Determine Volume Required to Level out a Parcel on a Slope
12 views
Skip to first unread message
Aubin Dorion
unread,
Feb 13, 2024, 5:13:31 PM2/13/24
Reply to author
Sign in to reply to author
Forward
Sign in to forward
Delete
You do not have permission to delete messages in this group
Copy link
Report message
Show original message
Either email addresses are anonymous for this group or you need the view member email addresses permission to view the original message
to LiDAR360 Suite User Group
Hi There,
I've got a client who would like to bring in a bunch of fill to level out his property where there is a significant slope. I'm wondering if there is a function in LiDAR 360 which would allow me to calculate the amount of material required to bring it up to a certain elevation. I'm running the Pro version of 360.