Jon Lowe, Super / Project Manager at Castaway Construction & Restoration LLC: 2/19 2/20 • Aloha Friday!! • Donny on-site applying epoxy at kegerator pad. • Contacted Nahem about starting once epoxy has cured. • Continued prepping elevator exterior shaft for tile finishes. • Hiltop began installing flamed basalt tile at elevator. • Site meetings with Mike B. • EDesign on-site setting finishes, TVs. • Assisted EDesign with closet rod installs. • Ramos Pools onsite setting equipment at bunker room. • Successful waterline tile meeting with Mike Ramos and Mike B. • Elagant painting on-site applying final paint at upper level. • Signature shades onsite installing main lanai shade awning, Kihei exterior shower and Haleakala exterior shower structures. • Sturdevant onsite setting condensers and finishes. • Hilltop on-site continuing on finish tile sets. • HES returning Monday to continue setting finish through out. • Keith Drew on-site setting cable railings at roof top. • Site meeting with Garrett. • Worked with Gen on project accounting. • Received EDesign mirror delivery. • Conducted parking similar a lower drainage basin. Quote of the day: “ The most wasted of all days is one without laughter”
|
|||||||||||||||||