FDP meeting

1 view
Skip to first unread message

Kumar Nathan

unread,
Aug 25, 2012, 11:14:38 PM8/25/12
to fdp-g...@googlegroups.com
we will be having meeting tomorrow(monday) at 2p.m. in v5 meeting room. c u there...

--
Regards,
~Kumar.n
~Universiti Teknologi PETRONAS

Timur Talatovich

unread,
Aug 25, 2012, 11:16:09 PM8/25/12
to fdp-g...@googlegroups.com
ok noted

--
You received this message because you are subscribed to the Google Groups "FDP Group 7" group.
To unsubscribe from this group, send email to fdp-group-7...@googlegroups.com.
For more options, visit https://groups.google.com/groups/opt_out.
 
 



--
Timur Tashkenbaev
PE12260
Undergraduate Student
Universiti Technologi PETRONAS
tel.: +6010-3773242


WanRu Teoh

unread,
Aug 26, 2012, 3:26:57 AM8/26/12
to fdp-g...@googlegroups.com
ok see u all!
wat's the agenda for tmr?

WanRu Teoh

unread,
Aug 26, 2012, 10:49:07 PM8/26/12
to fdp-g...@googlegroups.com
Dear all,
Sorry to say that I'm occupied with another task from 12.30pm later.
Might not be able to attend the meeting.

Attached is my work (except EOR to be completed by to9).
If u found anything need to discuss with me, call me at 017-5206798.
I will try to settle my task there and attend the meeting...

Sorry again.

Kumar, when is the due date for us to submit all for u to compile?

Chapt 2.doc
Res_Slide.pptx

PrewiN .

unread,
Aug 27, 2012, 12:12:43 AM8/27/12
to fdp-g...@googlegroups.com
Kumar, can you suggest a different time so that all of us can sit together and discuss. Or you just wanna carry on first?

--
You received this message because you are subscribed to the Google Groups "FDP Group 7" group.
To unsubscribe from this group, send email to fdp-group-7...@googlegroups.com.
For more options, visit https://groups.google.com/groups/opt_out.
 
 



--

PREVEEN KUMAR RAJAN

7658, Jalan Semarak Api,
Taman Seri Kelemak,
78000 Alor Gajah,
Melaka Negeri Bersejarah,

Malaysia

 

Tel. 0162666660 / 0163130355


Kumar Nathan

unread,
Aug 27, 2012, 1:34:43 AM8/27/12
to fdp-g...@googlegroups.com
ok guyz... since most of u cant make for the meeting we will postpone the meeting to thursday afternoon at 2.30 p.m.... and please send your part by tomorrow(12 midnight)... whoever fails to submit their part by tomorrow nite gonna belanja us Chicken Deluxe Burger from McD.... We will be start doing our slides this thursday since we will be busy with our final papers next week... c u this thursday..... ;)

Wan Muhamad Faris

unread,
Aug 27, 2012, 3:02:06 AM8/27/12
to fdp-g...@googlegroups.com
hi guyz..i need ur help to figure out this word from block 2..

Operation and     maintenanc engineering     advise   that   th estimated     operating expenditure   will   be   4%   of  cumulative   CAPEX   per   annum   (fixed   OPEX),   plus US$3.50/bbl (variable OPEX). It is assumed that OPEX will only be incurred once production  commences.  The  cost  of  design  and  managing  the  construction  of  the project is included in the capital costs.


I am not very sure about the OPEX..I mean how to get the value of fixed OPEX..please help me guyz..

thx a lot..=)

WanRu Teoh

unread,
Aug 27, 2012, 6:01:55 AM8/27/12
to fdp-g...@googlegroups.com
below is my opinion, u see if reasonable?

O
peration and     maintenanc engineering     advise   that   th estimated     operating expenditure   will   be   4%   of  cumulative   CAPEX   per   annum   (fixed   OPEX),   plus US$3.50/bbl (variable OPEX).
cumulative CAPEX = Total CAPEX (sum of few years CAPEX at the beginning) = C
fixed yearly OPEX = 4% of
C = A
variable OPEX =
US$3.50/bbl (depend on Np of that year) = B
Total OPEX = A+B




--

WanRu Teoh

unread,
Aug 27, 2012, 6:02:23 AM8/27/12
to fdp-g...@googlegroups.com
On Mon, Aug 27, 2012 at 6:01 PM, WanRu Teoh <wanr...@gmail.com> wrote:
below is my opinion, u see if reasonable?

O
peration and     maintenanc engineering     advise   that   th estimated     operating expenditure   will   be   4%   of  cumulative   CAPEX   per   annum   (fixed   OPEX),   plus US$3.50/bbl (variable OPEX).
cumulative CAPEX = Total CAPEX (sum of few years CAPEX at the beginning) = C
fixed yearly OPEX = 4% of
C = A
variable OPEX =
US$3.50/bbl (depend on Np of that year) = B
Total OPEX (for 1 yr) = A+B

Wan Muhamad Faris

unread,
Aug 27, 2012, 10:21:10 AM8/27/12
to fdp-g...@googlegroups.com
very good..nice idea..
clearer for me..tq2..=)


WanRu Teoh

unread,
Aug 29, 2012, 6:57:41 AM8/29/12
to fdp-g...@googlegroups.com
Dear all, tmr i have appointment at 4pm. so will stay from 2.30-4.00pm oni...hopefully meeting tmr wont be too long xP

On Mon, Aug 27, 2012 at 10:21 PM, Wan Muhamad Faris <faris...@gmail.com> wrote:
very good..nice idea..
clearer for me..tq2..=)


WanRu Teoh

unread,
Aug 29, 2012, 11:21:17 PM8/29/12
to fdp-g...@googlegroups.com
How bout we hav meeting ltr in Pocket C lecture hall? then we all can see the report hugely on screen.
cos i couldn't bring my laptop today...got problem since Mon nite...

PrewiN .

unread,
Aug 29, 2012, 11:22:22 PM8/29/12
to fdp-g...@googlegroups.com
Anyone please bring their laptop if possible coz to go pocket c we must wear proper attire. :)

On Thu, Aug 30, 2012 at 11:21 AM, WanRu Teoh <wanr...@gmail.com> wrote:
How bout we hav meeting ltr in Pocket C lecture hall? then we all can see the report hugely on screen.
cos i couldn't bring my laptop today...got problem since Mon nite...

--
You received this message because you are subscribed to the Google Groups "FDP Group 7" group.
To unsubscribe from this group, send email to fdp-group-7...@googlegroups.com.
For more options, visit https://groups.google.com/groups/opt_out.
 
 

Wan Muhamad Faris

unread,
Aug 30, 2012, 4:45:35 AM8/30/12
to fdp-g...@googlegroups.com

Hi everyone. I just realized that all the stuffs that i've done is wrong..
for the economic analysis, i need to hv the value of capex..so i took the value of capex from saha which is only included for the facilities part.
so, i really need the capex from completion (preveen), ptech (azri), and drilling (fuad).hopefully u can gv me the value asap to help me start again my economic analysis..

PrewiN .

unread,
Aug 31, 2012, 10:18:08 AM8/31/12
to fdp-g...@googlegroups.com
Pokcek: The price for the tubing Injection and Production: USD 380000
Wellhead(20 wells): USD200000

Wan Muhamad Faris

unread,
Aug 31, 2012, 10:26:29 AM8/31/12
to fdp-g...@googlegroups.com
meaning that the capex is summation of 380k + 200k..
is it like that prewin?


PrewiN .

unread,
Aug 31, 2012, 2:59:51 PM8/31/12
to fdp-g...@googlegroups.com
yes2..

On Fri, Aug 31, 2012 at 10:26 PM, Wan Muhamad Faris <faris...@gmail.com> wrote:
meaning that the capex is summation of 380k + 200k..
is it like that prewin?

--
You received this message because you are subscribed to the Google Groups "FDP Group 7" group.
To unsubscribe from this group, send email to fdp-group-7...@googlegroups.com.
For more options, visit https://groups.google.com/groups/opt_out.
 
 

PrewiN .

unread,
Sep 5, 2012, 10:08:01 AM9/5/12
to fdp-g...@googlegroups.com
PokCek.. The new capex:

Injection: Tubing: 600k
Wellhead: 180k

Production: Tubing: 900k
Wellhead: 220k

Wan Muhamad Faris

unread,
Sep 5, 2012, 10:11:21 AM9/5/12
to fdp-g...@googlegroups.com
sorry prewin..i dont know actually how to calculate based on which one for water injection and which one is natural dpletion cost..
please help me figure out the summation cost for tubing and wellhead for each natural dpletion and also water injection
=)


PrewiN .

unread,
Sep 5, 2012, 10:13:15 AM9/5/12
to fdp-g...@googlegroups.com
Bro, what i mean by production is natural depletion and injection
means water injection. get it?

Wan Muhamad Faris

unread,
Sep 5, 2012, 10:14:57 AM9/5/12
to fdp-g...@googlegroups.com
ok2..got it..baru phm..tq cha.=)



PrewiN .

unread,
Sep 5, 2012, 10:15:12 AM9/5/12
to fdp-g...@googlegroups.com
Niceee:)
Reply all
Reply to author
Forward
0 new messages