How can I make Gurobi stop when it's taking too long to optimize?
427 views
Skip to first unread message
heinon...@gmail.com
unread,
Jan 16, 2016, 12:19:53 PM1/16/16
Reply to author
Sign in to reply to author
Forward
Sign in to forward
Delete
You do not have permission to delete messages in this group
Copy link
Report message
Show original message
Either email addresses are anonymous for this group or you need the view member email addresses permission to view the original message
to Gurobi Optimization
I have a script that works well, but on a small number of simulations it takes too long, and I press CTRL-C to stop it.
However, I can't always be doing that manually. Is there a way for me to tell Gurobi to give up optimizing and just accept the current solution if it's taken more than a certain amount of time?
I'm using Gurobi in MATLAB.
Sonja Mars
unread,
Jan 18, 2016, 2:46:38 AM1/18/16
Reply to author
Sign in to reply to author
Forward
Sign in to forward
Delete
You do not have permission to delete messages in this group
Copy link
Report message
Show original message
Either email addresses are anonymous for this group or you need the view member email addresses permission to view the original message