|
Works |
Detailing |
|
Mass Balance |
Recheck |
|
Energy Balance |
Calculation |
|
Heat Integration |
-Stream extraction -Sprint (PTA, comp curve, GCC) -HEN
|
|
PFD after heat integration |
After HI is finalized. |
|
Print PFD |
|
|
Economy |
-Finalize |
|
Interim Report |
-Acknowledgement -Exec summary -Intro -Chapter 5: HI -Chapter 6: Process Flowsheeting -Economic evaluation -Conclusion |
|
Slides |
-Divide parts & compile |
|
Preparation for presentation |
*Saturday/Sunday |
--
You received this message because you are subscribed to the Google Groups "FYDP GROUP 7_ROCKS" group.
To unsubscribe from this group, send email to fydp-group-7_ro...@googlegroups.com.
For more options, visit https://groups.google.com/groups/opt_out.
As Balqees has pointed out before Raya holiday:
Listed below is some of the works and we do need to work on our slides too.
Crossed items has been updated in the interim report (ver 9).
Preparation for presentation
*Monday/Tuesday
Thank you.
complete with energy balance
--
You received this message because you are subscribed to the Google Groups "FYDP GROUP 7_ROCKS" group.
To unsubscribe from this group, send email to fydp-group-7_ro...@googlegroups.com.
For more options, visit https://groups.google.com/groups/opt_out.