|
Jon Lowe, Super / Project Manager at Castaway Construction & Restoration LLC:
• Completed prepping exposed steel structure at elevator for paint. • Applying epoxy primer for the elevator steel structure tomorrow Friday. • Site meeting with Artie to schedule HVAC finishes. • Ramos Pools on site prepping pool pre coping and infinity edge details. • HES continuing prepping for Maui County Elect. • Received epoxy samples from Donny. • Hilltop on-site • Keith Drew not on site. • EDesign not on-site. • Woodys plumbing on-site prepping hot water tanks, setting foot wash finish, master exterior shower tower. • Continued Monkey pod milling. • Drywall finish at Rack room, observatory, stair well, and walk in closet hidden door area in progress. • Received “Leed” final inspection details from Kelcey Sykes at Green Building Hawai’i. • Continued roof top decking installs. Quote of the day: “I love to sleep. My life has a tendency to fall apart when I’m awake.”
|
|||||||||||||||||