|
Jon Lowe, Super / Project Manager at Castaway Construction & Restoration LLC:
• Received delivery of the flamed basalt tile order. • Reviewed details of mid level wall at pool with Hilltop. • Requested details from Drew for mid level wall at pool. • Hilltop crew on-site setting tile at Hale back lanai, hot water heater closet floor at Kihei and back side wall of BBQ. • Next level on-site finishing main Kit. back splash and Kona stone tub shelf. • Reviewed main kitchen island redo details with Hilltop. • Received notice the cut mirrors from Glass Products Hawai’i will be delivered to the site Monday AM. • Worked with Keith Drew on spiral stair railing details. • Worked with HES prepping for electrical inspection. • Confirmed Edesign will be back on site tomorrow. • Ramos Pools prepping pool and spa for coping and tile. • Continued roof top decking installs. • Aligned observatory elect. devices. • On site meeting with Gen. Quote of the day: “Every ending carries the weight of the effort that came before it”
|
|||||||||||||||||