Jon Lowe, Super / Project Manager at Castaway Construction & Restoration LLC:
• Access Lifts continuing on elevator and Dumb Waiter installs. • HES Elect. on-site installing fixtures and devices. • HES PV onsite delivering materials, batteries, and began install of rooftop PV racks. • Elegant painting onsite continuing on interior finish and painting. • Keith Drew on site installing upper landing at interior stairs. • Began final lay out and fabrication of spiral stair to roof tread templates for Keith Drew. • CMAC continuing on excavation of back drainage basin. • Hilltop on-site sealing stucco and tile installs. • Worked on project accounting. • Site meeting from Mike B. and friends. Quote of the day: “ Over thinking kills magic”
|
|||||||||||||||||