2. For your necessary comments please.
NS Aswal
From: "narendra aswal" <
narend...@rediffmail.com>
Sent: Sun, 27 May 2012 10:04:38
To: "gulmohar-garden-svp " <
gulmohar-...@googlegroups.com>, "dspatwal " <
dspa...@yahoo.com>, "ranjitkathuria " <
ranjitk...@gmail.com>, "Stanly George " <
george...@gmail.com>, "
kumar....@gmail.com" <
kumar....@gmail.com>, "prashant_pandey " <
prashan...@hotmail.com>, "
narend...@rediffmail.com" <
narend...@rediffmail.com>
Subject: Fw: PATHATIC CONSTRUCTION QUALITY AT GULMOHAR GARDEN
From: "narendra aswal"
narend...@rediffmail.com
Sent: Sun, 27 May 2012 09:30:55 +0530
To: "gulmohar-garden-svp "
gulmohar-...@googlegroups.com
Cc: "dspatwal "
dspa...@yahoo.com
Subject: Fw: PATHATIC CONSTRUCTION QUALITY AT GULMOHAR GARDEN
From: "narendra aswal"
narend...@rediffmail.com
Sent: Sun, 27 May 2012 06:35:38 +0530
To: "gulmohar-garden-svp"
gulmohar-...@googlegroups.com
Cc: "dspatwal"
dspa...@yahoo.com
Subject: Fw: PATHATIC CONSTRUCTION QUALITY AT GULMOHAR GARDEN
From: "narendra aswal"
narend...@rediffmail.com
Sent: Sat, 26 May 2012 16:27:24 +0530
To: "gulmohar-garden-svp"
gulmohar-...@googlegroups.com
Cc: "
dspa...@yahoo.com"
dspa...@yahoo.com
Subject: PATHATIC CONSTRUCTION QUALITY AT GULMOHAR GARDEN
Dear all,
1. On 21 May 2012 ,during my leave , I visited Gulmohar Garden(GG) and saw ongoing construction work at the site. I was quite shocked to see the pathetic condition of construction work inside the flats and in and around the area . In this regard , I am attatching few photograps for the perusal of all the flat owners. As per the information given by the office of the SVP group , they are planning to issue possessision letters to all of us in this week. However, with my personal assessement of the ongoing work at the site, it is visualized that 30% of work is yet to be completed which may take atleast another six to eight months for completion provided the work is progressed continuously by the builder. In my opinion, the completed work in the flats/towers and other essential work in the GG area is of poor
standard.As per the website and brochure of SVP Group, items in the flats were to be provided as per the following specifications;-
(a)living/Dining/lobbyo | : |
Vitrified Tiles | | (b) Walls | : | Oil bond distemper paint on POP punning Ceiling – Oil Bond Distemper and POP Punning | | (c) Doors | : | Painted Hardware / iron Frame with painted Moulded Skin door. Door Hardware – Shutter hinges in brass. All other hardware in Brass. A doors except those in Toilet & Kitchen to be provided with a mortice lock. | | (d) Kitchen | : | Modular Kitchen with Granite Top | | (e) Window | : | Hardwood Frame. | | (f) Balcony | : | Floor- Combination of one or more of Vitrified Tiles/Ceramic Tiles. | | (g)External Finishes | : | Textured Finish | | (h) Toilets | : | Walls Combination of one or more Ceramictiles | | (j) Floor | : | Combination of one or more Vitrified / Ceramictiles | | (k) Fitting & Fixtures | : | Single level C P Fitting with Provision of Gas Pipe line | | (l)Electrical Work/ (m)Fixtures | : | Electrical Work with copper wires in Concealed PVC conduits. Provision shall be Made for sufficient Lighting & power points Switches & sockets. Telephone & TV point In each Bedroom, Drawing/Dining Room With modular Switches and Furnished Cupboards. |
| |
|
|
2. Physical verification of flat No LV-102& 302 and other general amenities of the project revealed the following :-
(a) Quality of tiles in the flats is substandard . We were promised vitrified tiles .
(b)All frames in Windows/doors are wooden and no iron frames are fitted .
(c) Electrical fitments items are not fitted properly.
(d) Railings in the balconiesare not fitted properly and some of them have already got disengaged from the
side/bottom walls.
(e) WCs , sinks and water taps have not been fitted till now.
(f) Ceiling panels in the bathrooms are not fitted properly.
(g) Openings for the ACs have not been covered which is a great security risk since , all occupants may
not afford ACs in all the three rooms. It is desired that these openings should be covered withwooden panels for proper security of flats.
(h) Plastering work in the flats has peeled off at quite a large placesand at some places cracks have
developed.
(j) Only one lift has been fitted which is not operational. Both the lifts are required to be made operational
prior to handing over possession. The width of the lifts is small and not suitable for carriageof heavy and cumbersomeluggage at top floors.
(k) Open vehicle parking area is not ready.
(l) Sewage disposal arrangements are not ready.
(m) No arrangement of security in the complex ,which is most essential consideration before taking over
flats.
(n) Internal roads have not been made at all. External two roads from six lane highway as shown in site map
have not started till now. Taking over possession without these roads is virtually not possible.
(o) Windows have not been provided with iron grills for added protection. Similarly, there is no wire mesh
(zali) for mosquito proofing.
(p) Doors do not have iron latches for putting the locks.
(q) Plastering and distempering work is of poor quality.
2. At the moment , construction work at Krishna Garden(KG) and additional two towers(constructed on green areas) is in progress. All material for these towers and KG has to come from that single lane road which already has a heavy volume of traffic . At the moment, construction on other roads has not started . In case builder decides to offer possession letters at this stage , just imagine the plights of the residents. Seeing the pathetic state of construction at the project. I am totally demoralized and quite apprehensive about the future of our children since they will be living in a crowded area without roads , parks ,green area and other amusement facilities. It gives me an indication that we are still living in dictatorship rather than democracy where will of the builders is supreme over the consumers. The only solution totackle these atrocities of the builder is the unity of the flat owners , Therefore it is my humble appeal to all the flat owners that flats should not be taken over individually but by a selected committee only after getting optimal satisfaction level towards construction quality and provision of other essential amenities i.e. roads, security arrangement , proper sewage disposal,internal and external roads, club,swimming pool,vehicle parking facilities,parks , provision of both lifts in each flats, water supply etc. In case, if these points are not looked into by the builder prior to offering possession letters, we all will have to spent additional 3 to 5 lacs of rupees from our pockets for looking into/addressing these requirements.
3. In view of the above , you all are kindly requested to give your feedback on the above mentioned points at the earliest.
Yours Sincerely