Unexpected Operation Plan Creation

30 views
Skip to first unread message

Bruce

unread,
Feb 11, 2013, 9:53:10 PM2/11/13
to freppl...@googlegroups.com
Attached is a zipped scenario where I do not understand how it is determining the number of operations to plan. I have a demand of three units for an Item. Based on the flows associated with the plan, the OpA1 operation is being planned six times when creating a constrained plan with the capacity checked. OpA1 is planned 4 times when contrained with the capacity unchecked. When running unconstrained, I also get 6 OpA1's with capacity checked and 4 OpA1'swith capacity unchecked. Based on the flow, I expected to get 4 OpA1 operations regardless of which option chosen.

Any assistance would greatly be appreciated.

I am running version 0.9.1 for the attached scenario.
scenario1.zip

Johan De Taeye

unread,
Feb 17, 2013, 12:28:48 PM2/17/13
to freppl...@googlegroups.com

This looks like a bug to me.

 

Johan

--
You received this message because you are subscribed to the Google Groups "frePPLe users" group.
To unsubscribe from this group and stop receiving emails from it, send an email to frepple-user...@googlegroups.com.
For more options, visit https://groups.google.com/groups/opt_out.
 
 

Bruce Holt

unread,
Feb 17, 2013, 1:03:21 PM2/17/13
to freppl...@googlegroups.com

Should this be reported as a bug? If so, how do I report it?

 

Thanks.

Johan De Taeye

unread,
Feb 17, 2013, 2:03:46 PM2/17/13
to freppl...@googlegroups.com, <frepple-users@googlegroups.com>

>>Should this be reported as a bug? If so, how do I report it?


Yes. Bugs are reported here:  http://sourceforge.net/p/frepple/bugs/

Ideally, it is reported as a fixture, compatible with 0.9.3 format.


Johan

Reply all
Reply to author
Forward
0 new messages