Hi Ale,
I am on a MacOS (Tahoe 26.2) and this dev. build is reacting slowly...The first start took really long (I thought it crashed), also the trends view does not load.
Activities are visible after the first start (I have approx. 2700 in the database), and I can easily switch to Athletes view.But if I want to open either Planning, Trends or Activities afterwards, it does not work anymore.
Hi Ale,
I came from V3.7 Build id: 5005 (Build date: Ost 17 2005 18:18:51).Now back to the latest V3.7 SP1, which works fine.
--
_______________________________________________
Golden-Cheetah-Users mailing list
golden-che...@googlegroups.com
http://groups.google.com/group/golden-cheetah-users?hl=en
---
You received this message because you are subscribed to the Google Groups "golden-cheetah-users" group.
To unsubscribe from this group and stop receiving emails from it, send an email to golden-cheetah-u...@googlegroups.com.
To view this discussion visit https://groups.google.com/d/msgid/golden-cheetah-users/d4b7fa29-11c5-4143-a4fa-c9d92ee3cceen%40googlegroups.com.


I attach the images corresponding to the thread I opened about the pace units.
I've tried yesterday the new build and it works fine (although still with my old problem and the wrong distance),
but I had problems to sync the new ride to Strava.I could see the new ride being recorded, however for some reasons, it wouldn't sync with strava.Later today I'll try to give a better look.

El lunes, 19 de enero de 2026 a la(s) 10:08:20 a.m. UTC-3, Pier escribió:I've tried yesterday the new build and it works fine (although still with my old problem and the wrong distance),Thank you for your feedback, I think it is better to keep you old issue in its own thread.
but I had problems to sync the new ride to Strava.I could see the new ride being recorded, however for some reasons, it wouldn't sync with strava.Later today I'll try to give a better look.
It would be weird since nothing related to Strava has changed from v3.7.1
Amazing, thank you so much for the calendar feature. I am so grateful for this.
Hi, tried on W11, no problems so farTranslations missing on the new features, no problem at all.On calendar when you program a workout, you do it on train and later appears two activities for that day.it would be useful a way to insert a plan or at least more workouts in a round. later they can be moved.
I found the the v3.8-DEV2601 new snapshot working OK now. I am not sure on the state of development but have a couple of observations which might still be WIP.
The !Planned filter entry works well to remove future planned activities from the activity list. From my perspective I would like this to be a user configuration or check box. With the planner loaded with training I and planned activities showing I would never see any recent activities in the list without scrolling when sorted by date.
I'll see to give it another try this week.
Thanks,Pier
I'll see to give it another try this week.Likely you have to talk with other people, not me.
I have now installed v3.8 and checking the possibilities that the new 'Plan View' provides.Most beneficial for me is the PMC Trend Chart to see its evolution until an upcoming challenge, and I still have to find out how to hide planned activities in the 'Activities View' (different topic... I will find that out).
One suggestion / question / remark for the planning of activities:I have seen the possibility to copy activities using a time range, but would an easier copy&paste be possible, such as:click on an activity - copy it - click on another day - paste the activity directly, maybe using right mouse click or cmd+c / cmd+v?

Copy & paste sounds useful to me. I will put some thought into this idea (IMHO copying more than one activity should be possible to prevent jumping between weeks / months). As my resources are currently bound by home renovations, it might take some time, but 3.8 should be possible. As soon as my concept comes into shape I will open a new thread to discuss the solution.
Copy & Paste: If the multi copy becomes to complex, I will for sure drop it. But I will look into itSchedule import / export: great idea, I like it. Probably we have to define our own format for this?
See https://github.com/GoldenCheetah/GoldenCheetah/releases/tag/v3.8-DEV2601Questions and feedback are welcome here, thank you.
Copy & Paste: If the multi copy becomes to complex, I will for sure drop it. But I will look into itSchedule import / export: great idea, I like it. Probably we have to define our own format for this?



Dear developers,I started to test this 38-2601 dev snapshot, and the calendar planning feature looks promising :-)I have noted few issues as follows :1) This issue occurs again : https://github.com/GoldenCheetah/GoldenCheetah/issues/4639(it was fixed in Build id: 5006 Version: V3.7.1)
2)I cannot sync from dropbox :when authenticating from Add cloud account > Acctivities > Dropbox > Add Cloud Wizard >Service CredentialsAuthorizeThe "web based" authenication interface fails to send the 2 factor verification code : neither "Enter" keyboard key, nor "button send" works...
3) in the "plan" view, the tab "Expected PMC (TriScore)" :- appears twice.- I did not find the way to configure the date range for the abscissa axis
Host requires authentication
Problem accessing Dropbox data
for 2) (Dropbox connector)I use Windows 11.However, the authentication succeeded after another try and a long delay.But now, the message appears"Sync with Dropbox
Unable to connect, check your configuration in preferences.Host requires authentication
Problem accessing Dropbox data
"
3) Thanks for the tip about the View > Show left sidebarThe View > reset View makes PMC appear twice again.