Well, today the opportunity for new pledges has closed, with the expiration of the 60 day window. I'm really happy with the outcome.
There has been plenty of interest and ideas from our supporters for making the Goldilocks a better result for all. Most of these have been incorporated into the design.
As of last Saturday 4th May, the prototype board design was completed, and files sent off for production. The new images on the Pozible site are based off a rendering of this board design. We think the prototype is pretty great (actually), but there are still some things we know need to be improved or tested before we can commit them to the production (pledge) Goldilocks. I've kept the Google Doc up to date with status, and it now also contains some Errata based on the status going into manufacturing of the prototype. If you're interested in details or the process, check it out.
I'll send another update with some
pictures of the prototype, once it arrives next week.
Until then, thanks again, and best,
Phillip