Dear Team Members,

I know this is a bit early, anyway, this is the group report modified from PDP I for PDP II done according to the guidelines.

We need to submit the softcopy of this report by Week 10, on 21st Nov 2012

I removed the mass balance, and merge some other contents. 
But, I think we still need to cut some text here and there to compress the report cause the limit is 100 pages excluding appendices.

So, maybe we can start to figure out how to compress it :) 

Listed below is the incomplete part.

Contents

Details

PIC

Executive Summary

??

3.3 Reactor Synthesis

to change to fixed bed reactor

Muchapa

3.5 Heat Integration

to change to current needs

Chapter 4: Instrumentation & Control

as in guideline or can refer to the report, I have put it there for each part

Tamil & Balqees

Chapter 5: Safety & Loss Prevention

Ilmi & Zulhilmi

Chapter 6: Waste Treatment

Faiqa

Chapter 7: Process Economics & Cost Estimation

Zulhilmi

Conclusion & Recommendation

??


Thank you.

CBB 4023 PDP II G7 rev 1.docx

nur faiqa

unread,
Nov 1, 2012, 10:08:39 PM11/1/12
to fydp-grou...@googlegroups.com
some update

Contents

Details

PIC

Executive Summary

??

3.5 Heat Integration

to change to current needs

Chapter 4: Instrumentation & Control

to finalized

Tamil & Balqees

Chapter 5: Safety & Loss Prevention

Ilmi & Zulhilmi

Chapter 6: Waste Treatment

Faiqa & Muchapa

Chapter 7: Process Economics & Cost Estimation

Zulhilmi

Conclusion & Recommendation

??


submit the softcopy of this report by Week 10, on 21st Nov 2012
* limit is 100 pages excluding appendices
CBB 4023 PDP II G7 rev 2.docx

nur faiqa

unread,
Nov 14, 2012, 7:47:47 AM11/14/12
to fydp-grou...@googlegroups.com

Dear group members,


The submission of the group report soft copy is due 21st Nov 2012, i.e Wednesday next week.


1. Please submit your part by this Sunday, 18th November 2012, for compilation purposes. 

2. Anyone can help with Executive Summary and Conclusion?

3. For Process Economics, most of other groups are doing rough estimate of individual equipment cost to be included in this upcoming submission of report. Are we doing it?


Contents

Details

PIC

Executive Summary

??

Heat Integration

to edit

Faiqa

Chapter 4: Instrumentation & Control

to finalized by 18 Nov

Tamil & Balqees

Chapter 5: Safety & Loss Prevention

Ilmi & Zulhilmi

Chapter 6: Waste Treatment

Faiqa & Muchapa

Chapter 7: Process Economics & Cost Estimation

??

Zulhilmi

Conclusion & Recommendation

??


Thank you.

XeRoX SyNeRgY

unread,
Nov 15, 2012, 9:06:01 PM11/15/12
to fydp-grou...@googlegroups.com
i will do executive summary


--
You received this message because you are subscribed to the Google Groups "FYDP GROUP 7_ROCKS" group.
To unsubscribe from this group, send email to fydp-group-7_ro...@googlegroups.com.
For more options, visit https://groups.google.com/groups/opt_out.
 
 



--
Thank You and Regards,

ILMI BIN ILIAS
Bachelor (Hons) of Chemical Engineering,
Universiti Teknologi PETRONAS,
Bandar Seri Iskandar,
31750 Tronoh,
Perak Darul Ridzuan.
Mobile  : (+6)0195210929
E-mail  : xero...@gmail.com
             xero...@yahoo.com
Blog     : http://xeroxtm.blogspot.com

XeRoX SyNeRgY

unread,
Nov 18, 2012, 12:25:01 AM11/18/12
to fydp-grou...@googlegroups.com
HAZOP Study Analysis on Node 1.docx

Zul Gmie

unread,
Nov 18, 2012, 8:12:10 AM11/18/12
to fydp-grou...@googlegroups.com


On Sun, Nov 18, 2012 at 1:25 PM, XeRoX SyNeRgY <xero...@gmail.com> wrote:

 

--
You received this message because you are subscribed to the Google Groups "FYDP GROUP 7_ROCKS" group.
To unsubscribe from this group, send email to fydp-group-7_ro...@googlegroups.com.
For more options, visit https://groups.google.com/groups/opt_out.
 
 



--
MUHAMMAD ZULHILMI BIN MAHARI
B.Eng.(Hons.) of Chemical.
plant layout _sept_zul.docx

General Grievous

unread,
Nov 18, 2012, 8:13:23 AM11/18/12
to fydp-grou...@googlegroups.com
Felisberto Muchapa
Universiti Teknologi PETRONAS
Chemical Engineering Department
H/P No:+60149048782
Proudly MY_MOZ.

Reactor I synthesis- Improved.docx

Balqees Zailani

unread,
Nov 20, 2012, 3:23:54 AM11/20/12
to fydp-grou...@googlegroups.com
BALQEES BINTI ZAILANI
Bachelor (Hons) Chemical Engineering,
Universiti Teknologi PETRONAS,


P& ID_Rev3.doc

General Grievous

unread,
Nov 20, 2012, 9:30:44 AM11/20/12
to fydp-grou...@googlegroups.com

nur faiqa

unread,
Nov 20, 2012, 10:17:28 AM11/20/12
to fydp-grou...@googlegroups.com
Attached is the draft, still need some proper editing here and there though. will update later.

Contents

Details

PIC

Executive Summary

To submit by tomorrow

Ilmi

Heat Integration

Will update on utilities

Faiqa

Chapter 4: Instrumentation & Control

Final editing in progress

Tamil & Balqees

Conclusion & Recommendation

To submit by tomorrow

Muchapa


1. Please send the latest PFD and PID.

2. After compress some here and there, still excess 30 pages.
    To cut down on pages,
        - I can cut some of waste treatment part (3-4 pages) to appendices
        - Zulhilmi also maybe can cut calculation and tables as appendices
        - Please look into, especially on PDP I stuffs, that can be compressed.

Thanks.
CBB 4023 PDP II G7 draft 1.docx

zul...@gmail.com

unread,
Nov 20, 2012, 10:23:23 AM11/20/12
to fydp-grou...@googlegroups.com
Noted
Sent by DiGi from my BlackBerry® Smartphone

From: nur faiqa <nur....@gmail.com>
Date: Tue, 20 Nov 2012 23:17:28 +0800
Subject: Re: Group Report PDP II

TAMILARASAN MUNIANDY

unread,
Nov 20, 2012, 2:29:36 PM11/20/12
to fydp-grou...@googlegroups.com
Warm Regards

Tamilarasan Muniandy

Tel: (6017) 457 1573

Bachelor of Engineering (Hons) Chemical
Universiti Teknologi PETRONAS
Perak Darul Ridzuan
Malaysia.






Visio-PFD MAN Rev7-AFTER HEN (1).pdf
Visio-PFD MAN Rev6-bfr hen.pdf
VisioREV2-FYPII-P&ID.pdf
FYDPII- REV9 WITHOUT RECYCLE.hsc

nur faiqa

unread,
Nov 20, 2012, 11:52:43 PM11/20/12
to fydp-grou...@googlegroups.com
Need the exec summary and conc. and recommendation before i can compile everything into PDF.
Please send before 2 or 3 as I won't be available afterwards.

Currently about 130 pages, maybe we just send this, and compressed later, for final submission.

Thanks.
Group Report PDP II G7 draft 2.docx

XeRoX SyNeRgY

unread,
Nov 21, 2012, 12:29:03 AM11/21/12
to fydp-grou...@googlegroups.com
working on it...wait ya
Thank You and Regards,

ILMI BIN ILIAS
Bachelor (Hons) of Chemical Engineering,
Universiti Teknologi PETRONAS,

Bandar Seri Iskandar,
31750 Tronoh,
Perak Darul Ridzuan.

nur faiqa

unread,
Nov 21, 2012, 12:30:41 AM11/21/12
to fydp-grou...@googlegroups.com
no prob

XeRoX SyNeRgY

unread,
Nov 21, 2012, 12:44:06 AM11/21/12
to fydp-grou...@googlegroups.com
excutive summary
EXECUTIVE_SUMMARY.doc

General Grievous

unread,
Nov 21, 2012, 1:53:31 AM11/21/12
to fydp-grou...@googlegroups.com
attached is the conclusion. still have to work on the recommendation.
conlcusion.docx

General Grievous

unread,
Nov 21, 2012, 2:19:29 AM11/21/12
to fydp-grou...@googlegroups.com
attached is the recommendation.
recommendation.docx

nur faiqa

unread,
Nov 21, 2012, 2:26:26 AM11/21/12
to fydp-grou...@googlegroups.com
give my laptop sometime to convert to pdf, btw here is the word version
Group Report PDP II G7.docx

nur faiqa

unread,
Nov 21, 2012, 2:50:07 AM11/21/12
to fydp-grou...@googlegroups.com
sorry late, laptop hang
Group Report PDP II G7.pdf

Balqees Zailani

unread,
Nov 21, 2012, 2:51:30 AM11/21/12
to fydp-grou...@googlegroups.com
TQVM faiqa :)

XeRoX SyNeRgY

unread,
Nov 21, 2012, 2:51:55 AM11/21/12
to fydp-grou...@googlegroups.com
nice...thanks faiqa

General Grievous

unread,
Nov 21, 2012, 7:53:55 AM11/21/12
to fydp-grou...@googlegroups.com
LAte thank you Faiqa.
Please when u graduate upgrade ur laptop or get a new one.
LOL

XeRoX SyNeRgY

unread,
Nov 21, 2012, 11:37:38 AM11/21/12
to fydp-grou...@googlegroups.com
haha..i already sent the report..thanks you guys :D

TAMILARASAN MUNIANDY

unread,
Nov 21, 2012, 11:51:08 AM11/21/12
to fydp-grou...@googlegroups.com
thanks faiqa.... n plan  for my treat ya :)

nur faiqa

unread,
Nov 21, 2012, 12:00:58 PM11/21/12
to fydp-grou...@googlegroups.com
thanks to everyone too!

nur faiqa

unread,
Nov 26, 2012, 6:52:07 PM11/26/12
to fydp-grou...@googlegroups.com
Salam/Hi,

We still need to finalize our report :)

Parts

Details

PIC

Plant Layout

Scaled Plant Layout in A3 size

Zulhilmi

Waste Treatment

Update

Muchapa

Economics

Everyone to provide cost estimation of individual equipment

Zulhilmi – overall economics calculation

Zulhimi and ALL

PFD and P&ID

To update details

Tamil

 

Compress/edit appropriate part, need 100 page only exclude appendices

ALL

 
All drawings drawn on the specific paper size as follows:
Process Flow Diagram                          : A1
Process and Instrumentation Diagram   : A1
Individual Equipment                           : A3
Plant Layout                                        : A3

Tentatively, according to Gantt Chart in the guidelines

December 2012

 

Sun

 

Mon

 

Tue

 

Wed

 

Thu

 

Fri

 

Sat

2

 

 

3

FYP: Draft Thesis

 

4

 

 

5

FYDP Presentation

 

6

FYDP Presentation

 

7

FYDP Presentation

 

8

 

 

 

 

 

 

 

 

 

 

 

 

 

 

9

 

 

FYP: Thesis     10

softbound, 

softcopy

 

11

 

12

 

13

 

14

P.O Test 2

MPH 2

 

15

Finalize FYDP

 

 

P.O Project Presentation

 

 

 

 

 

 

 

 

 

 

16

Finalize FYDP

 

17

FYDP Final Report Submission

 

18

 

19

FYP: Presentation

 

20

FYP: Presentation

 

21

P.O Report Submission

 

22

Study Week

Evaluation Form for Group Report.docx

XeRoX SyNeRgY

unread,
Nov 26, 2012, 8:29:26 PM11/26/12
to fydp-grou...@googlegroups.com
thanks faiqa for remainder

Balqees Zailani

unread,
Nov 26, 2012, 8:31:35 PM11/26/12
to fydp-grou...@googlegroups.com
Thanks faiqa. Btw do anyone knows what do we actually need to present for nxt week presentation?
does it cover individual design as well?

nur faiqa

unread,
Nov 26, 2012, 8:36:17 PM11/26/12
to fydp-grou...@googlegroups.com
based on the evaluation form, all on group report, not including individual equipment
Evaluation form for Presentation.docx

Balqees Zailani

unread,
Nov 26, 2012, 8:37:24 PM11/26/12
to fydp-grou...@googlegroups.com
ouh alright. thanks faiqa! :)

XeRoX SyNeRgY

unread,
Nov 26, 2012, 8:40:43 PM11/26/12
to fydp-grou...@googlegroups.com
ok...so when we want to meet our sv? tomorrow? after poster presentation?

General Grievous

unread,
Nov 27, 2012, 3:58:00 AM11/27/12
to fydp-grou...@googlegroups.com
thank u

nur faiqa

unread,
Nov 29, 2012, 10:25:58 AM11/29/12
to fydp-grou...@googlegroups.com
As per discussion in the meeting just now,

1. Due date for everyone to send their part for the group report: 10 Dec 2012

2. For individual equipment, we will just compile without sending a draft to our SV. Appreciate it if you can send your individual equipment part by 13 Dec, but since 4 of us will have test on morning of 14 Dec, please submit the latest by 10 pm 14 Dec 2012.

3. You can refer the deadlines in the calendar below. Those shaded in colour are related to FYDP.

Thank you.

December 2012

Sun

 

Mon

 

Tue

 

Wed

 

Thu

 

Fri

 

Sat

2

Submit slide to Balqees

 

3

Print out P&ID

Rehearsal at night

 

4

Rehearsal with SV

 

5

FYDP -  Present

 

6

 

 

7

 

8

 

 

 

FYP: Draft Thesis

 

 

 

 

 

 

 

 

 

 

9

 

 

10

Due date for group report work,

Faiqa to compile & send draft to SV

 

11

 

12

 

13

 

14

Due date for individual equipment

 

 

15

Compile report

 

 

FYP: Thesis

P.O Project Presentation

 

 

 

 

 

 

 

P.O Test 2

 

 

16

Print out report

 

17

FYDP Final Report (Individual + Group) Submission

 

18

 

19

 

 

20

FYP: Viva

 

21

FYP: Viva

 

P.O Project Report Submission

 

22

Study Week

XeRoX SyNeRgY

unread,
Nov 29, 2012, 6:51:36 PM11/29/12
to fydp-grou...@googlegroups.com
nice faiqa..thank you..wish all of you for the best effort till the end 

nur faiqa

unread,
Dec 5, 2012, 10:13:01 AM12/5/12
to fydp-grou...@googlegroups.com
Salam/Hi,

Just for reminder, please send me the following to compile by 10 Dec as we want to send draft to our SV before final submission.

 

Parts

Details

PIC

Exec Summary

Update equipment details and anything else if any

ALL

Ilmi

Plant Layout

Scaled Plant Layout in A3 size

Zulhilmi

Control

Update (if any)

Balqees, Tamil

Economics

Everyone to provide cost estimation of individual equipment

Zulhilmi – overall economics calculation

Zulhimi and ALL

PFD and P&ID

To update details

*Tamil, please give me visio file, easier to attach in report

Tamil

 

All drawings drawn on the specific paper size as follows:
Process Flow Diagram                          : A1
Process and Instrumentation Diagram   : A1
Individual Equipment                           : A3
Plant Layout                                        : A3


                                                                                                                                                                                                                                                          


From briefing session last Tuesday:


1. Page limits: Marks will be deducted if page exceed limit. As a precaution, just lets follow the rules.

Group Report: 100 pg + 20 appendices 

- I have already cut here and there, and later for process economics can compress more to get 100 pg as most are calculations and can be attached in the appendices.

- If i cut something that is actually important, do inform.

Individual Report: 20 pg + 5 appendices

2. For submission on 17th Dec (Monday):

To submit:

- Peer evaluation

- 1 Group report (hardcopy and softcopy)

- 6 Individual Equipment Report (from each member) separately (hardcopy and softcopy). *So no need to compile.

  Total: 7 ABBA files, 7 PDF files

How:

Each member must be present during submission.

Bring softcopy in CD or pendrive. Submit hardcopy in ABBA Lever Arch Folders (404 Standard) file.



 Thanks.

PDP II G7 cut rev_1.docx

General Grievous

unread,
Dec 5, 2012, 1:45:42 PM12/5/12
to fydp-grou...@googlegroups.com
Updated Gas treatment with SV comments on the classification of the substances.


...

[Message clipped]  
GAs treatment Update.docx

nur faiqa

unread,
Dec 16, 2012, 4:46:22 AM12/16/12
to fydp-grou...@googlegroups.com
Salam/Hi,

Reminder, this is still not completed yet.

 

Parts

Details

PIC

Exec Summary

Update equipment details and anything else if any

ALL

Ilmi

Plant Layout

Scaled Plant Layout in A3 size

Zulhilmi

Control

Update if any

Balqees, Tamil

Economics

Everyone to provide cost estimation of individual equipment

Zulhilmi – overall economics calculation

Zulhimi and ALL

PFD and P&ID

To update details

*Tamil, please give me visio file, easier to attach in report

Tamil

All drawings drawn on the specific paper size as follows:
Process Flow Diagram                          : A1
Process and Instrumentation Diagram   : A1
Individual Equipment                           : A3
Plant Layout                                        : A3

Thank you.

zul...@gmail.com

unread,
Dec 16, 2012, 4:50:34 AM12/16/12
to fydp-grou...@googlegroups.com
Ok, noted

Bila nk compile blk, mlm ni k?
Sent by DiGi from my BlackBerry® Smartphone

From: nur faiqa <nur....@gmail.com>
Date: Sun, 16 Dec 2012 17:46:22 +0800

TAMILARASAN MUNIANDY

unread,
Dec 16, 2012, 5:55:06 AM12/16/12
to fydp-grou...@googlegroups.com
...

[Message clipped]  
PFD MAN Rev6-bfr hen.vsd
PFD MAN Rev7-AFTER HEN (1).vsd
FYPII-P&ID.vsd

nur faiqa

unread,
Dec 16, 2012, 8:26:34 PM12/16/12
to fydp-grou...@googlegroups.com

Salam/Hi,

 Please send these parts for group report:

Parts yet to complete

Details

PIC

Plant Layout

Scaled Plant Layout in A3 size

Zulhilmi

Economics

Zulhilmi – overall economics calculation (update)

Zulhimi and ALL

 

 For submission of group report, supposedly today:

Task

Details

PIC

Print hardcopy, PDF softcopy

Faiqa

Print out A1 and A3 drawing

Process Flow Diagram b4 + after HEN : A1


Process and Instrumentation Diagram : A1

Plant Layout : A3

Anyone ?

Filing

ABBA Lever Arch Folders (404 Standard) and 4 A4 size plastic wallet for drawing

Anyone ?

 

I also need these data from your individual design, do update me asap okay :)

 

Equipment Tag

Description

Diameter (m)

Length (m)

R-01

MAN Reactor (Muchapa)

??

??

T-01

n-Butane Column (74 stages) (Balqees)

??

??

T-02

MAN Scrubber (Ilmi)

??

??

T-03

MAN Purification Column

1.5

22.0

 

Equipment Tag

Description

E-03

Service: n-Butane Heat Exchanger

Surface area = ?? m2

E-09

Service: Maleic Acid Heat Exchanger

Surface area = ?? m2

P-05

Service: Maleic Acid Feed Pump

Duty = ?? kW

P-06

Service: MAN Pump

Duty =  ?? kW

K-01

Service: Air Compressor

Duty = ?? kW

V-01

Service: Flash Drum

Diameter = ? m ; Height = ? m

 




iLMi iLiAs

unread,
Dec 16, 2012, 8:44:18 PM12/16/12
to fydp-grou...@googlegroups.com
T-02

Diameter : 1.4m
Length : 15m

P-05
0.0525 kW

E-09
36.8615 m2


...

[Message clipped]  

zul...@gmail.com

unread,
Dec 16, 2012, 9:05:39 PM12/16/12
to fydp-grou...@googlegroups.com
I will send my part tomorrow, today I'm off to kl, buat kulit keras.. Sorry
Sent by DiGi from my BlackBerry® Smartphone

From: nur faiqa <nur....@gmail.com>
Date: Mon, 17 Dec 2012 09:26:34 +0800

iLMi iLiAs

unread,
Dec 16, 2012, 9:10:54 PM12/16/12
to fydp-grou...@googlegroups.com
i will do the filing

Balqees Zailani

unread,
Dec 16, 2012, 9:16:12 PM12/16/12
to fydp-grou...@googlegroups.com
Faiqa,

 71 stages

T-01:

Diameter: 1.893m
Length: 28.4m , including top and bottom head: 30.4m

Tamil,

Can u please send the PFD version for PFD & P&ID. 
Thank you

Balqees Zailani

unread,
Dec 16, 2012, 9:17:13 PM12/16/12
to fydp-grou...@googlegroups.com
Sorry *PDF 

General Grievous

unread,
Dec 16, 2012, 9:27:19 PM12/16/12
to fydp-grou...@googlegroups.com
I didnt do the economics estimation of the pump and the heat exchnager, since they arent a must.
But for the rest of the data:
R-01:

Diameter:  10.2576m
Length: 10.5m , including top and bottom head



E-04:
Area: 23.487m2


P-09:
Duty:
0.052kW


...

[Message clipped]  

General Grievous

unread,
Dec 16, 2012, 9:32:28 PM12/16/12
to fydp-grou...@googlegroups.com
I would like to,
is it that we submit the individual report one by one or all in 1cd??
No??


...

[Message clipped]  

Balqees Zailani

unread,
Dec 16, 2012, 9:46:28 PM12/16/12
to fydp-grou...@googlegroups.com
Latest info:

For individual report compile in 1 file only. and for soft copy burn in 1 CD (1 group report, 6 individual reports)

Tonight: Meeting at 10:30 p.m usual place., we will do the compiling tonight. Please print your individual reports and bring it tonight. For those who are not available, please bring it during submission. 

Thank you.

--
You received this message because you are subscribed to the Google Groups "FYDP GROUP 7_ROCKS" group.
To unsubscribe from this group, send email to fydp-group-7_ro...@googlegroups.com.
For more options, visit https://groups.google.com/groups/opt_out.
 
 

iLMi iLiAs

unread,
Dec 16, 2012, 9:56:00 PM12/16/12
to fydp-grou...@googlegroups.com, Aliya PE UTP
please send individual report to me..i will burn to cd
Thank You and Regards,

ILMI BIN ILIAS
Bachelor (Hons) of Chemical Engineering,
Universiti Teknologi PETRONAS,

nur faiqa

unread,
Dec 16, 2012, 10:00:54 PM12/16/12
to fydp-grou...@googlegroups.com
noted. for group report, should i just print up to before the economics part, or just wait until everything finish?

TAMILARASAN MUNIANDY

unread,
Dec 17, 2012, 12:50:23 AM12/17/12
to fydp-grou...@googlegroups.com
ok the pnid n pfd...no changes rite... so i'll print them later



...

[Message clipped]  

nur faiqa

unread,
Dec 18, 2012, 8:21:25 AM12/18/12
to fydp-grou...@googlegroups.com
group report, only left with the value for economics part to be updated and plant layout.
PDP II G7 final rev_1.docx

nur faiqa

unread,
Dec 18, 2012, 10:13:44 AM12/18/12
to fydp-grou...@googlegroups.com
GROUP07 PDP II SEPT 2012.docx

nur faiqa

unread,
Dec 18, 2012, 10:32:56 AM12/18/12
to fydp-grou...@googlegroups.com
only one thing missing - plant layout
Group07_PDP II_SEPT 2012 .pdf

Balqees Zailani

unread,
Dec 18, 2012, 11:13:18 AM12/18/12
to fydp-grou...@googlegroups.com
Thank you faiqa :)

btw when are we planning to meet up and compile the rest of the parts? and i guess meet raja shekar right after compiling?

nur faiqa

unread,
Dec 18, 2012, 8:44:28 PM12/18/12
to fydp-grou...@googlegroups.com
with old plant layout

On Wed, Dec 19, 2012 at 7:48 AM, nur faiqa <nur....@gmail.com> wrote:
already print but then ink finish

yet to print, page 91-95 of the report, and also the plant layout in A3 size, can anyone help?
Group07_PDP II_SEPT 2012.pdf

Zul Gmie

unread,
Dec 19, 2012, 1:05:03 AM12/19/12
to fydp-grou...@googlegroups.com
plant layout dah A3 print? nk g print A3 ni, kalu belum boleh skali
MUHAMMAD ZULHILMI BIN MAHARI
B.Eng.(Hons.) of Chemical.

nur faiqa

unread,
Dec 19, 2012, 1:13:19 AM12/19/12
to fydp-grou...@googlegroups.com
latest

On Wed, Dec 19, 2012 at 2:05 PM, nur faiqa <nur....@gmail.com> wrote:
blom, tolong print, thanks
Group07_PDP II_SEPT 2012.pdf

Zul Gmie

unread,
Dec 19, 2012, 1:19:23 AM12/19/12
to fydp-grou...@googlegroups.com
de evalution form? nk print

TAMILARASAN MUNIANDY

unread,
Dec 19, 2012, 1:31:19 AM12/19/12
to fydp-grou...@googlegroups.com
...

[Message clipped]  
Group07_PDP2_SEPT_2012_12211.pdf
Reply all