Updates

1 view
Skip to first unread message

farah wahidah mazlan

unread,
Jul 30, 2011, 7:59:53 AM7/30/11
to etp...@googlegroups.com
I went to the engineering workshop just now. they say it is possible to make but they need more specific measurements for the hydraulics part.

I've persuaded the bos of the shop to make it possible for it to be made on time, he said ok, but need the measurements fast.

So attn to zaim, minta tlg cepat2 buat breakdown diagrams tuk uncle tu so that kte leh email kat dia n wat cepat.
For the gears, kalau bleh, wat yang sama juga, t kte minta tlg dia wat jugak. kalau de prob, kte wat sama2.
harap2 sempat siap on time.

for the welding shop, tadi pegi, tapi kedai tu tutup. maybe pergi waktu tu dia ngah lunch hour. 
kte g this mon, ambil smua parts tu, try assemble. 

ok, tu je update dr saya. tq~

--
Farah Wahidah Mazlan
3rd  Year 1st Semester
Electrical n Electronics Engineering
Universiti Teknologi PETRONAS
Ctc num: +60134753758

Reply all
Reply to author
Forward
0 new messages