Update Week 9

0 views
Skip to first unread message

nazreen

unread,
Jul 21, 2013, 7:36:37 AM7/21/13
to etp...@googlegroups.com
As Salam / Hye guys..

For week 9, ok lets divide our group into 2 team:
1) Team 1 : Hadi, Hakim & Ahmed = in-charge of technical part, boats, assembly, arrangement of the equipment on the platform, motor, power,(all calculation, simulation 3D, cross section, orthogonal look, and etc should be perform, and clear.

2) Team 2 : NAzrin & Stephen : work on the layer of the oil absorbent material, using carbon nanotube embedded wiith cotton, chitosan &  coconut fibre.. (all simulation, mathematics, how to deisgn layer, the thickness and etc should be perform.

This is what Dr Ny want.. about Carbon nanotubes embedded with cotton (CNT) she already ask her friend in ca,bridge and we can achieve it. She is very enthusistic about CNT in our prject.

The heart of our prject is the drum & its layer with CNT. the rest (engineering part) we can do it .....We should allocate and concntrate a lot on this project from NOW.

Team 1 : 
-arrngement of the equipment on board, plan, layout, electronics, and etc.
the design and all related to boat, all calculation of the buoyancy of the boat, how much it floats, the load it can support, the velocity of the boats, and in the dense water (with oil).

Team 2:
- build the layer of absorbent.. need to consult and deal with dr  NY.

I will explain the details of this in next meeting. 

Next meeting : 23 July 2013 (Tuesday)  @ 9 pm.. V5 cafe maybe..anything just inform me

Has Hadi

unread,
Jul 21, 2013, 1:50:24 PM7/21/13
to etp...@googlegroups.com
noted. owh, and forgot to sms u. the form3 already sent that day. Claim about Rm199. the lab executive(EE) ask me a lot about the coconut husk stuff, why so expensive.. ha3. 


--
You received this message because you are subscribed to the Google Groups "ETP_G9" group.
To unsubscribe from this group and stop receiving emails from it, send an email to etp_g9+un...@googlegroups.com.
For more options, visit https://groups.google.com/groups/opt_out.
 
 



--
Regards,

AHMAD SAIFULHADI BIN AB HALIM (APTech)
(BACHELOR OF ENGINEERING (HONS) PETROLEUM)

Universiti Teknologi PETRONAS

Bandar Seri Iskandar

31750 Tronoh

Perak, Malaysia.



Managing Director of UTP Robotic Society (PETROBOTS)



Stephen Liew

unread,
Jul 21, 2013, 10:35:23 PM7/21/13
to etp...@googlegroups.com
So Naz will we be performing experiments on the crude oil in lab this week? I'm free on Wednesday

Stephen

نزرين شفيق روسلان

unread,
Jul 22, 2013, 12:19:55 AM7/22/13
to etp...@googlegroups.com
bout the coconut husk, 1/4 of the bundle cost RM50..tht is the chpest...unless we bought 1 bndle RM250 :) hihi
Nazrin Syafiq B. Roslan
Chemical Engineering
Universiti Teknologi PETRONAS
imad_fis...@yahoo.com


نزرين شفيق روسلان

unread,
Jul 22, 2013, 12:20:15 AM7/22/13
to etp...@googlegroups.com
ya..let dcde bout the test

نزرين شفيق روسلان

unread,
Jul 22, 2013, 3:14:13 AM7/22/13
to etp...@googlegroups.com
the end cap is ready.ill collect it this thursday. thus, for Technical teeam, please revise back the design, how to rotate the drum using rod, chain, poower/ motor & etc.... juz plan..dont wait till everything in front. whtver u dun have, tell me, ill straight away ask Dr Ny. we also will get permission into the nano tube lab to do some nano tube work.. Her PHD studnt will help us..Tecnical team concentrate on the design boat, system, control, electronic, power, layout, plan 3D, 2D and so on..

is it ok  guys?? need ur reply

Has Hadi

unread,
Jul 22, 2013, 3:20:22 AM7/22/13
to etp...@googlegroups.com
need also to cut them.. ahmed,hakim, we need to meet up tonight.



For more options, visit https://groups.google.com/groups/opt_out.
 
 

نزرين شفيق روسلان

unread,
Jul 22, 2013, 3:30:46 AM7/22/13
to etp...@googlegroups.com
ok then we  meet tonitght...around 10 pm v5 cafe

Has Hadi

unread,
Jul 22, 2013, 3:35:57 AM7/22/13
to etp...@googlegroups.com
i mean technical team A, u already busy wif your team hahahaha...

نزرين شفيق روسلان

unread,
Jul 22, 2013, 4:06:44 AM7/22/13
to etp...@googlegroups.com
nvrmind la..help each other, if tonitei can also explain the team progress

wan hakim

unread,
Jul 22, 2013, 4:07:54 AM7/22/13
to etp...@googlegroups.com
Sure2.. Everyone come and gather all tge materials together..

Has Hadi

unread,
Jul 22, 2013, 6:04:06 AM7/22/13
to etp...@googlegroups.com
orait


--
You received this message because you are subscribed to the Google Groups "ETP_G9" group.
To unsubscribe from this group and stop receiving emails from it, send an email to etp_g9+un...@googlegroups.com.
Visit this group at http://groups.google.com/group/etp_g9.
For more options, visit https://groups.google.com/groups/opt_out.
 
 

Stephen Liew

unread,
Jul 22, 2013, 6:07:19 AM7/22/13
to etp...@googlegroups.com
Sorry will be in KL... Hopefully can be back by tmr :/
If need anything that I can help out, let me know.

Stephen
orait
--
Regards,

AHMAD SAIFULHADI BIN AB HALIM (APTech)
(BACHELOR OF ENGINEERING (HONS) PETROLEUM)

Universiti Teknologi PETRONAS

Bandar Seri Iskandar

31750 Tronoh

Perak, Malaysia.



Managing Director of UTP Robotic Society (PETROBOTS)



Ahmed Saeed

unread,
Jul 22, 2013, 8:37:28 AM7/22/13
to etp...@googlegroups.com
ok ... noted 


2013/7/22 Stephen Liew <cs.ste...@gmail.com>



--
AHMED SAEED AHMED
UNIVERSITI TEKNOLOGI PETRONAS
PETROLEUM ENGINEERING FACULTY 
CONTACT:+60176751443
MALAYSI
A

wan hakim

unread,
Jul 22, 2013, 10:10:27 AM7/22/13
to etp...@googlegroups.com
Here at v5 kafe..
ok ... noted 
AHMED SAEED AHMED
UNIVERSITI TEKNOLOGI PETRONAS
PETROLEUM ENGINEERING FACULTY 
CONTACT:+60176751443
MALAYSI
A

--

Ahmed Saeed

unread,
Jul 22, 2013, 10:14:23 AM7/22/13
to etp...@googlegroups.com
ok coming 



2013/7/22 wan hakim <wanha...@gmail.com>

Stephen Liew

unread,
Jul 23, 2013, 3:20:32 AM7/23/13
to etp...@googlegroups.com
Hey im back! 
so the meeting tonight still on?

wan hakim

unread,
Jul 23, 2013, 3:23:56 AM7/23/13
to etp...@googlegroups.com
Team A meet at lab tonight at 10pm.. 

wan hakim

unread,
Jul 23, 2013, 6:16:35 AM7/23/13
to etp...@googlegroups.com
Team A meet at lab tonight at 10pm.. 

On Tuesday, July 23, 2013, Stephen Liew wrote:

نزرين شفيق روسلان

unread,
Jul 23, 2013, 6:41:30 AM7/23/13
to etp...@googlegroups.com
Stephen, we just meet only two of us to dsscuss details ya..if free we go and help them.lets make it 10.30 pm v5 cafe.ok? hakim if ur team stay lama, we want go there n help :)


--
You received this message because you are subscribed to the Google Groups "ETP_G9" group.
To unsubscribe from this group and stop receiving emails from it, send an email to etp_g9+un...@googlegroups.com.
Visit this group at http://groups.google.com/group/etp_g9.
For more options, visit https://groups.google.com/groups/opt_out.
 
 



--

Has Hadi

unread,
Jul 23, 2013, 7:09:52 AM7/23/13
to etp...@googlegroups.com
lama jgk kot. 
Regards,

Stephen Liew

unread,
Jul 23, 2013, 8:53:01 AM7/23/13
to etp...@googlegroups.com
okay no prob. i can go lab help also

Stephen Liew

unread,
Jul 23, 2013, 8:53:19 AM7/23/13
to etp...@googlegroups.com
or naz, we just meet at the lab je la??

Ahmed Saeed

unread,
Jul 23, 2013, 1:25:53 PM7/23/13
to etp...@googlegroups.com
sorry guys ... huhuhuh i over slept .... idint even break my fast ... i juts woke up ....i dont know what to say i am so sorry again 


2013/7/23 Stephen Liew <cs.ste...@gmail.com>


--

wan hakim

unread,
Jul 23, 2013, 1:46:43 PM7/23/13
to etp...@googlegroups.com
no problem bro..

Ahmed Saeed

unread,
Jul 23, 2013, 1:49:58 PM7/23/13
to etp...@googlegroups.com
Hakim did you assemble the platform ?? what is the latest updates ??


2013/7/24 wan hakim <wanha...@gmail.com>
no problem bro..

wan hakim

unread,
Jul 23, 2013, 1:52:04 PM7/23/13
to etp...@googlegroups.com
i finished the wiring part.. it went well.. but the platform is bendable.. we need something as a frame.. so tomorrow we need to got to pasir puteh again as discussed with me and hadi.. because the scrap metal inside the lab cannot find suitable one..  

Ahmed Saeed

unread,
Jul 23, 2013, 1:56:27 PM7/23/13
to etp...@googlegroups.com
ok just inform me what time ... if you want me to go with u , or today any thing  0143018219 ... just sms me ... thank you vey much 


2013/7/24 wan hakim <wanha...@gmail.com>

wan hakim

unread,
Jul 23, 2013, 2:00:55 PM7/23/13
to etp...@googlegroups.com
orait bro..

wan hakim

unread,
Jul 24, 2013, 2:32:38 AM7/24/13
to etp...@googlegroups.com
Pudi.. I have been trying to contact you since 12.. Dun know if u got themzz rite now already 2.30.. lets go to pasir putih by 3..

Has Hadi

unread,
Jul 24, 2013, 2:42:35 AM7/24/13
to etp...@googlegroups.com
roger that. im ready


--
You received this message because you are subscribed to the Google Groups "ETP_G9" group.
To unsubscribe from this group and stop receiving emails from it, send an email to etp_g9+un...@googlegroups.com.
Visit this group at http://groups.google.com/group/etp_g9.
For more options, visit https://groups.google.com/groups/opt_out.
 
 

Stephen Liew

unread,
Jul 24, 2013, 9:49:48 AM7/24/13
to etp...@googlegroups.com
So tmr will be meeting Dr Hasan at 9am to discuss with him and get carbon nanotubes from him.
Then the plan now is to embed the CNT into polypropylene. Will be going to the lab at 4pm, already contacted Prof Noorhana's student at the lab.

نزرين شفيق روسلان

unread,
Jul 24, 2013, 10:48:28 AM7/24/13
to etp...@googlegroups.com
noted.just text me where  ok
Reply all
Reply to author
Forward
0 new messages