KENNEDY SPACE CENTER
SHUTTLE and PAYLOAD PROCESSING STATUS_REPORT
Monday, Aug. 6, 2001 (6:30 p.m.)

NOTE: This is an orbiter processing report and does not necessarily reflect
the chronological order of upcoming Space Shuttle flights. Visit
http://www-pao.ksc.nasa.gov/kscpao/schedule/schedule.htm on the KSC Home
Page for the latest schedule of future Shuttle missions.

MISSION: STS-105 - 11th ISS Flight (7A.1) - Leonardo MPLM
VEHICLE: Discovery/OV-103
LOCATION: Launch Pad 39A
TARGET KSC LAUNCH DATE/TIME: August 9, 2001 at 5:38 p.m. EDT
TARGET KSC LANDING DATE/TIME: August 21, 2001 at about 1:17 p.m.
MISSION DURATION: 11 days, 19 hours and 39 minutes
CREW: Horowitz, Sturckow, Barry, Forrester; (ISS up) Culbertson, Dezhurov,
Turin; (ISS down) Usachev, Voss, Helms,
ORBITAL INSERTION ALTITUDE and INCLINATION: 122 nautical miles/51.6 degrees

Shuttle Processing Note: After a thorough engineering evaluation, Shuttle
managers today determined that the hydraulic power unit on Space Shuttle
Discovery's left-hand solid rocket booster is ready for flight with no
additional work required.

The launch countdown began on time at 5 p.m. today in firing room No. 3. and
preparation at Pad 39A continues on schedule toward the Aug. 9, STS-105
launch date. Discovery's aft compartment has been closed out for flight and
Shuttle ordnance installation is complete. Payload interface verification
testing is also complete.

The STS-105 crew and Expedition 3 crew arrived at KSC Sunday at about 1:15
p.m. to begin final preparation for flight.

Upcoming Milestones
Cryogenic loading of Discovery's onboard tanks Aug. 7
Flight crew equipment late stow Aug. 8
Rotating Service Structure moved away from Shuttle Aug. 8 (9:30 p.m.)
External tank loading Aug. 9 (8:42
a.m. - 11:42 a.m.)


-- end --

For automatic e-mail subscriptions to this Shuttle status report or KSC
originated press releases, send an Internet electronic mail message to
do...@news.ksc.nasa.gov . In the body of the message (not the subject line)
type the words "subscribe shuttle-status" or "subscribe ksc-press-release"
(do not use quotation marks). The system will reply with a confirmation via
e-mail of each subscription.

To remove your name from the list at any time, send an e-mail address to
do...@news.ksc.nasa.gov . In the body of the message (not the subject line),
type (no quotes) "unsubscribe shuttle-status" or "unsubscribe
ksc-press-release."

Status reports and other NASA publications are available on the World Wide
Web at:
http://www-pao.ksc.nasa.gov/kscpao/kscpao.htm .

Information about the countdown and mission can be accessed electronically
via the Internet at: http://www.ksc.nasa.gov/shuttle/countdown/ and at
http://spaceflight.nasa.gov/

0 new messages