1. Ilmi - please rephrase the sentence (pg 3) Comment P12. Ilmi - please simplify the diagram (Figure 4, pg 6) Comment P23. Muchapa - please rephrase, avoid long sentences (page 19) Comment P124. Muchapa - please rephrase (page 22) Comment P145. Ilmi - (page 28) Comment P15
1. Tamil - Please provide Appendix 2.B.1 (pg 7) and 2.C.1 (pg 8)2. Balqees - Please provide Appendix - MSDS Table (pg 34)3. Faiqa - Please provide Appendix - MSDS (pg 42)4. Faiqa - to include kmol% in Table 18 (pg 47)
--
You received this message because you are subscribed to the Google Groups "FYDP GROUP 7_ROCKS" group.
To unsubscribe from this group, send email to fydp-group-7_ro...@googlegroups.com.
For more options, visit https://groups.google.com/groups/opt_out.
SV's comment on Lit. Rev:
2. Ilmi - please simplify the diagram (Figure 4, pg 6) Comment P2
Missing things:
2. Balqees - Please provide Appendix - MSDS Table (pg 34)
4. Faiqa - to include kmol% in Table 18 (pg 47)
| 13 |
Submission of Interim Report DRAFT to supervisor |
13th Aug | - |
- | Student to get feedback and make corrections before submit the final version |
| 14 | Submission of Interim Report to Chem. Eng Dept Office | Strictly 27th Aug |
- | Chemical Eng. Office. (Cik Munizarina/ Pn Suhana) 04-03-02 | All students to prepare 2 copies. Coordinator to distribute to Supervisor and Internal Examiner for assessment. |
1. MB of Fractional Distillation (pg 61) - reconfirm temp & pressure - Faiqa & Balqees2. Update pg 46, provide calculation for Appendix E-1 (pg 83) - Faiqa3. MB Reactor I (Fluidized Bed Reactor) (pg 62) - clarify highlighted phrase/provide link of reference - Muchapa4. MB Reactor II (Plug Flow Reactor) (pg 65) - clarify highlighted phrase - Muchapa5. MB Distillation Column (pg 66) - provide updated calculation - Ilmi/Muchapa?6. Overall Mass Balance - update the overall mass balance - Tamil7. Simulation - provide summary of data - Tamil8. Economics Evaluation - Jimmy
latest one for interim report
|
Part |
Task |
PIC |
|
Executive Summary |
Write-up |
Ilmi |
|
Mass Balance |
To recheck and update with the finalized mass balance |
Muchapa |
|
Heat Integration |
Write-up of some theory and work done for HI |
Faiqa n Balqees |
|
Process Flowsheeting |
Update the final PFD |
Tamil |
|
Economics Evaluation |
To finalize (if any for the compressor part) |
Zul |
|
Conclusion and Recommendation |
Write-up |
Muchapa |
|
All |
Everyone to recheck if anything is missing out/needs editing for each part that has been done |
All |
|
References |
Provide references used (if any) |
All |
|
Write-up according to format |
Faiqa |
|
Provide references details (can give me link or the material (pdf etc) itself) |
|
|
[PRWEB, 2008]. Pg 15 |
Muchapa |
|
[ICIS, 2009]. Pg 18 |
|
|
[PRWEB, 2008]. Pg 22 |
|
|
(Doherty M. et al. 2008) Pg 92 |
|
|
(Geri F. & R.Bubbico, 2003). Pg 31 |
Balqees |
|
(Ministero dell’Interno, 1986; Di Cave, 2002). Pg 32 |
|
|
Turton et al. Pg 53 |
Ilmi |
|
(Monarch Separators n.d.). Pg 59 |
|
|
SUBMISSION OF PDP 1 INTERIM REPORT
Firstly, thank you very much to all for the participation and cooperation during the interim oral presentations.
Please kindly take note that the submission date for the PDP 1 Interim Report is on 3rd September 2012 (Monday) before 5 p.m. Please submit your report to my office at Block 5 Level 3 Room 34 (05-03-34).
Please ensure that all the comments given during the presentation are incorporated into the final interim report. Give the priority to the comments/correction on the fundamentals of the design e.g. comments on process flow diagram and operating conditions of equipments.
Best of luck in your exams.
Best regards, Azizul bin Buang
|
|
ANNOUNCEMENT: CORRECTION ON PFD AND SIMULATION WORK IN LAB 05-02-12
Students Please be informed that lab 05-02-12 will be opened tomorrow (Friday 31/8/2012) for you to carry out the correction required on your simulation and flow diagram of your design project.
Regards Azizul Buang
Those who are having an exam today (Thursday), please put aside your PDP 1 matters for a while and focus on your paper. Do not worry too much on your PDP 1, it is just part of your learning process!
|
Finalizing Interim Report
|
Part |
Task |
PIC |
Note |
|
Mass Balance |
To recheck and update with the finalized mass balance |
Muchapa |
|
|
Process Flowsheeting |
|
Update the final PFD |
Tamil |
|
Print out on Monday (3rd Sept) before submission due 5pm |
|||
|
Economics Evaluation |
To finalize for the utilities and compressor calculation |
Zul |
|
|
Conclusion and Recommendation |
Write-up |
Muchapa |
|
|
All |
Everyone to recheck if anything is missing out/needs editing for each part that has been done |
All |
|
|
References |
Provide references used (if any) |
All |
|
|
Write-up according to format |
Faiqa |
|
|
|
Provide references details (can give me link or the material (pdf etc) itself) |
|||
|
[PRWEB, 2008]. Pg 15 |
Muchapa |
|
|
|
[ICIS, 2009]. Pg 18 |
|||
|
[PRWEB, 2008]. Pg 22 |
|||
|
(Doherty M. et al. 2008) Pg 92 |
|||
|
Turton et al. Pg 53 |
Ilmi |
|
|
(Monarch Separators n.d.). Pg 59 |
|
Available items yet to be compiled |
Compile the energy balance part |
Faiqa |
|
Note:
for heat integration. Some changes on temperature and changes in required utilities also (highlighted)
tamil
1. please update the stream table with updated temperature.
2. the stream number in pfd, for me should be alright. but, for E-11, the hot utility is not LP steam, but MP steam
zulhilmi
1. please take note on the minor changes of utility values for the economic potential calculation
2. some of my friends said, no need for equipment calculation. the compressor calculation is required this semester? or we're just going to calculate it?
Report Submission
|
|
Task |
PIC |
|
Print Report |
There are over 100 pages. How should we print it? Or anyone want to volunteer? My ink finish already after printing for fyp report. |
Anyone? |
|
Folder |
Buy folder and plastic wallets Folder Type: ABBA Lever Arch Files (404 Standard) Plactic wallets: to insert the folded A1 PFD |
Anyone? |
I will buy the folder and plastic wallets
Finalizing Interim Report
|
Part |
Task |
PIC |
Note |
|
Process Flowsheeting |
|
Update the final PFD |
Tamil |
Print out on Monday (3rd Sept) before submission due 5pm |
|
Economics Evaluation |
To finalize for the utilities and compressor calculation |
Zul |
|
|
Conclusion and Recommendation |
Write-up |
Muchapa |
|
|
All |
Everyone to recheck if anything is missing out/needs editing for each part that has been done |
All |
|
|
References |
Provide references used (if any) |
All |
|
|
Write-up according to format |
Faiqa |
|
|
Available items yet to be compiled |
Energy balance |
Faiqa |
|
|
Stream table (before & after HEN) |
Note:
for heat integration. Some changes on temperature and changes in required utilities also (highlighted)
tamil
1. please update the stream table with updated temperature.
2. for E-11, the hot utility is not LP steam, but MP steam
zulhilmi
1. please take note on the minor changes of utility values for the economic potential calculation
2. some of my friends said, no need for equipment calculation. the compressor calculation is required this semester? or we're just going to calculate it?
Report Submission
|
|
Task |
PIC |
|
Print Report |
There are almost 130 pages. How should we print it? Or anyone want to volunteer? |
Anyone? |
|
Folder |
|
Buy folder and plastic wallets |
Folder Type: ABBA Lever Arch Files(404 Standard) |
|
Plactic wallets: to insert the folded A1 PFD |
|
Ilmi |
done with my part
thanks for the updates,
my appendix
--
You received this message because you are subscribed to the Google Groups "FYDP GROUP 7_ROCKS" group.
To unsubscribe from this group, send email to fydp-group-7_ro...@googlegroups.com.
For more options, visit https://groups.google.com/groups/opt_out.
--Warm RegardsTamilarasan MuniandyTel: (6017) 457 1573Email: ara...@gmail.comBachelor of Engineering (Hons) Chemical
Universiti Teknologi PETRONAS
Perak Darul Ridzuan
Malaysia.
--
You received this message because you are subscribed to the Google Groups "FYDP GROUP 7_ROCKS" group.
To unsubscribe from this group, send email to fydp-group-7_ro...@googlegroups.com.
For more options, visit https://groups.google.com/groups/opt_out.
--
You received this message because you are subscribed to the Google Groups "FYDP GROUP 7_ROCKS" group.
To unsubscribe from this group, send email to fydp-group-7_ro...@googlegroups.com.
For more options, visit https://groups.google.com/groups/opt_out.
--
Thank You and Regards,
ILMI BIN ILIAS
Bachelor (Hons) of Chemical Engineering,
Universiti Teknologi PETRONAS,
Bandar Seri Iskandar,
31750 Tronoh,
Perak Darul Ridzuan.
Mobile : (+6)0195210929
E-mail : xero...@gmail.com
xero...@yahoo.com
Blog : http://xeroxtm.blogspot.com
--
You received this message because you are subscribed to the Google Groups "FYDP GROUP 7_ROCKS" group.
To unsubscribe from this group, send email to fydp-group-7_ro...@googlegroups.com.
For more options, visit https://groups.google.com/groups/opt_out.
--
You received this message because you are subscribed to the Google Groups "FYDP GROUP 7_ROCKS" group.
To unsubscribe from this group, send email to fydp-group-7_ro...@googlegroups.com.
For more options, visit https://groups.google.com/groups/opt_out.
--
Felisberto Muchapa
Universiti Teknologi PETRONAS
Chemical Engineering Department
H/P No:+60149048782
Proudly MY_MOZ.
--
You received this message because you are subscribed to the Google Groups "FYDP GROUP 7_ROCKS" group.
To unsubscribe from this group, send email to fydp-group-7_ro...@googlegroups.com.
For more options, visit https://groups.google.com/groups/opt_out.
--
You received this message because you are subscribed to the Google Groups "FYDP GROUP 7_ROCKS" group.
To unsubscribe from this group, send email to fydp-group-7_ro...@googlegroups.com.
For more options, visit https://groups.google.com/groups/opt_out.
Finalizing Interim Report
|
Part |
Task |
PIC |
Note |
|
Process Flowsheeting |
Update the final PFD |
Tamil |
|
Print out on Monday (3rd Sept) before submission due 5pm |
1. Please update the stream table with updated temperature. |
|
2. for E-11, the hot utility is not LP steam, but MP steam |
|
Economics Evaluation |
|
To finalize for the utilities and compressor calculation |
Zul |
|
1. please take note on the minor changes of utility values for the economic potential calculation |
|
2. some of my friends said, no need for equipment calculation. the compressor calculation is required this semester? or we're just going to calculate it? |
|
All |
Everyone to recheck/go through the report |
All |
At least check your own part if anything needs final editing |
Report Submission
|
|
Task |
PIC |
|
Print Report |
The no of pages are almost 130++ and counting. How should we print it? Or anyone want to volunteer? |
Anyone? |
|
Folder |
Buy folder and plastic wallets Folder Type: ABBA Lever Arch Files(404 Standard) Plactic wallets: to insert the folded A1 PFD |
Ilmi |
all the best for CA tomorrow :)