Jon Lowe, Super / Project Manager at Castaway Construction & Restoration LLC:
• Woodys Plumbing on site to install water filtration system. • Continued install of the big garage work bench cabinetry. • Tygrr and Mike B. continuing on shower gate fabrications. • Worked with Mike and Tygrr on shower gate details. • Ramos pools continued shells reef tile installs at pool infinity wall. • Laid out front tiki torches and boat sprinklers. • Site meeting with Tomas. • Tomas to commence landscape scope Monday. • Continued roof top decking sealer • EDesign crew on-site. • Completed drilling concrete for the back stair steel stair assembly. • Began layout of the steel pool stairs. • Keith Drew on-site working on roof top railings. • Completed laying out circular driveway, circular planter box and circular stairs at elevator. Quote of the day: “Success seems to be largely a matter of hanging on after others have let go.”
|
|||||||||||||||||