Contents |
Details |
PIC |
|
Executive Summary |
?? |
|
|
3.3 Reactor Synthesis |
to change to fixed bed reactor |
Muchapa |
|
3.5 Heat Integration |
to change to current needs |
|
|
Chapter 4: Instrumentation & Control |
as in guideline or can refer to the report, I have put it there for each part |
Tamil & Balqees |
|
Chapter 5: Safety & Loss Prevention |
Ilmi & Zulhilmi |
|
|
Chapter 6: Waste Treatment |
Faiqa |
|
|
Chapter 7: Process Economics & Cost Estimation |
Zulhilmi |
|
|
Conclusion & Recommendation |
?? |
|
Contents |
Details |
PIC |
|
Executive Summary |
?? |
|
3.5 Heat Integration |
|
to change to current needs |
|
Chapter 4: Instrumentation & Control |
|
to finalized |
Tamil & Balqees |
|
Chapter 5: Safety & Loss Prevention |
Ilmi & Zulhilmi |
|
Chapter 6: Waste Treatment |
Faiqa & Muchapa |
|
Chapter 7: Process Economics & Cost Estimation |
Zulhilmi |
|
|
Conclusion & Recommendation |
?? |
Dear group members,
The submission of the group report soft copy is due 21st Nov 2012, i.e Wednesday next week.
1. Please submit your part by this Sunday, 18th November 2012, for compilation purposes.
2. Anyone can help with Executive Summary and Conclusion?
3. For Process Economics, most of other groups are doing rough estimate of individual equipment cost to be included in this upcoming submission of report. Are we doing it?
|
Contents |
Details |
PIC |
|
Executive Summary |
?? |
|
Heat Integration |
to edit |
Faiqa |
|
Chapter 4: Instrumentation & Control |
|
to finalized by 18 Nov |
Tamil & Balqees |
|
Chapter 5: Safety & Loss Prevention |
Ilmi & Zulhilmi |
|
Chapter 6: Waste Treatment |
Faiqa & Muchapa |
|
Chapter 7: Process Economics & Cost Estimation |
|
?? |
Zulhilmi |
|
|
Conclusion & Recommendation |
?? |
--
You received this message because you are subscribed to the Google Groups "FYDP GROUP 7_ROCKS" group.
To unsubscribe from this group, send email to fydp-group-7_ro...@googlegroups.com.
For more options, visit https://groups.google.com/groups/opt_out.
--
You received this message because you are subscribed to the Google Groups "FYDP GROUP 7_ROCKS" group.
To unsubscribe from this group, send email to fydp-group-7_ro...@googlegroups.com.
For more options, visit https://groups.google.com/groups/opt_out.
|
Contents |
Details |
PIC |
|
Executive Summary |
To submit by tomorrow |
Ilmi |
|
Heat Integration |
Will update on utilities |
Faiqa |
|
Chapter 4: Instrumentation & Control |
|
Final editing in progress |
Tamil & Balqees |
|
|
Conclusion & Recommendation |
To submit by tomorrow |
Muchapa |
|
Parts |
Details |
PIC |
|
Plant Layout |
Scaled Plant Layout in A3 size |
Zulhilmi |
|
Waste Treatment |
Update |
Muchapa |
|
Economics |
Everyone to provide cost estimation of individual equipment Zulhilmi – overall economics calculation |
Zulhimi and ALL |
|
PFD and P&ID |
To update details |
Tamil |
|
|
Compress/edit appropriate part, need 100 page only exclude appendices |
ALL |
|
December 2012 |
||||||||||||
|
|
||||||||||||
|
Sun |
|
Mon |
|
Tue |
|
Wed |
|
Thu |
|
Fri |
|
Sat |
|
2
|
|
3 FYP: Draft Thesis |
|
4
|
|
5 FYDP Presentation |
|
6 FYDP Presentation |
|
7 FYDP Presentation |
|
8
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
9
|
|
FYP: Thesis 10 softbound, softcopy |
|
11 |
|
12 |
|
13 |
|
14 P.O Test 2 MPH 2 |
|
15 Finalize FYDP |
|
|
|
P.O Project Presentation |
|
|
|
|
|
|
|
|
|
|
|
16 Finalize FYDP |
|
17 FYDP Final Report Submission |
|
18 |
|
19 FYP: Presentation |
|
20 FYP: Presentation |
|
21 P.O Report Submission |
|
22 Study Week |
|
December 2012 |
||||||||||||
|
Sun |
|
Mon |
|
Tue |
|
Wed |
|
Thu |
|
Fri |
|
Sat |
|
2 Submit slide to Balqees |
|
3 Print out P&ID Rehearsal at night |
|
4 Rehearsal with SV |
|
5 FYDP - Present |
|
6
|
|
7 |
|
8
|
|
|
|
FYP: Draft Thesis |
|
|
|
|
|
|
|
|
|
|
|
9
|
|
10 Due date for group report work, Faiqa to compile & send draft to SV |
|
11 |
|
12 |
|
13 |
|
14 Due date for individual equipment
|
|
15 Compile report |
|
|
|
FYP: Thesis P.O Project Presentation |
|
|
|
|
|
|
|
P.O Test 2 |
|
|
|
16 Print out report |
|
17 FYDP Final Report (Individual + Group) Submission |
|
18 |
|
19
|
|
20 FYP: Viva |
|
21 FYP: Viva
P.O Project Report Submission |
|
22 Study Week |
|
Parts |
Details |
PIC |
|
Exec Summary |
Update equipment details and anything else if any |
ALL Ilmi |
|
Plant Layout |
Scaled Plant Layout in A3 size |
Zulhilmi |
|
Control |
Update (if any) |
Balqees, Tamil |
|
Economics |
Everyone to provide cost estimation of individual equipment Zulhilmi – overall economics calculation |
Zulhimi and ALL |
|
PFD and P&ID |
To update details *Tamil, please give me visio file, easier to attach in report |
Tamil |
All drawings drawn on the specific paper size as follows:
Process Flow Diagram : A1
Process and Instrumentation Diagram : A1
Individual Equipment : A3
Plant Layout : A3
From briefing session last Tuesday:
1. Page limits: Marks will be deducted if page exceed limit. As a precaution, just lets follow the rules.
Group Report: 100 pg + 20 appendices
- I have already cut here and there, and later for process economics can compress more to get 100 pg as most are calculations and can be attached in the appendices.
- If i cut something that is actually important, do inform.
Individual Report: 20 pg + 5 appendices
2. For submission on 17th Dec (Monday):
To submit:
- Peer evaluation
- 1 Group report (hardcopy and softcopy)
- 6 Individual Equipment Report (from each member) separately (hardcopy and softcopy). *So no need to compile.
Total: 7 ABBA files, 7 PDF files
How:
Each member must be present during submission.
Bring softcopy in CD or pendrive. Submit hardcopy in ABBA Lever Arch Folders (404 Standard) file.
Thanks.
|
Parts |
Details |
PIC |
|
Exec Summary |
Update equipment details and anything else if any |
ALL Ilmi |
|
Plant Layout |
Scaled Plant Layout in A3 size |
Zulhilmi |
|
Control |
Update if any |
Balqees, Tamil |
|
Economics |
Everyone to provide cost estimation of individual equipment Zulhilmi – overall economics calculation |
Zulhimi and ALL |
|
PFD and P&ID |
To update details *Tamil, please give me visio file, easier to attach in report |
Tamil |
All drawings drawn on the specific paper size as follows:
Process Flow Diagram : A1
Process and Instrumentation Diagram : A1
Individual Equipment : A3
Plant Layout : A3
Salam/Hi,
Please send these parts for group report:
|
Parts yet to complete |
Details |
PIC |
|
Plant Layout |
Scaled Plant Layout in A3 size |
Zulhilmi |
|
Economics |
Zulhilmi – overall economics calculation (update) |
Zulhimi and ALL |
For submission of group report, supposedly today:
|
Task |
Details |
PIC |
|
Print hardcopy, PDF softcopy |
Faiqa |
|
|
Print out A1 and A3 drawing |
Process Flow Diagram b4 + after HEN : A1 |
|
Plant Layout : A3 |
Anyone ? |
|
|
Filing |
ABBA Lever Arch Folders (404 Standard) and 4 A4 size plastic wallet for drawing |
Anyone ? |
I also need these data from your individual design, do update me asap okay :)
|
Equipment Tag |
Description |
Diameter (m) |
Length (m) |
|
R-01 |
MAN Reactor (Muchapa) |
?? |
?? |
|
T-01 |
n-Butane Column (74 stages) (Balqees) |
?? |
?? |
|
T-02 |
MAN Scrubber (Ilmi) |
?? |
?? |
|
T-03 |
MAN Purification Column |
1.5 |
22.0 |
|
Equipment Tag |
Description |
|
E-03 |
Service: n-Butane Heat Exchanger Surface area = ?? m2 |
|
E-09 |
Service: Maleic Acid Heat Exchanger Surface area = ?? m2 |
|
P-05 |
Service: Maleic Acid Feed Pump Duty = ?? kW |
|
P-06 |
Service: MAN Pump Duty = ?? kW |
|
K-01 |
Service: Air Compressor Duty = ?? kW |
|
V-01 |
Service: Flash Drum Diameter = ? m ; Height = ? m |
...
[Message clipped]
...
[Message clipped]
...
[Message clipped]
--
You received this message because you are subscribed to the Google Groups "FYDP GROUP 7_ROCKS" group.
To unsubscribe from this group, send email to fydp-group-7_ro...@googlegroups.com.
For more options, visit https://groups.google.com/groups/opt_out.
...
[Message clipped]
already print but then ink finishyet to print, page 91-95 of the report, and also the plant layout in A3 size, can anyone help?