Botanical, Morning Glory January Trail Workday Summary

0 views
Skip to first unread message

greg robertson

unread,
Jan 10, 2011, 11:58:05 AM1/10/11
to 3CMB, FASTA List, fasta-euc...@googlegroups.com
Hi, All

Last Saturday's work on West Cuesta brought major improvements to sections of Botanical and Morning Glory and Elevator Trails.

Approximately 15 hardy folk braved sub-freezing temperatures and fog at the top of the Grade. They were rewarded by great working conditions after finally making their way down the trail. Many helped with drain maintenance and rebuilding while heading down the trail to arrive at the bigger work sites. Near the very end of Botanical, a large section of tread was contoured to effect outsloping and drainage. More noticeably, a system of large drains was built and staged to maximize efficacy, flow, and fun. Special thanks to the FASTA crew for helping to make a big difference!

Meanwhile, another 13 folks walked up from the Stenner trailhead and were busily amending some serious erosion and trail damage. Two mudslides on Elevator were addressed. A couple lower MG switchbacks, as well as one of the upper rocky chutes at the top of the trail, were re-armored and back-filled to provide a stable and esthetically pleasing passage. Finally, in a few key areas, large-scale soil importation has helped to contour the tread surface to establish outsloping and drainage. Net result?

A lot of high-quality, sorely-needed work for a well-loved trail, delivered by some seriously industrious and skilled folk--BRAVO!!!!

Thank you,

Central Coast Concerned Mountain Bikers

PS--lottery winners included Marcus Pippin, Lauren Platte. The remaining winning numbers are 794469, 794473, and 794477. Winners may reply to this email address for shwag and/or bike shop gift certificates generously donated by Art's & Baywoond Cycleries, as well as Lezyne.

P1000844.JPG
Reply all
Reply to author
Forward
0 new messages