erm, on behalf of Rajhan I would like to explain lil bit on the updates.

the main point of the meeting would be the changes at the first reactor. prof ask me to use recycle stream to increase conversion.

fyi, at current residence time (it is fixed to 0.134, to fixed reactors volume), in single pass, conversion is only up to 89% .. 

so during the meeting, we discussed on how to further increase the conversion. the solution we get is to increase the flow.

so, lower conversion, increasing flow rate would definitely effect the mass balance and energy balance. 

for now, we plan to stick with whatever conversion. and waiting to finally finalized after 2nd reactors (few changes to be made) to be completed.

sorry that its kinda slow and late that I try to complete clculation for 1st reactor. 

but most of the process didnt change much. just the mass and energy balance.


so WE HAVE TO SET UP A DATE (THE NEAREST TIME) to settle control and hazop which needed to be done ASAP. so that we could have spare time reviewing it back and drawing it.

RajhanRosidi

unread,
Jul 22, 2013, 1:48:34 PM7/22/13
to nurul jannah, fydp_j...@googlegroups.com

for secnd reactor part, the calculation its on the way now. saibal already approve the patern that I use..for now upadate is the air that we combine wth VCH stream tak perlu preheat..just combine the air with vch stream..this is due to highly exothermic condition in reactor..tq

RajhanRosidi

unread,
Jul 22, 2013, 1:49:25 PM7/22/13
to nurul jannah, fydp_j...@googlegroups.com
NEXT MEETING WILL BE WEDNESDAY NIGHT
 
10.30 PM
V3 CAFE

NICHOLAS YIIN

unread,
Jul 22, 2013, 1:51:06 PM7/22/13
to RajhanRosidi, nurul jannah, fydp_j...@googlegroups.com
Okay.. noted.. need to be done asap.. all the thingsss are coming.. haha.. Thanks for the update


--
You received this message because you are subscribed to the Google Groups "FYDP_jan2013" group.
To unsubscribe from this group and stop receiving emails from it, send an email to fydp_jan2013...@googlegroups.com.
For more options, visit https://groups.google.com/groups/opt_out.
 
 



--
YIIN CHUNG LOONG
CHEMICAL ENGINEERING
FINAL YEAR FINAL SEMESTER

k a r e n h i i

unread,
Jul 22, 2013, 6:14:28 PM7/22/13
to NICHOLAS YIIN, RajhanRosidi, nurul jannah, fydp_j...@googlegroups.com
ok noted

Karen Hii 

Bachelor of Chemical Engineering (Hons)
Department of Chemical Engineering,
Universiti Teknologi Petronas
Institute of Technology Petronas SDN.BHD.
Bandar Seri Iskandar
31750 Tronoh
Perak Darul Ridzuan, 
Malaysia.

amy zaf

unread,
Jul 23, 2013, 11:32:39 PM7/23/13
to k a r e n h i i, NICHOLAS YIIN, RajhanRosidi, nurul jannah, fydp_j...@googlegroups.com
SAY NO MORE TO CHANGE......XMBOH........
NO MORE CHANGE!!!!!!!!.HSC
DATABOOK.xlsx
NO MORE CHANGE!!!!!.pdf

frcom...@gmail.com

unread,
Jul 23, 2013, 11:34:12 PM7/23/13
to utp pok cheq FYDP, UTP email karen FYDP, NICHOLAS YIIN, nurul jannah, fydp_j...@googlegroups.com
Noted
Sent from my BlackBerry® wireless device via Vodafone-Celcom Mobile.

From: amy zaf <amy...@gmail.com>
Date: Wed, 24 Jul 2013 11:32:39 +0800
To: k a r e n h i i<karen...@gmail.com>
Subject: Re: updates
Reply all
Reply to author
Forward
0 new messages