Jon Lowe, Super / Project Manager at Castaway Construction & Restoration LLC:
• Week of 11/14/25 • Aloha Friday!! • Signature shades constructing roof top pergola, screen at Kona lanai. • Completed roof top furniture fabrication. • Elegant Painting continuing application of paint color at main level drywall. • Woodys Plumbing setting finish plumbing fixtures. • HES/Kamalu setting breakers at lower panels.panels. • HES continuing setting ceiling fans and ceiling fixtures at all main level ceilings and lanai ceilings. • Drywall finish continuing at lower level walls. • EDesign setting under Cabinet LED lighting, speakers, and leak detectors. • Hilltop finishing up interior tile sets. • Hilltop beginning lave rock set at exterior planter box wall. • Mike B. on-site welding at interior stair stringer. • Keith Drew fabricating metal stair treads. • Dropped off coded invoicing to CCR. • Competed draft for pay app # 17. • Began setting appliances. • Laid out faucet penetrations, and beer tap & tray penetrations for Next Level Granite. • Began laying finish hardware at bathrooms. • Attended OC and OAC meetings. • Laid out and cut in lights at spiral stair case to roof. • Continued setting interior doors and hardware at main level. • Met with Artie regarding Kona Bath supplied air vent. • Performed major clean up. Quote of the day: “Scaffy”
|
|||||||||||||||||