Sequence of Presenters

332 views
Skip to first unread message

izzati amri

unread,
Jul 26, 2011, 8:39:04 PM7/26/11
to fydp-g...@googlegroups.com
Salam,

Dear all,

Kindly please respond a.s.a.p., preferable before 7pm.


Faiz

Fauzi
Azizi
Izzati
Sofia


Opening + Intro
Alternative Processes
Plant Design
Material Balance
Heat Integration
Process Flowsheeting
Instrumentation & Control
Safety & Loss Prevention
Waste Treatment
Process economics & cost estimation
Conclusion

In order to make the transition from one presenter to another look smooth, the new sequence is suggested to be as follow:


Opening + Intro
Alternative Processes
Plant Design
Material Balance
Process Flowsheeting
Instrumentation & Control
Heat Integration
Safety & Loss Prevention
Waste Treatment
Process economics & cost estimation
Conclusion

The main purpose I listed this down earlier is to make sure everyone have a balance amount of things to be presented & to help the respective presenter to be well prepared for their respective parts since there are some changes have to be made in order to avoid imbalance. Kindly please respond in case you have any idea @ comment regarding the sequence.


--
Regards,
 
"Learn to pray not because you need something, but because you've ought to thanks Him about something"
 
~Nur Izzati Binti Boher @ Bujang Amri~
Chemical Engineering Programme,
Universiti Teknologi PETRONAS,
Bandar Seri Iskandar,
31750 Tronoh,
Perak Darul Ridzuan.

susu masam

unread,
Jul 26, 2011, 8:40:13 PM7/26/11
to fydp-g...@googlegroups.com
pergh continous? ok kot haha..berbuih mulut aku
------------------------------------------------------------
Muhammad Faiz Bin Mohd Fudzaili
Bachelor (Hons) Chemical Engineering
Universiti Teknologi Petronas Jan 07

Email : (official) faiz.f...@gmail.com
           tommy.un...@gmail.com
website : http://firstforay.tumblr.com/

come and check out my photo gallery!:  http://www.flickr.com/photos/firstforay/

izzati amri

unread,
Jul 26, 2011, 8:41:09 PM7/26/11
to fydp-g...@googlegroups.com
that one better i think. sbb at first try nak buat everyone will get like u & fauzi, but somehow x logic sequence tu....

izzati amri

unread,
Jul 26, 2011, 8:42:56 PM7/26/11
to fydp-g...@googlegroups.com
i mean sequence like everyone will have 2 continuous parts, but then, only u n fauzi je match if nak buat continuous. if yg lain jd mcm lg pelik. huhuhu. plus, i need to consider everyone strength & well understanding in the respective part...

izzati amri

unread,
Jul 26, 2011, 11:05:35 PM7/26/11
to fydp-g...@googlegroups.com
Latest one.



Opening + Intro
Alternative Processes
Plant Design
Material Balance
Process Flowsheeting
Instrumentation & Control
Heat Integration
Safety & Loss Prevention
Waste Treatment
Process economics & cost estimation
Conclusion



azizi gigi

unread,
Jul 26, 2011, 11:08:48 PM7/26/11
to fydp-g...@googlegroups.com
sofea will explain about plant layout?

izzati amri

unread,
Jul 26, 2011, 11:11:12 PM7/26/11
to fydp-g...@googlegroups.com
jap, need to rearrange.

Sofia Keetasopon

unread,
Jul 26, 2011, 11:11:50 PM7/26/11
to fydp-g...@googlegroups.com
can u take that part azizi

since i dont even touch it at the beginning 

izzati amri

unread,
Jul 26, 2011, 11:12:21 PM7/26/11
to fydp-g...@googlegroups.com
Opening + Intro
Alternative Processes
Plant Design
Material Balance
Process Flowsheeting
Instrumentation & Control
Heat Integration
Plant Layout
Safety & Loss Prevention
Waste Treatment
Process economics & cost estimation
Conclusion



izzati amri

unread,
Jul 26, 2011, 11:12:55 PM7/26/11
to fydp-g...@googlegroups.com
ok, azizi.

ive made plant layout another new part, but only consist of one slide.
 

This is the latest

izzati amri

unread,
Jul 26, 2011, 11:18:37 PM7/26/11
to fydp-g...@googlegroups.com
Attached is the latest slide compiled. I upload it now in the event of anyone want to make a thorough study on their own respective parts.
PLANT DESIGN II (CAB 4023) GROUP 11_1114am.pptx

azizi gigi

unread,
Jul 27, 2011, 3:36:48 AM7/27/11
to fydp-g...@googlegroups.com
i only edited my part, HEN and plant layout
PLANT DESIGN II (CAB 4023) GROUP 11_330pm.pptx

Sofia Keetasopon

unread,
Jul 27, 2011, 6:28:06 AM7/27/11
to fydp-g...@googlegroups.com
edited on "Alternative Process" only 
PLANT DESIGN II (CAB 4023) GROUP 11_630pm.pptx

izzati amri

unread,
Jul 27, 2011, 6:35:22 AM7/27/11
to fydp-g...@googlegroups.com
waste treatment finalize IA.


On Wed, Jul 27, 2011 at 6:28 PM, Sofia Keetasopon <fufu...@gmail.com> wrote:
edited on "Alternative Process" only 



PLANT DESIGN II (CAB 4023) GROUP 11_631pm.pptx

izzati amri

unread,
Jul 27, 2011, 6:36:04 AM7/27/11
to fydp-g...@googlegroups.com
Just a kind reminder, please pay RM 5 to faiz for printing purpose. Thank you.

susu masam

unread,
Jul 27, 2011, 6:51:04 AM7/27/11
to fydp-g...@googlegroups.com


some changes in icon before primary reformer and betulkn naming heater/boiler/ heat exchanger as tercicir 1

ammonia pfd final.pdf
ammonia pnid final.pdf

susu masam

unread,
Jul 27, 2011, 6:51:47 AM7/27/11
to fydp-g...@googlegroups.com



some changes in icon before primary reformer and betulkn naming heater/boiler/ heat exchanger as tercicir 1


 
------------------------------------------------------------
icon report after hen 27.7.2011.xlsx

izzati amri

unread,
Jul 27, 2011, 7:17:50 AM7/27/11
to fydp-g...@googlegroups.com
update on wts.
PLANT DESIGN II (CAB 4023) GROUP 11_714pm.pptx

Fauzi @ Ponci

unread,
Jul 27, 2011, 7:34:59 AM7/27/11
to fydp-g...@googlegroups.com
update on site location..azizi can take a look..simple one..add also new map



--
Muhammad Fauzi bin Khamis,
Chemical Engineering,
Final year 2nd semester,

Universiti Teknologi PETRONAS,
Bandar Seri Iskandar
31750 Tronoh
Perak,Malaysia.

Phone:013-4719171
Email : lipandi...@yahoo.com
Email : lipa...@gmail.com
PLANT DESIGN II (CAB 4023) GROUP 11_7.27pm.pptx

Fauzi @ Ponci

unread,
Jul 27, 2011, 7:52:33 AM7/27/11
to fydp-g...@googlegroups.com
tambahan sikit kat site location
PLANT DESIGN II (CAB 4023) GROUP 11_7.48pm.pptx

izzati amri

unread,
Jul 27, 2011, 7:56:34 AM7/27/11
to fydp-g...@googlegroups.com
fauzi, please use times new roman :)

regarding font sizing, please follow the latest slides :)

On Wed, Jul 27, 2011 at 7:52 PM, Fauzi @ Ponci <lipa...@gmail.com> wrote:
tambahan sikit kat site location



--
Regards,
 
"Learn to pray not because you need something, but because you've ought to thanks Him about something"
 
~Nur Izzati Binti Boher @ Bujang Amri~
Chemical Engineering Programme,
Universiti Teknologi PETRONAS,

azizi gigi

unread,
Jul 27, 2011, 8:47:39 AM7/27/11
to fydp-g...@googlegroups.com
poji...saiz plant kite aku letak 800m x 500m...kalu kire balek land cost dlm table tu price & land area = 800mx500m = 400000m2. convert jadi feet 4,305,564.168ft2. jadi cost land feet kite rm40 juta ke? mane la tau examiner tu tanye.....

Sofia Keetasopon

unread,
Jul 27, 2011, 9:20:03 AM7/27/11
to fydp-g...@googlegroups.com
updated on alternative proces
PLANT DESIGN II (CAB 4023) GROUP 11_9.23pm.pptx

izzati amri

unread,
Jul 27, 2011, 9:29:46 AM7/27/11
to fydp-g...@googlegroups.com
PLANT DESIGN II (CAB 4023) GROUP 11_9.25pm.pptx

susu masam

unread,
Jul 27, 2011, 9:37:25 AM7/27/11
to fydp-g...@googlegroups.com
contol, mb flow sheeting
PLANT DESIGN II (CAB 4023) GROUP 11_9.30pm.pptx

Sofia Keetasopon

unread,
Jul 27, 2011, 9:55:35 AM7/27/11
to fydp-g...@googlegroups.com
Updated !!
PLANT DESIGN II (CAB 4023) GROUP 11_10.00pm.pptx

izzati amri

unread,
Jul 27, 2011, 9:56:56 AM7/27/11
to fydp-g...@googlegroups.com
what did u update?

On Wed, Jul 27, 2011 at 9:55 PM, Sofia Keetasopon <fufu...@gmail.com> wrote:
Updated !!

izzati amri

unread,
Jul 27, 2011, 9:57:18 AM7/27/11
to fydp-g...@googlegroups.com
i mean which part?

coz im now compiling evrything for final

Sofia Keetasopon

unread,
Jul 27, 2011, 9:59:13 AM7/27/11
to fydp-g...@googlegroups.com
HAZOP part 

izzati amri

unread,
Jul 27, 2011, 10:00:56 AM7/27/11
to fydp-g...@googlegroups.com
any update after this, please mention clearly in which part. tq

On Wed, Jul 27, 2011 at 9:59 PM, Sofia Keetasopon <fufu...@gmail.com> wrote:
HAZOP part 

izzati amri

unread,
Jul 27, 2011, 10:02:59 AM7/27/11
to fydp-g...@googlegroups.com
currently in progress of updating everything.

meeting postponed to 1045pm

tq

Sofia Keetasopon

unread,
Jul 27, 2011, 10:03:22 AM7/27/11
to fydp-g...@googlegroups.com
slide no. 62-66 (HAZOP Analysis table)

c n p

izzati amri

unread,
Jul 27, 2011, 10:04:00 AM7/27/11
to fydp-g...@googlegroups.com
as preparation, i need everyone to come with conclusion suggestion. tq~

izzati amri

unread,
Jul 27, 2011, 10:04:14 AM7/27/11
to fydp-g...@googlegroups.com
noted SK


On Wed, Jul 27, 2011 at 10:03 PM, Sofia Keetasopon <fufu...@gmail.com> wrote:
slide no. 62-66 (HAZOP Analysis table)

c n p



azizi gigi

unread,
Jul 27, 2011, 10:14:51 AM7/27/11
to fydp-g...@googlegroups.com
corrected on my part only....new one.sorry
PLANT DESIGN II (CAB 4023) GROUP 11_10.15pm.pptx

izzati amri

unread,
Jul 27, 2011, 10:15:57 AM7/27/11
to fydp-g...@googlegroups.com
GRRRRRRRRRRRRRRRR

hahaha

slide number bape?

On Wed, Jul 27, 2011 at 10:14 PM, azizi gigi <xixi...@gmail.com> wrote:
corrected on my part only....new one.sorry



azizi gigi

unread,
Jul 27, 2011, 10:16:10 AM7/27/11
to fydp-g...@googlegroups.com
HEN only..

izzati amri

unread,
Jul 27, 2011, 10:16:45 AM7/27/11
to fydp-g...@googlegroups.com
any changes made after this shall be made by referring to this.
PLANT DESIGN II (CAB 4023) GROUP 11_10.12pm.pptx

azizi gigi

unread,
Jul 27, 2011, 10:17:36 AM7/27/11
to fydp-g...@googlegroups.com
35,26, 41 
330.gif

izzati amri

unread,
Jul 27, 2011, 10:19:41 AM7/27/11
to fydp-g...@googlegroups.com
26?  my part?


On Wed, Jul 27, 2011 at 10:17 PM, azizi gigi <xixi...@gmail.com> wrote:
35,26, 41 



330.gif

azizi gigi

unread,
Jul 27, 2011, 10:21:16 AM7/27/11
to fydp-g...@googlegroups.com
eh 36.....sala2...

izzati amri

unread,
Jul 27, 2011, 10:21:39 AM7/27/11
to fydp-g...@googlegroups.com
This is updated one. Kindly please liaise to this slide for any changes. Azizi, ur part done :)
PLANT DESIGN II (CAB 4023) GROUP 11_10.20pm.pptx

izzati amri

unread,
Jul 27, 2011, 10:23:43 AM7/27/11
to fydp-g...@googlegroups.com
since the total no of slides is 79, i do hope everyone can think of how to present it in 30 mins time.

izzati amri

unread,
Jul 27, 2011, 10:30:29 AM7/27/11
to fydp-g...@googlegroups.com
Meeting postpone to 11 pm. it is highly advisable everyone keep on updated via email on meeting timing.

izzati amri

unread,
Jul 27, 2011, 10:52:14 AM7/27/11
to fydp-g...@googlegroups.com
did everyone ok with meeting on 11?

susu masam

unread,
Jul 27, 2011, 11:01:49 AM7/27/11
to fydp-g...@googlegroups.com

added a few more contorl strategy
PLANT DESIGN II (CAB 4023) GROUP 11_10.55pm.pptx

izzati amri

unread,
Jul 27, 2011, 11:02:35 AM7/27/11
to fydp-g...@googlegroups.com
ok. 1115 everyone please be there.

izzati amri

unread,
Jul 27, 2011, 11:08:33 AM7/27/11
to fydp-g...@googlegroups.com
the latest after include faiz's part.
PLANT DESIGN II (CAB 4023) GROUP 11_1114am.pptx

izzati amri

unread,
Jul 27, 2011, 1:43:37 PM7/27/11
to fydp-g...@googlegroups.com
This is the finalize one from our discussion just now. any changes shall be made based on this file. tq
PLANT DESIGN II (CAB 4023) GROUP 11_0102am.pptx

Sofia Keetasopon

unread,
Jul 27, 2011, 2:50:19 PM7/27/11
to fydp-g...@googlegroups.com
updated !! (Alternative process + hazop)
PLANT DESIGN II (CAB 4023) GROUP 11_0253am.pptx

izzati amri

unread,
Jul 27, 2011, 8:06:05 PM7/27/11
to fydp-g...@googlegroups.com
PLANT DESIGN II (CAB 4023) GROUP 11_0803am.pptx

izzati amri

unread,
Jul 27, 2011, 8:08:14 PM7/27/11
to fydp-g...@googlegroups.com
EDIT ON SPELLING.
PLANT DESIGN II (CAB 4023) GROUP 11_0803am.pptx

izzati amri

unread,
Jul 27, 2011, 9:16:24 PM7/27/11
to fydp-g...@googlegroups.com
meeting this morning is postpone to 10 am.

izzati amri

unread,
Jul 27, 2011, 9:40:46 PM7/27/11
to fydp-g...@googlegroups.com
PLANT DESIGN II (CAB 4023) GROUP 11_0937am.pptx

Fauzi @ Ponci

unread,
Jul 27, 2011, 9:54:29 PM7/27/11
to fydp-g...@googlegroups.com
major change in economic parts

miting lambat sket 10.30am..
PLANT DESIGN II (CAB 4023) GROUP 11_0950am.pptx

izzati amri

unread,
Jul 28, 2011, 12:23:29 AM7/28/11
to fydp-g...@googlegroups.com
any changes shall be made based on this


PLANT DESIGN II (CAB 4023) GROUP 11_1208pm.pptx

susu masam

unread,
Jul 28, 2011, 12:28:36 AM7/28/11
to fydp-g...@googlegroups.com
my part ubah ckit
PLANT DESIGN II (CAB 4023) GROUP 11_1222pm.pptx

Sofia Keetasopon

unread,
Jul 28, 2011, 12:48:48 AM7/28/11
to fydp-g...@googlegroups.com
edited on HAZOP
PLANT DESIGN II (CAB 4023) GROUP 11_1251pm.pptx

izzati amri

unread,
Jul 28, 2011, 12:50:12 AM7/28/11
to fydp-g...@googlegroups.com
does it based on faiz' part?

if not, please update based on latest part

On Thu, Jul 28, 2011 at 12:48 PM, Sofia Keetasopon <fufu...@gmail.com> wrote:
edited on HAZOP

Sofia Keetasopon

unread,
Jul 28, 2011, 12:50:48 AM7/28/11
to fydp-g...@googlegroups.com
yup

 based on latest one :)

izzati amri

unread,
Jul 28, 2011, 1:20:38 AM7/28/11
to fydp-g...@googlegroups.com
i wish no more updates. tq,

 thread close

may Allah eases us & soften their heart :)


On Thu, Jul 28, 2011 at 12:50 PM, Sofia Keetasopon <fufu...@gmail.com> wrote:
yup

 based on latest one :)



Fauzi @ Ponci

unread,
Jul 28, 2011, 3:54:42 AM7/28/11
to fydp-g...@googlegroups.com
tutup da la thread nih..haha

azizi gigi

unread,
Jul 28, 2011, 3:55:23 AM7/28/11
to fydp-g...@googlegroups.com
unsubscribe fydp group 11 hahahaha

Fauzi @ Ponci

unread,
Jul 28, 2011, 3:56:10 AM7/28/11
to fydp-g...@googlegroups.com
haha..melampau tuh..kasi siap report baru unsubscribe..haha

izzati amri

unread,
Jul 28, 2011, 4:49:37 AM7/28/11
to fydp-g...@googlegroups.com
after report br aku delete group ni ok :)

thanks all~

2011/7/28 Fauzi @ Ponci <lipa...@gmail.com>

haha..melampau tuh..kasi siap report baru unsubscribe..haha
Reply all
Reply to author
Forward
0 new messages