Jon Lowe, Super / Project Manager at Castaway Construction & Restoration LLC:
• Darren and crew on-site setting custom sink tops, master tub deck, and main kitchen back splash. • Began install of automated window equipment at great room. • Access Lifts completed first phase of Elevator, Dumb Waiter and Cargo lift installs. Final phase performed once permanent power is in place. • HES Elect. on-site installing fixtures and devices. • HES PV onsite delivering materials, batteries, and continued install of rooftop PV racks, and battery layouts. • Elegant painting onsite continuing on interior finish and painting. • Keith Drew on site completing upper landing at interior stairs, and finishing up final welding. • Received working drawings for roof top planter box from Drew. • Began framing at upper landing surround and deck. • Completed final lay out and fabrication of spiral stair to roof tread templates for Keith Drew. • Keith ordered material for spiral stairs to roof, here on Monday. • Weekly project accounting meeting with Gen. • Received the shower shelf satin nickel Ginger dial soap holders. • Received notice the additional roof top decking is shipping this wee. • CMAC completing excavation of back drainage basin, beginning drainage pipe installs. • Hilltop not on site. • EDesign not on site. • Woodys not on site. • Worked on project accounting. • Site meeting with Mike B. and Mario. • Began final adjustments of the fleetwood doors. • Began wiring kitchen hood. • Worked with Kamalu installing orbit lights at Haleakala water closet. • Recieved and passed Maui County electrical inspection for the obsevatory. Quote of the day: “ Beautiful roads often lead to beautiful destinations.”
|
|||||||||||||||||