swim lane entry and at round window. • EDesign on-site. • HES on-site. • Garrett/HES on-site beginning to program PV system. • Woodys on-site accessing parts needed to complete gas line terminations. • Woodys crew back on site tomorrow. • Delivered master bedroom mahogany entry door to island wood door for repair. • Began fabricating Dura Rock for steel stair tread assembly. • Spoke with Kerry at HI Gas, HI gas scheduled for next week Monday gas termination inspection. • Worked with Gen finalizing April and May pay app# 22. • InstallEd bird spikes at elevator soffit. • Completed programming of the Tulip induction cook top. • Site visit from Marc Taron and family. • Tygrr onsite beginning to fabricate roof top planter box assembly. Quote of the day: “Remember not to take yourself too seriously, as everything in life is temporary, and taking the present moment for granted would be a waste.”
|
|||||||||||||||||