MOM#05 Monday (15/10/2012)

2 views
Skip to first unread message

Balqees Zailani

unread,
Oct 16, 2012, 11:35:58 PM10/16/12
to fydp-grou...@googlegroups.com
Dear groupmates,

Attached is the MOM#05 Monday (15/10/2012) for your reference:

No

Agenda

Remarks

1

Opening

-The meeting was commenced by Surah Al Fatihah

 

 

2

Division of Major & Minor Equipment

 

Major:

T-01: Balqees        R-01: Muchapa

T-02: Ilmi               E-03 (HX phase change): Jimmy

T-03: Faiqa

T-04 (Evaporator): Tamil

 

Minor:

 

Jimmy: Compressor K-01 & Pump 02

Balqees: E-07 & P-03

Faiqa: E-08 & P-08

Ilmi: E-09 & P-05

Tamil: E-10 & P-06

Muchapa: E-14 & P-07

 

  • Each person is given one heat exchanger & one pump for minor equipment except jimmy designing compressor.
  • Tamil please upload the finalized PFD for reference.

 

3

Instrumentation & Control (P&ID):

 

 

·         P&ID to be completed by this week as PFD & HEN have already been finalized.

 

4

Pathforward:

 

Work need to be done this week!

 

-P&ID

-PFD

-HAZOP

-Plant Layout

 

Work need to be done next week: week 5

 

-Waste Treatment

 

 

5

Adjournment

The meeting was adjourned by the reciting of Tasbih Kifarah and Surah Al-A’sr.

 

 


--
BALQEES BINTI ZAILANI
Bachelor (Hons) Chemical Engineering,
Universiti Teknologi PETRONAS,


XeRoX SyNeRgY

unread,
Oct 17, 2012, 12:03:28 AM10/17/12
to fydp-grou...@googlegroups.com
thanks

TAMILARASAN MUNIANDY

unread,
Oct 18, 2012, 2:19:13 PM10/18/12
to fydp-grou...@googlegroups.com
this is the P&ID guys.... please take note...... any comment shoot here... tq

On Wed, Oct 17, 2012 at 12:03 PM, XeRoX SyNeRgY <xero...@gmail.com> wrote:
thanks

--
You received this message because you are subscribed to the Google Groups "FYDP GROUP 7_ROCKS" group.
To unsubscribe from this group, send email to fydp-group-7_ro...@googlegroups.com.
For more options, visit https://groups.google.com/groups/opt_out.
 
 



--
Warm Regards

Tamilarasan Muniandy

Tel: (6017) 457 1573

Bachelor of Engineering (Hons) Chemical
Universiti Teknologi PETRONAS
Perak Darul Ridzuan
Malaysia.






Visio-FYPII-P&ID.pdf

nur faiqa

unread,
Oct 18, 2012, 10:42:59 PM10/18/12
to fydp-grou...@googlegroups.com
thanks tamil and balqees
i don't really know how to check the control system, anyway it looks nice to me :)

XeRoX SyNeRgY

unread,
Oct 19, 2012, 6:56:25 AM10/19/12
to fydp-grou...@googlegroups.com
nice..do we need to classify each of type of control that is been used? like standard

Balqees Zailani

unread,
Oct 19, 2012, 10:20:43 AM10/19/12
to fydp-grou...@googlegroups.com
How about the alarm/ interlock system? I see some of the group include it in the P&ID.

On 19 October 2012 18:56, XeRoX SyNeRgY <xero...@gmail.com> wrote:
nice..do we need to classify each of type of control that is been used? like standard

--
You received this message because you are subscribed to the Google Groups "FYDP GROUP 7_ROCKS" group.
To unsubscribe from this group, send email to fydp-group-7_ro...@googlegroups.com.
For more options, visit https://groups.google.com/groups/opt_out.
 
 



--

nur faiqa

unread,
Oct 19, 2012, 7:36:28 PM10/19/12
to fydp-grou...@googlegroups.com
i skimmed through the PTS - Control Readiness. in Appendix B, found about the alarm/trip setting needs to be specified. but not sure if need to include in drawing 

anyway, referring to P&ID from my internship company, i do find interlock in the drawing.
P&id.PDF
PTS 20002039 Advance Process Control Implementation Guide.pdf
PTS 20002045 Advance Process Control Readiness.pdf

Balqees Zailani

unread,
Oct 20, 2012, 12:30:37 AM10/20/12
to fydp-grou...@googlegroups.com
ok thanks faiqa :)

nur faiqa

unread,
Oct 22, 2012, 2:32:59 AM10/22/12
to fydp-grou...@googlegroups.com
just a reminder to those doing plant layout, please include the wastewater treatment facilities :)

nur faiqa

unread,
Oct 22, 2012, 4:53:55 AM10/22/12
to fydp-grou...@googlegroups.com
guys, just now farihah and me met mr azizul, our fydp coordinator last sem.

farihah is also doing the evaporator part replacing the reactor 2, but since it was confusing, as there are water vapor being separated from the evaporator, she asked for opinion.

after some discussion, the main problem here is the design of the evaporator/reactor 2 itself, so instead of designing something we don't know much, he said we can choose two minor equipments to replace the major equipment, and just avoid the evap/reactor part.

this is just FYI. anyway, if tamil has no problem in designing the evap, then no problem. 

tamil, u sure got no change in mass balance or composition into the distillation column 2? cause I need to design the column based on the composition.

tq :) 

TAMILARASAN MUNIANDY

unread,
Oct 22, 2012, 8:15:52 AM10/22/12
to fydp-grou...@googlegroups.com
ya i no diff in mass balance.... i think so.... n for the evaporator if thats the case we follow the coordinators advice la