Jon Lowe, Super / Project Manager at Castaway Construction & Restoration LLC:
• Recieved notice from Next Level the island cook top will be installed by this weeks end. • Assisted Nahem with kegerator system install details. • Removed scaffolding at interior stair well. • Weekly project meeting with Gen. • Continued prepping the roof top decking for sealant. • Completed material list for outside shower gates and hardware. • Supplied Gen with outside shower gate hardware for order. • Supplied Keith Drew with outside shower door frame material for order. • Worked with Mike B. and HES. • EDesign one man crew on site. • Ramos Pools onsite. • Worked with Ramos pools in pipe routing at BBQ and lanai column. • Recieved notice from Pac Source the remaining exterior door order will land on Maui week of 3/18. • Woodys Plumbing on-site tomorrow. • Prepped observatory bath for toilet install. • Continued fabrication of the concrete treads for spiral stairs to roof. • Began install of concrete treads at spiral stair case to roof top. • Scheduled Hilltop to open up tile at shower head pipes for tomorrow. • Contacted Artie about setting AC splits at Rack room and observatory. • Sent Gen additional information for the Robern mirror door replacement. • Elegant painting on-site. Quote of the day: “When the inner voice says,’Give up,’ Hope whispers, ‘Try it one more time.’ “
|
|||||||||||||||||