GSICS VIS/NIR Meeting for Thursday 09 November 2023, with LSICS draft attached

10 views
Skip to first unread message

Doelling, David Robert (LARC-E302)

unread,
Nov 2, 2023, 10:10:17 AM11/2/23
to gsic...@googlegroups.com

Hello fellow GSICS VIS/NIR members,

From Hugh Kieffer

Attached is a draft of the specification of the files to be used in the LSICS

system. This will be extensively discussed at the workshop in Darmstadt (LCW4).

 

Please consider this draft for WHAT IT COVERS so that this can be discussed at

the web meeting Nov. 9.  If you have comments on the items in the tables, I will

try to accommodate them also.

 

I will then make a revision for distribution about a week later, which will be

the working draft for LCW4

 

I can introduce the discussion of the file contents at LCW4, but it would be

best if I do not chair the discussion. Someone please volunteer to do that.

 

The next GSICS VIS/NIR meeting will be held on Thursday, November 9th between 7 - 9 AM (USA-EST).

Check your time.

Meeting Web Page

MS Teams Meeting Web Link

The schedule/agenda for the 11/09/2023 GSICS VIS/NIR web meeting

If you would like to present at this meeting, there is still plenty of time, please email me a title for your presentation.

 

The Tom, Hugh and Seb have requested to have a discussion regarding the Fourth Joint GSICS/IVOS Lunar Calibration Workshop, 4-8 December 2023, Darmstadt, Germany

https://www.eventsforce.net/eumetsat/frontend/reg/thome.csp?pageID=19008&eventID=47&CSPCHD=000001000000NwrwuQ0S7is_GPc$KK1EDahov_pVcBws8gap18



Presenter Name

Agency

Title

Tom Stone

USGS

Upcoming December Lunar Workshop Discussion

 

 

 

--
You received this message because you are subscribed to the Google Groups "GSICS Development" group.
To unsubscribe from this group and stop receiving emails from it, send an email to gsics-dev+...@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/gsics-dev/87447283-4A65-45D5-B59A-35C401AC9B04%40nasa.gov.

Spec.pdf

Doelling, David Robert (LARC-E302)

unread,
Nov 8, 2023, 10:46:56 AM11/8/23
to gsic...@googlegroups.com
Spec.pdf

Sebastien Wagner

unread,
Nov 8, 2023, 10:53:18 AM11/8/23
to gsic...@googlegroups.com, Hugh Kieffer

Dear Hugh, dear all

 

Thanks for your email. Tom and I will present the agenda for the workshop tomorrow (Thursday) at the GSICS VISNIR monthly web meeting.

During the lunar calibration workshop, the session on the lunar model developments will be chaired by Tom.

Tomorrow, on the slides we have for the preparation of the lunar calibration workshop, we have one about the review of the LSICS requirements so that we can discuss at the workshop.

 

Cheers

Seb

-------------------------------------------------------------------------

Sébastien Wagner, Ing.-PhD.

 

Remote Sensing Scientist -  VIS/NIR Calibration

Remote Sensing and Products Division

EUMETSAT

Eumetsat Allee 1

64295 Darmstadt

Germany

 

 Tel: +49-6151 8077344

Email: sebastie...@eumetsat.int

Web: www.eumetsat.int

-------------------------------------------------------------------------

 

From: 'Doelling, David Robert (LARC-E302)' via GSICS Development <gsic...@googlegroups.com>
Sent: Wednesday 8 November 2023 16:47
To: gsic...@googlegroups.com
Subject: [gsics-dev] GSICS VIS/NIR Meeting for Thursday 09 November 2023, with LSICS draft attached

 

WARNING: This email originated outside the organisation. Treat links and attachments with caution.

 


Any email message from EUMETSAT is sent in good faith but shall neither be binding nor construed as constituting a commitment by EUMETSAT, except where provided for in a written agreement or contract or if explicitly stated in the email. Please note that any views or opinions presented in this email are solely those of the sender and do not necessarily represent those of EUMETSAT. This message and any attachments are intended for the sole use of the addressee(s) and may contain confidential and privileged information. Any unauthorised use, disclosure, dissemination or distribution (in whole or in part) of its contents is not permitted. If you received this message in error, please notify the sender and delete it from your system.

Hugh Kieffer

unread,
Nov 8, 2023, 7:16:00 PM11/8/23
to gsic...@googlegroups.com
Dave:

 Discussion of the LSICS draft spec did not make it onto the VIS/NIR agenda.
 Please mention in your introduction that this will follow the listed agenda item.

 Also. I have a new laptop from which I hope to be able to share the draft  pdf. I
 will web in a little early Thursday to review that process.

Hugh



--
Hugh Kieffer                       hhki...@gmail.com
Celestial Reasonings         Cell   775-315-5135
PO Box 1057,  180 Snowshoe Ln., Genoa, NV 89411
Reply all
Reply to author
Forward
0 new messages