Groups
Conversations
All groups and messages
Send feedback to Google
Help
Training
Sign in
Groups
formica
Conversations
About
formica
Contact owners and managers
1–30 of 88
Mark all as read
Report group
0 selected
Robert Spanton
,
roboter
2
12/30/09
Formica v2 kits available for pre-order
Very cool! I thought and talked about your work a little the last days at the 26C3. And i actually
unread,
Formica v2 kits available for pre-order
Very cool! I thought and talked about your work a little the last days at the 26C3. And i actually
12/30/09
Jeff Gough
,
Auke Booij
2
9/21/09
PCB Modification for battery measurement
so when will there be a kit? On Mon, Sep 21, 2009 at 12:25 AM, Jeff Gough <jeff@
unread,
PCB Modification for battery measurement
so when will there be a kit? On Mon, Sep 21, 2009 at 12:25 AM, Jeff Gough <jeff@
9/21/09
Jeff Gough
,
Sam Phippen
2
9/20/09
hmm, does this work?
it appears to have worked 2009/9/20 Jeff Gough <je...@warrantyvoidifremoved.com>: > > --
unread,
hmm, does this work?
it appears to have worked 2009/9/20 Jeff Gough <je...@warrantyvoidifremoved.com>: > > --
9/20/09
roboter
, …
Auke Booij
3
5/28/09
Formica Kits
Hi Rob and others somehow connected to the formica project, I, for one, would like to help on the
unread,
Formica Kits
Hi Rob and others somehow connected to the formica project, I, for one, would like to help on the
5/28/09
Auke Booij
3/24/09
Software
Hey, Are there any ideas on how the software will work, yet? I think, ideally, all code is written in
unread,
Software
Hey, Are there any ideas on how the software will work, yet? I think, ideally, all code is written in
3/24/09
Robert Spanton
, …
Jeffrey Gough
8
5/30/08
[Fwd: RE: Quote Request: Formica Robots]
In a mobile phone they're brought up to a rough cuboid shape with the rubber boot. The motor/boot
unread,
[Fwd: RE: Quote Request: Formica Robots]
In a mobile phone they're brought up to a rough cuboid shape with the rubber boot. The motor/boot
5/30/08
Robert Spanton
5/24/08
LEF
Hi Guys, I emailed LEF (the PCB assembly company we used for the Gumsense and Student Robotics) to
unread,
LEF
Hi Guys, I emailed LEF (the PCB assembly company we used for the Gumsense and Student Robotics) to
5/24/08
Alexis Johnson
5/24/08
Re: Formica (Abstract revision deadline Mo 26.05.)
>> - Let me know whether anyone from the formicateam is comitted >> to attend the
unread,
Re: Formica (Abstract revision deadline Mo 26.05.)
>> - Let me know whether anyone from the formicateam is comitted >> to attend the
5/24/08
Jeffrey Gough
5/22/08
Re: Friday's Presentation
Sorry, yes 16:00 is fine for us (Group D.) Cheers, Jeff r...@ecs.soton.ac.uk wrote: > All: >
unread,
Re: Friday's Presentation
Sorry, yes 16:00 is fine for us (Group D.) Cheers, Jeff r...@ecs.soton.ac.uk wrote: > All: >
5/22/08
Alexis Johnson
5/18/08
Report writting
I have been tasked with the expanding the background information section of the report, i will be
unread,
Report writting
I have been tasked with the expanding the background information section of the report, i will be
5/18/08
Alexis Johnson
5/18/08
Motor taxes
8.72pounds of taxes between the US and canada 31.3pounds for shipping from canada to here we managed
unread,
Motor taxes
8.72pounds of taxes between the US and canada 31.3pounds for shipping from canada to here we managed
5/18/08
sun joanna
5/18/08
batteries
Battery receipt Jo
unread,
batteries
Battery receipt Jo
5/18/08
Alexis Johnson
5/15/08
Doing stuff
Hi everyone, just trying to figure out what i can be doing with out physically being in your house
unread,
Doing stuff
Hi everyone, just trying to figure out what i can be doing with out physically being in your house
5/15/08
Jeff Gough
5/14/08
Formica swarm robot videos
Hi all, I've uploaded some videos to youtube. The robots running an "infection"
unread,
Formica swarm robot videos
Hi all, I've uploaded some videos to youtube. The robots running an "infection"
5/14/08
Jeffrey Gough
, …
Robert Spanton
4
5/12/08
Presentation
Jeffrey Gough wrote: > This makes use of the already working IR ping. It requires development >
unread,
Presentation
Jeffrey Gough wrote: > This makes use of the already working IR ping. It requires development >
5/12/08
Jeffrey Gough
5/9/08
Assembly festival
Hi guys, We're viewing a house tomorrow morning, so the assembly fest won't start until
unread,
Assembly festival
Hi guys, We're viewing a house tomorrow morning, so the assembly fest won't start until
5/9/08
Alexis Johnson
,
Jeffrey Gough
2
5/9/08
Tools for formica production
Good point, we have ~0 helping hands. Alexis Johnson wrote: > > Im planning on borrowing 2
unread,
Tools for formica production
Good point, we have ~0 helping hands. Alexis Johnson wrote: > > Im planning on borrowing 2
5/9/08
Jeff Gough
, …
Jeffrey Gough
4
5/8/08
Farnell order
They are indeed compatible. There are already personal items on the order - flux pen and solderpaste
unread,
Farnell order
They are indeed compatible. There are already personal items on the order - flux pen and solderpaste
5/8/08
Alexis Johnson
5/7/08
Fwd: Farnell Confirmation 06/05/2008 15:50:45 / 80161863
Just so the mailing list has a copy of everything here's the farnell confirmation. Can you send
unread,
Fwd: Farnell Confirmation 06/05/2008 15:50:45 / 80161863
Just so the mailing list has a copy of everything here's the farnell confirmation. Can you send
5/7/08
Jeffrey Gough
, …
sun joanna
5
5/7/08
Formica assembly festival
sounds good ;) sun joanna wrote: > Since I not providing any reflow stations... maybe i can bring
unread,
Formica assembly festival
sounds good ;) sun joanna wrote: > Since I not providing any reflow stations... maybe i can bring
5/7/08
Jeff Gough
5/7/08
[Fwd: PCB TRAIN ORDER CONFIRMATION - SOP 25448]
Total £348.09 -------- Original Message -------- Subject: PCB TRAIN ORDER CONFIRMATION - SOP 25448
unread,
[Fwd: PCB TRAIN ORDER CONFIRMATION - SOP 25448]
Total £348.09 -------- Original Message -------- Subject: PCB TRAIN ORDER CONFIRMATION - SOP 25448
5/7/08
Jeff Gough
,
Klaus-Peter Zauner
3
5/6/08
Formica PCBs
Superb, thanks Klaus! We're yet to sort out the billing stuff- the various expenses are going on
unread,
Formica PCBs
Superb, thanks Klaus! We're yet to sort out the billing stuff- the various expenses are going on
5/6/08
Robert Spanton
, …
Jeffrey Gough
16
5/6/08
Farnell Order
Hehe, no worries. Glad you don't have to munge anything back in. IRP extension! sun joanna wrote:
unread,
Farnell Order
Hehe, no worries. Glad you don't have to munge anything back in. IRP extension! sun joanna wrote:
5/6/08
Jeff Gough
, …
Stephen English
3
5/6/08
25 Robots
Sorted. On Tue, May 6, 2008 at 12:56 PM, Robert Spanton <rspa...@zepler.net> wrote: 25 is fine
unread,
25 Robots
Sorted. On Tue, May 6, 2008 at 12:56 PM, Robert Spanton <rspa...@zepler.net> wrote: 25 is fine
5/6/08
Stephen English
5/6/08
Fwd: Quotation - SQ26216
Spirit circuits - more expensive that PCB Train ---------- Forwarded message ---------- From: Holly
unread,
Fwd: Quotation - SQ26216
Spirit circuits - more expensive that PCB Train ---------- Forwarded message ---------- From: Holly
5/6/08
Robert Spanton
,
Alexis Johnson
4
5/3/08
IR working on robot
Alexis Johnson wrote: > Am i wrong in thinking this will cause hell for the Sun tracking system?
unread,
IR working on robot
Alexis Johnson wrote: > Am i wrong in thinking this will cause hell for the Sun tracking system?
5/3/08
Jeff Gough
,
Alexis Johnson
2
4/24/08
pcbs are here
neat il be over in an hour. On Thu, 24 Apr 2008 17:03:25 +0100, Jeff Gough <jdg...@zepler.net>
unread,
pcbs are here
neat il be over in an hour. On Thu, 24 Apr 2008 17:03:25 +0100, Jeff Gough <jdg...@zepler.net>
4/24/08
Jeffrey Gough
4/23/08
First PCB error
Yep, already spotted a mistake. The led in the photoreflective food sensor is missing its current
unread,
First PCB error
Yep, already spotted a mistake. The led in the photoreflective food sensor is missing its current
4/23/08
Robert Spanton
4/22/08
Another farnell order
Just ordered these things: What you ordered: Part Num. Quantity . Availability Line Price Description
unread,
Another farnell order
Just ordered these things: What you ordered: Part Num. Quantity . Availability Line Price Description
4/22/08
Jeff Gough
4/22/08
[Fwd: PCB TRAIN ORDER CONFIRMATION - SOP 25080]
PCB shipped. Phoned to pay and it's all on track to dispatch tomorrow night. £94 all in. I really
unread,
[Fwd: PCB TRAIN ORDER CONFIRMATION - SOP 25080]
PCB shipped. Phoned to pay and it's all on track to dispatch tomorrow night. £94 all in. I really
4/22/08