(0101-02153 Bennett Residence / 0101-02539 Imagine Island Trust Residence - Finishes) Answer to “How did your day go? What did you work on?”

3 views
Skip to first unread message

Jon Lowe (Basecamp)

unread,
Apr 29, 2026, 10:55:02 PMApr 29
to mben...@cal.berkeley.edu

Jon Lowe, Super / Project Manager at Castaway Construction & Restoration LLC:

• Woodys Plumbing on site to install water filtration system.

• Continued install of the big garage work bench cabinetry.

• Tygrr and Mike B. continuing on shower gate fabrications.

• Worked with Mike and Tygrr on shower gate details.

• Ramos pools continued shells reef tile installs at pool infinity wall.

• Laid out front tiki torches and boat sprinklers.

• Site meeting with Tomas.

• Tomas to commence landscape scope Monday.

• Continued roof top decking sealer 

• EDesign crew on-site.

• Completed drilling concrete for the back stair steel stair assembly.

• Began layout of the steel pool stairs.

• Keith Drew on-site working on roof top railings.

• Completed laying out circular driveway, circular planter box and circular stairs at elevator.

Quote of the day:

“Success seems to be largely a matter of hanging on after others have let go.”





Sent with Basecamp You can reply to this email or respond in Basecamp.
This message was sent to Alana Scott, Artie Ferreira, Bob Polasek Jr., Cody Macdonald, Don Kimball, Drew Kauffman, Genevieve Sison-Dollopac, Ikaika Reyes, John Rawson, Joshua Cardeno, Kelcey Sykes, Kristen Totah, Lovely Pascual, Marc Taron, Marlon Silloriquez, Marsha Kaleikau, Mati Stamatiou, Matt Hecox, Michelle Leatherman, Mike Bennett, Nick Ross, Roger Cabudol, and Sarah Marshall.
UnsubscribeChange your notification settings
Get the Basecamp app for iPhone or Android!
Download on the App Store Download on the Play Store
6a86527ec1398a3bd7f36371
Reply all
Reply to author
Forward
0 new messages