I do not see how this makes any sense. I do not see guardrails with other sidewalks across the city.
And it does sound ugly as sin. We are gradually taking a beautiful park area and with our speed-humps, no parking signs, and guardrails turning into a something resembling a prison.
I do not think I have ever seen a single sidewalk in the city with 2 metal guardrails on its sides.
WE NEED TO SOMEHOW STOP THIS INSANITY.
Who do we write? How do we reach Ed Lee, DPW Project Manager for the sidewalk work for Diamond Heights?
--
You received this message because you are subscribed to the Google Groups "Friends of Billy Goat Hill" group.
To unsubscribe from this group and stop receiving emails from it, send an email to
friends-of-billy-go...@googlegroups.com.
To post to this group, send email to
friends-of-bi...@googlegroups.com.
Visit this group at
http://groups.google.com/group/friends-of-billy-goat-hill.
For more options, visit https://groups.google.com/d/optout.
Thanks Lisa!
Can you tell me how to get in touch with DPW? Who do we as neighbors start flooding emails and calls into?
Perhaps we should also send emails into Scott Weiner’s office.
Seriously, this is ludicrous.
How much time do we have to stop this disaster?
Exactly Jean, we need to get in front of this ASAP!
Or start “mooing” as we walk along our street.


Hi David, Lisa, Lisa, Jeanne, and all neighbors and friends of Billy goat Hill,We need to see a visual of what DPW is proposing.
I completely agree that this guardrail design is ugly and ludicrous.Does anyone understand why the ADA requirements make sense?The guard rails are prime targets for graffiti. If we cannot stop them completely at least DPW will have to have them cover them with anti-graffiti coating.
Sent from my iPhone
David,
I agree with you…what a “ludicrous” idea.
Before we determine the best way to fight this idea, I think we need more details.
Precisely, where does DPW plan to build this double guard rail?
1. Along the eastern side of Beacon Street between the Ehrlich home and the northern end of the existing guard rail across from 445 Beacon Street?
· If so, would they tear down the existing wooden fence between the street and Billy Goat Hill Park?
· If so, let’s prepare to fight this at the appropriate levels.
2. From the southern end of the existing guard rail at the end of the wooden fence to the top of the existing guard rail across from 445 Beacon Street?
· If so, why even install a sidewalk that would be so steep that it would be unusable for disabled people in wheelchairs that ADA is trying to protect?
· If so, why not install appropriate steps along this steep sidewalk so that it would be unusable by people in wheelchairs. This would preclude the need for any guard rails.
Oops…..I just received Lisa’s email showing visuals of a guard rail that she has received from DPW.
Oh, my, when do we start the battle?
Fred
Fred LaCosse
415-643-9060
[fax] 415-643-9063
P.O. Box 31276
San Francisco, CA 94131
www.lacosse.net
From: friends-of-bi...@googlegroups.com [mailto:friends-of-bi...@googlegroups.com] On Behalf Of Lisa Ghotbi
Sent: Tuesday, October 06, 2015 12:53 PM
To: friends-of-bi...@googlegroups.com
Cc: JANE LIDZ <jane...@me.com>; Betsy Eddy <betsy...@gmail.com>; Fred LaCosse <Fred.L...@lacosse.net>; Alan Gevins <Al...@eeg.com>; Lita Sam-Vargas <Li...@eeg.com>
Subject: Re: [Friends of Billy Goat Hill] [Friends of Billy Goat Hill Park] Double Guard Rail will be installed along the street
OMG - this is terrible. I called Grace back and told her that we have a very concerned neighborhood, we would like drawings, photos, and we would like a conversation with Ed Lee (DPW) as soon as possible. I'm supposed to get a call back soon.
Lisa
On Tue, Oct 6, 2015 at 12:44 PM, Wayne, Lisa (REC) <lisa....@sfgov.org> wrote:
Here are the images I received from DPW.
Thank you. Lisa
Sent from my iPhone
Here are the images I received from DPW.