I have a question about a problem I am having with the gantt chart. I am trying to create a chart within google with no dependencies. When put into google, Google re-sorts the dependencies if the dates aren’t corresponding. The results are that the order of resources are rearranged according to the dates. I attached a Word document to this message, were you can see what I mean. The first and above chart is the start situation, the second picture is the resullt of a data change in the recourse: 3.1 Fase 1 (2017). As you can see, the recource 3.1 is moved up in between the numbers 1.2 and 1.3. This is not the desired result. I need the chart to keep the original order of resources and the dependencies to be flexible and not follow corresponding dates. Is there a solution for this problem?
Regards,
Richard vd Broek