The state government on Monday announced its policy on “net metering” for solar grid interactive roof-top and small solar photo voltaic power plants. The principal secretary for Energy Mrutunjay Sahoo issued orders declaring the new policy.
Under net metering concept, energy between export of generated energy and import of Discom energy will be recorded for a billing month.
Based on meter reading, which records both import and export values, the consumer will get money from the Discom or pay the balance amount to Discom. Consumer will generate solar power for self-consumption and feed excess power into the grid. Government felt facility may be provided to consumers to generate power for use and feed excess power into grid when not being consumed.
http://newindianexpress.com/states/andhra_pradesh/article1517499.ece
Regards
Sreedhar Thokala
| The net metering concept works only when grid power supply is available,other wise the process of net metering is not complete. Secondly the Energy meters recording export and import should made available. Thirdly people wants supply during power cuts. As you know that 4 hrs power cuts imposed hampering our lives. Mainly Solar power should supplement the regular power during power cuts so off grid solar system may help little more. Er. R.V.Ramana Rao, B.E., B.L., FIE.,FIV Solar Projects Consultant Certified Energy Auditor/BEE(1600) Lead Auditor for ISO 9001 (QMS) and ISO 14001 (EMS) Divisional Engineer(Retd) APEPDCL VISAKHAPATNAM. A P Ph: 0891 2535251( R) 94908 35145 --- On Tue, 26/3/13, sreedhar thokala <thokala....@gmail.com> wrote:
|
--
You received this message because you are subscribed to Green-India
to discuss India's Energy Future and Sustainable Living.
Green-India
http://green-india.in
Rules & Disclaimer (Important)
http://goo.gl/Te9d2
To unsubscribe, send email to
green-india...@googlegroups.com
---
You received this message because you are subscribed to the Google Groups "Green-India: India's Energy Future and Sustainable Living" group.
To unsubscribe from this group and stop receiving emails from it, send an email to green-india...@googlegroups.com.
For more options, visit https://groups.google.com/groups/opt_out.
Is Grid ready for pushing power? What i understand is for pushing power the substation should know that in realtime. Which means complex smart grid infrastructure. Are we ready?