FDP Report + Slides

18 views
Skip to first unread message

WanRu Teoh

unread,
Aug 27, 2012, 11:38:04 AM8/27/12
to fdp-g...@googlegroups.com
Dear all, this is complete one from my part.
Kindly check and comment. :)

For cost analysis, need some info (revenue vs. expenses) for both natural drive and water injection scheme to compare. At the end, show water injection could generate more profit.

reservoir surveillance program need cross check with completion and PTech part.

Potential Problems actually is whose part? i think just copy paste from sample will do...

p/s: my laptop got problem just now, asking dell technician to come tmr. now using fren's laptop. so might not able to on9 so frequent in this week. anything pls msg or call me. thanks :)
Chapt 2.doc
Res_Slide.pptx

wan_saha

unread,
Sep 2, 2012, 12:52:38 PM9/2/12
to fdp-g...@googlegroups.com

please have a look. this is how our facilities of the field engineered. 

but, there are some of issues in my report because i did not fully updated it yet. 

tq. 



facilities slide.pptx
facilities engineering.docx

Fuad Othman

unread,
Sep 4, 2012, 12:00:06 PM9/4/12
to fdp-g...@googlegroups.com



--
You received this message because you are subscribed to the Google Groups "FDP Group 7" group.
To unsubscribe from this group, send email to fdp-group-7...@googlegroups.com.
For more options, visit https://groups.google.com/groups/opt_out.
 
 



--
Fuad Othman
Petroleum Engineering
Final Year Final Semester
Universiti Teknologi PETRONAS

DRILLING ENGINEERING(SEMI FINAL).doc

PrewiN .

unread,
Sep 4, 2012, 11:13:44 PM9/4/12
to fdp-g...@googlegroups.com
Guys i have a question..do we need to use dual string for injector?
Coz i tink its redundant since we can inject sufficient rate with only
1 string right?
PREVEEN KUMAR RAJAN

7658, Jalan Semarak Api,
Taman Seri Kelemak,
78000 Alor Gajah,
Melaka Negeri Bersejarah,

Malaysia



Tel. 0162666660 / 0163130355

PrewiN .

unread,
Sep 4, 2012, 11:41:03 PM9/4/12
to fdp-g...@googlegroups.com
Completion Report.docx

Wan Muhamad Faris

unread,
Sep 5, 2012, 12:37:54 AM9/5/12
to fdp-g...@googlegroups.com
for the capex..
the total capex is 325.71 mil
after made the economic analysis, we got about 400+ mil cumulative net cash flow..
some said its quite big for this small field.
for the capex, did we calculate the rental for the rig..maybe 200k per day or smething else..
im not sure about that..just asking..
but the value of capex that i received is 325.71 mil..=)


Timur Talatovich

unread,
Sep 5, 2012, 12:49:39 AM9/5/12
to fdp-g...@googlegroups.com
This is my part for presentation....




--
You received this message because you are subscribed to the Google Groups "FDP Group 7" group.
To unsubscribe from this group, send email to fdp-group-7...@googlegroups.com.
For more options, visit https://groups.google.com/groups/opt_out.
 
 



--
Timur Tashkenbaev
PE12260
Undergraduate Student
Universiti Technologi PETRONAS
tel.: +6010-3773242


abandonment.pptx

WanRu Teoh

unread,
Sep 5, 2012, 10:11:05 AM9/5/12
to fdp-g...@googlegroups.com
Finalized Reservoir Slides

Later i will upload reservoir report after some changes done. Preveen, u can extract introduction part from there, to see wat u wan to talk about in introduction part.
I edit some part in problem statement there...

Since u're talking for completion oso, i will take my own reservoir description intro part.

WanRu Teoh

unread,
Sep 5, 2012, 10:12:46 AM9/5/12
to fdp-g...@googlegroups.com
updated on 5th Sep
Wanru_Reservoir Slides.pptx

Timur Talatovich

unread,
Sep 5, 2012, 12:19:04 PM9/5/12
to fdp-g...@googlegroups.com


On Wed, Sep 5, 2012 at 10:12 PM, WanRu Teoh <wanr...@gmail.com> wrote:
updated on 5th Sep

--
You received this message because you are subscribed to the Google Groups "FDP Group 7" group.
To unsubscribe from this group, send email to fdp-group-7...@googlegroups.com.
For more options, visit https://groups.google.com/groups/opt_out.
 
 
THE ABANDONMENT PLAN.docx

Timur Talatovich

unread,
Sep 5, 2012, 12:23:04 PM9/5/12
to fdp-g...@googlegroups.com
This one is latest updated slide . Thq
abandonment.pptx

WanRu Teoh

unread,
Sep 5, 2012, 12:59:31 PM9/5/12
to fdp-g...@googlegroups.com
Reservoir report, finalized one (shud be) xP

Kumar, mayb introduction part u can refer for phase 3 report

Preveen, u can get introduction script from tis report, and figures for slides as well.

WanRu Teoh

unread,
Sep 5, 2012, 1:00:11 PM9/5/12
to fdp-g...@googlegroups.com
Reservoir Report.Rev1.doc

Wan Muhamad Faris

unread,
Sep 5, 2012, 1:21:59 PM9/5/12
to fdp-g...@googlegroups.com

akhirnya..
done with the slide..very challenging night..sory kumar for being late about 1 hour and 21 minutes for the slide submission.
=)

Wan Muhamad Faris

unread,
Sep 5, 2012, 1:22:32 PM9/5/12
to fdp-g...@googlegroups.com
eh..forgot nk attached..sori2


econ.pptx

wan_saha

unread,
Sep 5, 2012, 1:54:49 PM9/5/12
to fdp-g...@googlegroups.com

Facilities Engineering Revised

facilities slide rev 1.pptx
facilities engineering rev 1.docx

Fuad Othman

unread,
Sep 5, 2012, 2:26:36 PM9/5/12
to fdp-g...@googlegroups.com


On Thu, Sep 6, 2012 at 1:54 AM, wan_saha <wayne...@gmail.com> wrote:

Facilities Engineering Revised


--
You received this message because you are subscribed to the Google Groups "FDP Group 7" group.
To unsubscribe from this group, send email to fdp-group-7...@googlegroups.com.
For more options, visit https://groups.google.com/groups/opt_out.
 
 



--
DRILLING fuad.pptx

Kumar Nathan

unread,
Sep 5, 2012, 3:26:56 PM9/5/12
to fdp-g...@googlegroups.com
guyz,
i have attached the compiled report... i havent receive the report from azri and pcek, please send me as soon as possible guyz... others, plz check ur part and do let me know if got any mistakes....
Regards,
~Kumar.n
~Universiti Teknologi PETRONAS

FDP_report_Block II&III_rough compilation.docx

PrewiN .

unread,
Sep 5, 2012, 4:02:41 PM9/5/12
to fdp-g...@googlegroups.com
slides. Hopefully azri can send his part since i need to extract some
info from his.
Completion slides.pptx

Wan Muhamad Faris

unread,
Sep 5, 2012, 7:30:49 PM9/5/12
to fdp-g...@googlegroups.com
still working on it kumar..
sorry2..report baru start leh wat after finishing the excel sheet..
=)


PrewiN .

unread,
Sep 6, 2012, 12:07:12 AM9/6/12
to fdp-g...@googlegroups.com
Group 1 entered at 8.30 and came out at 11.30. Good news guys :)

Fuad Othman

unread,
Sep 6, 2012, 12:08:12 AM9/6/12
to fdp-g...@googlegroups.com
POWER!!!!  Reservoir and Drilling kene tibai...

Timur Talatovich

unread,
Sep 6, 2012, 12:24:26 AM9/6/12
to fdp-g...@googlegroups.com
dammnnnnnnnnnnn

PrewiN .

unread,
Sep 6, 2012, 12:35:45 AM9/6/12
to fdp-g...@googlegroups.com
Guys, im having something to do today until 3, hope we can have our
meeting at 3.30. 1 hour presentation and discussion we can be back at
5 p.m. :)

PrewiN .

unread,
Sep 6, 2012, 1:25:47 AM9/6/12
to fdp-g...@googlegroups.com
Intro.pptx

azri hariz

unread,
Sep 6, 2012, 3:18:37 AM9/6/12
to fdp-g...@googlegroups.com
PTech.pptx
Reply all
Reply to author
Forward
0 new messages