Jon,
Each spring break, we make a little pilgrimage to the area, just to kill a day, and grab a bite. This year was no exception. We stopped on 35, where, apparently, a few years past, some young maiden precipitated herself. We noted the bike shop will be open 4-24, a good thing if we are to be there in 5-24. The usual spots were all closed for the season, Smiling Pelican, Slipperies, and we ate at the bowling alley in Wabasha, it was better than I would have guessed. Gotta love a bowling alley with Sam Adam’s on hand.
But, I noticed a few troubling things. There is a large Orange County sign in Maiden Rock ominously warning of construction on Wisconsin 35, beginning March 28. Hmm? Wonder how long?
On the other side of the Locke, at the entryway to Colville park is an illuminated sign warning of road closure of the road leading into Colville park,bon the same March 28 date. Stacked on the side of the road are all the things that would be needed for sanitary sewer/storm sewer replacement, with maybe water line service thrown in the mix.
It will be a big project. I’ve noted that you are now retired, which, one would think would give you a bit of time to research these civic projects so we are not completely caught off guard come our hallowed days in May.
Photos, from the wrong time of year. The mountain bike team kid, who rides the version of the DL1 with 7” cranks up the Bay City hill, and the chick in the Ford.
Ted