--
You received this message because you are subscribed to the Google Groups "go-cd" group.
To unsubscribe from this group and stop receiving emails from it, send an email to go-cd+un...@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/go-cd/0885e663-f19f-4d56-8d5b-58f2434ac516%40googlegroups.com.
For more options, visit https://groups.google.com/d/optout.
There's a nice blog post on how to setup Manual Gates in GoCD by Aravind on https://www.gocd.org/2017/05/23/control-deployments-manual-approvals.html.You can also read more about this on the GoCD's Documentation at https://docs.gocd.org/current/configuration/managing_pipelines.html#stage-approvals-in-action.
On Thu, Jun 27, 2019 at 9:47 AM Sergii <lse...@gmail.com> wrote:
Hi everyone,--In our workflow we need few pipelines to be triggered manually only (preceding step requires a lot of manual assessment, so there is no way to automate it as of now).I couldn't find the way to configure pipeline to use manual triggering only - there is always material needs to be configured.There is a workaround to create a pipeline with always failed state and configure pipeline material by specifying it but it doesn't seem to be a proper way.Am I missing something and it is possible?Thanks
You received this message because you are subscribed to the Google Groups "go-cd" group.
To unsubscribe from this group and stop receiving emails from it, send an email to go...@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/go-cd/0885e663-f19f-4d56-8d5b-58f2434ac516%40googlegroups.com.
For more options, visit https://groups.google.com/d/optout.