Jon Lowe, Super / Project Manager at Castaway Construction & Restoration LLC:
• On-site meeting with Mike B. and concrete epoxy contractor. Discussed colors, textures, etc. • Epoxy contractor Donny to provide samples as next step. • Ramos pools onsite creating pool radius for tile artist. • Leo’s Concrete on-site successfully placing 6 cubic yards of concrete at bunker room slab. • EDesign on-site installing cove lighting. • Requested sample of lineal light strip for stair treads, sub woofer grill info, speaker grill paint info from Edesign. • Hilltop tile setters onsite. • Continued roof top decking install. • Continued monkey pod landing milling. • Worked with Gen on project accounting. • Prepped framing for tomorrow’s drywall installs at rack room and observatory. • Completed prep for Kona Tub shelf install. • Laid out and confirmed outside master shower tower location. • Coded project invoices. • Invited Josh Teeter with EDesign to project Basecamp. Quote of the day: “A peacock that rest on his tail feathers is just another turkey” •
|
|||||||||||||||||