Re: Requesting for permission for Renovation Interior work at A210

0 views
Skip to first unread message

FM Evergreens

<fm.evergreen2018@gmail.com>
unread,
May 31, 2026, 3:43:42 AMMay 31
to Anubhab Tripathy, Helpdesk Evergreens, TECHNICAL MANAGER, evergreens_mc
Dear Residents,

Thanks for the information on renovation and painting work.

 

Kindly inform your painter and civil vendors  of the following instructions.

 

1. The vendor's designated working hours are from 10:00 AM to 05:00 PM.

2. Please refrain from disposing of painting waste and paint water in the Wash Basin or Commode.

3. Dispose of all paint waste materials outside the premises.

4. Kindly avoid dumping paint materials and waste items in the lobby area.

5. Please refrain from depositing debris in the common area.

6. Utilize the service lift exclusively for shifting materials.

7. Vendors are strictly prohibited from using passenger lifts.

8. Vendors are not permitted to operate on Sundays.

9. Major drilling operations are permitted between 10:00 AM and 04:00 PM.

10. It is prohibited to conduct drilling activities on beams.

11. Sound work will allow only 15days.

Thanks & Regards,
Anil Dsouza
Facility Manager


On Sun, May 31, 2026 at 12:48 PM Anubhab Tripathy <anubhab_...@yahoo.com> wrote:
Dear Team,
I am planning to do Renovation Interior Work in A210 from June 3rd, 2026 for 1 month.

Kindly guide me with the rules and regulations and documentation required to get the permissions. Also, guide me about the material movement (mainly plywood and granite stone for kitchen) upto the 2nd floor. 

Thanks in advance,
Anubhab Tripathy,
Owner A210,

Anubhab Tripathy

<anubhab_tripathy@yahoo.com>
unread,
May 31, 2026, 7:51:27 AMMay 31
to FM Evergreens, Helpdesk Evergreens, TECHNICAL MANAGER, evergreens_mc
Dear Team,
Thank you for the clear instructions. I shall pass these on to the team. 

Kindly let me know, if you need any other information from my end.

Thanks and regards,
Anubhab

Anubhab Tripathy

<anubhab_tripathy@yahoo.com>
unread,
Jul 2, 2026, 11:49:38 PM (2 days ago) Jul 2
to FM Evergreens, Helpdesk Evergreens, TECHNICAL MANAGER, evergreens_mc
Dear Team,
As per our discussion over the call, requesting to extend the permission for 2 more days to complete the painting work at the Flat A210


Thank you for the consideration.

Anubhab Tripathy
Owner A210
Reply all
Reply to author
Forward
0 new messages