Jon Lowe, Super / Project Manager at Castaway Construction & Restoration LLC:
• Aloha Friday! • Tomas on-site completing excavations for the boat sprinkler trenches and sleeves for the planter area infrastructure at front driveway. • Keith Drew on-site prepping for the circular elevator stair stringer installs. Keith back on Tuesday. • Mike Ramos on site continuing on blue waterline tile installs. • Completed interior stair glass railing layout, began fabricating glass railing template panels, and safety railing install. • Installed safety railing at rear lanai donut hole. Completed shop drawings for rear lanai donut hole glass railing order. • Completed rear lanai landing Parklex soffit install.
• Kamalu on-site running pool bunker room circuitry for the pool equipment. • Positioned fire sprinkler tank at bunker room. • Received notice that Edesign has left the building. • Performed major project clean up and re organization. • Received delivery of additional 12 yard dumpster from Waste Pro Hawai’i. • Prepped lower laundry for additional finishes. • Mike B. and Andrew on site. • Received approval for pay app #21. • Received approval to order elevator door side light glass. • Received elevator shaft glass enclosure design options from Locale. Yet to review with Mike B. • CMAC delivering driveway gravel Tuesday. • CMAC back on rear culvert project Tuesday. • Woodys plumbing on-site installing in ground boat sprinkler plumbing runs. • Fabricated 4” sleeves for boat sprinkler risers. • Installed sleeves to elevator planter box area for water, power, low volt runs. • Tomas crew on-site Saturday to back fill boat sprinkler and sleeve trench’s. • Tomas delivering water pipes for sprinkler system. • Discussed water meter at filtration system with Woodys. Woodys to work up CO. • Site will be closed Monday in observance of Memorial day. Quote of the day: “The measure of intelligence is the ability to change”
|
|||||||||||||||||