PROGRESS REPORT

3 views
Skip to first unread message

nadia hartini suhaimi

unread,
Mar 3, 2012, 2:02:48 AM3/3/12
to etp_jan...@googlegroups.com
salam/hi to all ETP mate...

Here are the listing that need to be done for our progress report

1) Introduction (30m)
  • project definition and problem statement
  • identification of potential solution
  • literature review
  • design concept
  • justification in choosing design
2) Project Planning (20m)
  • task listings and distribution
  • logic of sequence task
  • feasibility of plan
3) Methodology (20m)
  • identification suitable tools/software
4) Data gathering and analysis (20m)
  • application of fundamental engineering knowledge in solving/analysing design problem
  • validity&suitability data
5) Economical/business consideraton (5m)
  • capital cost
  • operational cost
  • alternative materials
6) Conclusion (5m)
  • summary progree and findings
  • next plan of action
* Dear friends, I give chance for all of you to do any part that you think you capable for it.Please reply in this email for avoiding any redundancy.
* Due date for each part on monday (5/3/2012)
Thank you

--



wahai jiwa yang tenang,kembalilah kepada Rabbmu dengan hati yang puas lagi diredhaiNya.(A-Fajr:27-28)

mohd khairul

unread,
Mar 3, 2012, 2:41:27 AM3/3/12
to etp_jan...@googlegroups.com
i think i'm going to take 3) Methodology 

Vanneth Ny

unread,
Mar 3, 2012, 2:46:12 AM3/3/12
to etp_jan...@googlegroups.com
Dear all, 

can I choose the 1) Introduction. Because I am familiar with that part.
By the way, what is the time for the meeting tonight?
--
Ny Vanneth
Civil Engineering Student
Universiti Teknologi PETRONAS
Bandar Seri Iskandar , 31750 Tronoh
Perak Darul Ridzuan, Malaysia
Tel: 0163447670

nadia hartini suhaimi

unread,
Mar 3, 2012, 2:58:07 AM3/3/12
to etp_jan...@googlegroups.com
ok...noted

1) khairul - methodology
2) vanneth - introduction

Zulhilmi Hashim

unread,
Mar 3, 2012, 3:04:07 PM3/3/12
to etp_jan...@googlegroups.com
current test

On Sun, Mar 4, 2012 at 4:00 AM, Zulhilmi Hashim <gmie...@gmail.com> wrote:
hai to all..
i have done the test for seebeck..my hp was charged..i have recorded the experiment but i cant upload because the size is too big..i attch some picture of the experiment for u all..gud nite~~ 

2012/3/3 nadia hartini suhaimi <hartin...@gmail.com>
32B.gif
current test.png

Zulhilmi Hashim

unread,
Mar 3, 2012, 3:05:28 PM3/3/12
to etp_jan...@googlegroups.com
voltage test
32B.gif
voltage test.png

mohd khairul

unread,
Mar 3, 2012, 9:24:46 PM3/3/12
to etp_jan...@googlegroups.com
is it charging? i can't see clearly from the picture
32B.gif

Zulhilmi Hashim

unread,
Mar 3, 2012, 11:39:49 PM3/3/12
to etp_jan...@googlegroups.com
yes its charging..
32B.gif

nadia hartini suhaimi

unread,
Mar 3, 2012, 11:41:10 PM3/3/12
to etp_jan...@googlegroups.com


how about  a device?.already found or not?..

Zulhilmi Hashim

unread,
Mar 3, 2012, 11:44:42 PM3/3/12
to etp_jan...@googlegroups.com
not yet~~

mohd khairul

unread,
Mar 3, 2012, 11:44:50 PM3/3/12
to etp_jan...@googlegroups.com
not yet

Zulkhairi Jaafar

unread,
Mar 4, 2012, 1:25:34 PM3/4/12
to etp_jan...@googlegroups.com
Wow, nice job bro!.. Anyway, gud lark for all members who have a test tomorrow!

2012/3/3 mohd khairul <mkha...@gmail.com>



--

Yours sincerely,



AHMAD ZULKHAIRI BIN JAAFAR

Head of Social and Humanities Department

Convofair 2011

Universiti Teknologi PETRONAS

Tel     : (013) 967 6898

email : snh.con...@gmail.com

Zulkhairi Jaafar

unread,
Mar 5, 2012, 2:02:57 AM3/5/12
to etp_jan...@googlegroups.com
This is my part... Please sent to this thread okay! ASAP
Design Concept.docx
Results & Experiment of Generator.docx

mohd khairul

unread,
Mar 5, 2012, 3:39:03 AM3/5/12
to etp_jan...@googlegroups.com
this is my part... thank you. check attachment.
Methodology -khairul.docx
Data Analysis (circuit) - khairul.docx

nadia hartini suhaimi

unread,
Mar 5, 2012, 9:47:35 AM3/5/12
to etp_jan...@googlegroups.com
vanneth your part?



--

Vanneth Ny

unread,
Mar 5, 2012, 9:48:05 AM3/5/12
to etp_jan...@googlegroups.com
I will send to you tonight!

Vanneth Ny

unread,
Mar 5, 2012, 3:36:54 PM3/5/12
to etp_jan...@googlegroups.com
Introduction and Design( Vanneth).docx

mohd khairul

unread,
Mar 6, 2012, 3:06:05 AM3/6/12
to etp_Jan2012g21
hi Zulhilmi please send me the circuit before tonight. i want to
finish the simulation this evening. i want to study tonight. i have a
test tomorrow

On Mar 6, 4:36 am, Vanneth Ny <vannet...@gmail.com> wrote:
> On 5 March 2012 22:48, Vanneth Ny <vannet...@gmail.com> wrote:
>
>
>
>
>
>
>
>
>
> > I will send to you tonight!
>
> > On 5 March 2012 16:39, mohd khairul <mkhair...@gmail.com> wrote:
>
> >> this is my part... thank you. check attachment.
>
> >> On 5 March 2012 15:02, Zulkhairi Jaafar <z.madri...@gmail.com> wrote:
>
> >>> This is my part... Please sent to this thread okay! ASAP
>
> > --
> > Ny Vanneth
> > Civil Engineering Student
> > Universiti Teknologi PETRONAS
> > Bandar Seri Iskandar , 31750 Tronoh
> > Perak Darul Ridzuan, Malaysia
> > Tel: 0163447670
>
> --
> Ny Vanneth
> Civil Engineering Student
> Universiti Teknologi PETRONAS
> Bandar Seri Iskandar , 31750 Tronoh
> Perak Darul Ridzuan, Malaysia
> Tel: 0163447670
>
>  Introduction and Design( Vanneth).docx
> 118KViewDownload

nadia hartini suhaimi

unread,
Mar 6, 2012, 4:09:39 AM3/6/12
to etp_jan...@googlegroups.com

dear all,

here i attach the progress report..

there are a few part that i edited for make it simplier.

dr already take this progress report

thank you
ENGINEERING TEAM PROJECT.doc
Reply all
Reply to author
Forward
0 new messages