Jon Lowe, Super / Project Manager at Castaway Construction & Restoration LLC: • Aloha Friday!!• Pre con permanent power install meeting with Garrett Kamalu and Mike B.• Scheduled Kamalu to be on-site next week to begin electrical commissioning.• Installed back of big garage fresh air grill.• Began install of back of big garage 4’ exterior door threshold.• Keith Drew on-site setting the elevator stair circular stringer.• Mike Ramos setting spa floor tiles.• Completed installing exterior shower finish hardware.• Mike B. and Andrew on site.• CMAC on site completing install of the back culvert pipe and began setting the concrete drain inlet Box.• Completed interior room by room post permanent electrical punch list.• Received estimate for the back upper lanai glass railing panels.• Organized roof top seating and surrounding areas.• Installed observatory bath vanity, mirror, and finish hardware.• Began install of observatory desk cabinetry.• Completed shop drawings for the interior stair glass railings.• Send out said drawings for pricing and time frame.• Completed install of the first exterior shower door gate at rear Kona, well done Mike B!• Site meeting with Mike B. and Darren to discuss the steel stair tread cladding with the deckton slab material.• Darren to supply mock up for said cladding to review and test.Quote of the day:”The line of least resistance is what makes rivers and men crooked”
|
|||||||||||||||||