Just now, 4 of us from RE having discussion in Mr Ali's room.
Later 2.30pm we will have own discussion again regarding our direction.
Basically, the conclusion is we need to compare 2 scenario b/w Natural Depletion vs. Water Injection (both assume start from beginning)
but practically, we cnt do so due to drilling schedule...
so i suggest our group propose 3 ways, then we'll have 3 different prod forecast, 3 diff economy analysis for only RMP (so eco ana divide to RMP and PTech)
And also, i found out the injection rate maximum can reach 4000 stb/d only (more will fracture the reservoir), with VRR=1.44, i guess 6 injector only might not be sufficient.
But will confirm this after production profile and VRR calculated... so just use back the updated well location plan.
Or is it technically feasible to hav 4 tubing in 1 wellbore? (drill 1 well, inject at 4 layers each 4000 stb/d)
Privee said that, Ms Rajes will confirm if our presentation will be delayed by tmr (Friday)
So I'm wondering if we should have meeting today OR tomorrow night (i might not inside tmr day time)?
Today: Discuss findings from earlier discussion with SV and my discussion with RE group ltr.
Tomorrow: After confirm presentation schedule, our task distribution maybe can change abit...
So what do u guys think?