No |
Agenda |
Remarks |
|
1 |
Opening -The meeting was commenced by Surah Al Fatihah
|
|
|
2 |
Discussion on Heat Integration -Based from Madam’s feedback on the lack of freedom of our streams, we have to recheck our HI. -Discussion took place starting from extracting the stream data as well as correcting some parameters in simulation.
|
|
|
3 |
Instrumentation & Control (P&ID):
Discussion on the base layer control & P&ID on the major equipments.
|
· The control schemes for pre-heat exchanger and minor2 part will be done once PFD is finalized. · Present the P&ID for major equipments to madam in the next meeting.
|
|
4 |
Pathforward:
-Meeting with SV on Thursday, 4:00p.m. -Finalized P&ID ASAP -Week 4 (Next week): Start with Safety & loss prevention (HAZOP) -Week 4 &5: Concept for waste treatment & Plant water utility system
|
|
|
5 |
Adjournment The meeting was adjourned by the reciting of Tasbih Kifarah and Surah Al-A’sr.
|
|

--
You received this message because you are subscribed to the Google Groups "FYDP GROUP 7_ROCKS" group.
To unsubscribe from this group, send email to fydp-group-7_ro...@googlegroups.com.
For more options, visit https://groups.google.com/groups/opt_out.