Final Report Job Distribution

3 views
Skip to first unread message

Kok Jian Hao

unread,
Aug 14, 2012, 12:44:40 PM8/14/12
to etp-g28-...@googlegroups.com

Dear all, 

This are the job distribution that we have discussed on the meeting just now: 

Joey
- Title
- Acknowledgement
- Executive Summary
- Table of Content
- Background
- Reference
- Appendices


Kok
- Identification and Definition of Problem
- Objective and Scope
- Literature Review


Pero
- Theory
- Procedure


Nasih
- Project Managment
- Business/ Economic analysis
- Discussion


Apih
- Engineering Analysis
- Conclusion
- Recommendation



Please complete the first draft of respective part by this Friday night, at 10pm ya. 


We will complete the final draft at 25th August (Saturday), and pass up the complete final draft to our SV on 27th August morning.


Until then, good luck and take cares all.



--
Warm Regards,
Kok Jian Hao (Stanley)

Bachelor (Hons) of Civil Engineering
Universiti Teknologi PETRONAS

Local Committee Universiti Teknologi PETRONAS
AIESEC in Malaysia.

Skype               : stanley.liv
Email                : kok.j...@aiesec.net
Personal Email  : stanle...@gmail.com
Website            : www.aiesec.my




Muhammad Azwan Ibrahim

unread,
Aug 16, 2012, 2:54:14 AM8/16/12
to etp-g28-...@googlegroups.com
hi
my health getting batter now. maybe because i didnt take sahur for few
days last week, that why i got gastric
can someone tell me what should i do? im part of this group too

--
Muhammad Azwan Bin Ibrahim
2nd Year 1st Semester
Mechanical Engineering
Universiti Teknologi PETRONAS
Bandar Seri Iskandar
31750 Tronoh
Perak Darul Ridzuan

Contacts :
clou...@ymail.com cloudwan...@gmail.com
Web site: http://azwancloudwan.blogspot.com/
Tel. No.
010-3768447

"Ya Allah penuhilah ruang hidupku ini dgn tunduk dan sujud kpd mu dan
jauhikanlah dirku ini drpd dose & maksiat"

Joey lam

unread,
Aug 17, 2012, 8:13:08 AM8/17/12
to etp-g28-...@googlegroups.com
My part.
Appendices need to wait u guys finish all the calculation etc, baru can done....


--
You received this message because you are subscribed to the Google Groups "ETP G28 MAY 2012" group.
To post to this group, send email to etp-g28-...@googlegroups.com.
To unsubscribe from this group, send email to etp-g28-may-20...@googlegroups.com.
For more options, visit this group at http://groups.google.com/group/etp-g28-may-2012?hl=en.




--
with regards,

Lam Pei Shin
3rd year1st sem
Chemical Engineering
Universiti Teknologi Petronas
0149038122

"If you can't explain it simply, you don't understand it well enough."



ENGINEERING TEAM PROJECT GROUP 28.docx
References.docx

safirul saharudin

unread,
Aug 17, 2012, 8:15:45 AM8/17/12
to etp-g28-...@googlegroups.com
Little bit late for my part.. I'm in my kampung
SAFIRUL MOHD IZZAT BIN SAHARUDIN
MECHANICAL ENGINEERING,
3RD YEAR 1ST SEMESTER,
UNIVERSITI TEKNOLOGI PETRONAS,
31750, BANDAR SERI ISKANDAR,
TRONOH, PERAK DARUL RIDZUAN.




Joey lam

unread,
Aug 17, 2012, 8:19:48 AM8/17/12
to etp-g28-...@googlegroups.com
Okie dokie! Enjoy yourselves!
Selamat Hari Raya AIdilfitri~~~


ps** bring bak cookies!!! =P

Kok Jian Hao

unread,
Aug 19, 2012, 10:54:15 AM8/19/12
to etp-g28-...@googlegroups.com

Sorry for late. :))
My Part (F,G,I).docx

Nasih Saifullah

unread,
Aug 22, 2012, 9:28:04 AM8/22/12
to etp-g28-...@googlegroups.com
my part. but the gantt chart isnt complete yet. need to wait for apih to complete it.
Regards,
MUHAMMAD NASIH BIN SAIFULLAH
Electrical and Electronic Engineering
Universiti Teknologi PETRONAS
Bandar Seri Iskandar Perak, Malaysia.
Final report_nasih.docx

Kok Jian Hao

unread,
Aug 25, 2012, 12:56:49 PM8/25/12
to etp-g28-...@googlegroups.com
Hi, we will meet at tmr night (Sunday), 9pm at v3 cafe for compilation of our final report is that okay for all? 

Nasih Saifullah

unread,
Aug 26, 2012, 3:21:27 AM8/26/12
to etp-g28-...@googlegroups.com
sorry can't join. i have two project meetings tonight.

safirul saharudin

unread,
Aug 26, 2012, 4:31:14 AM8/26/12
to etp-g28-...@googlegroups.com
Procedure.docx
Theory.docx

apih Abidin

unread,
Aug 26, 2012, 7:21:13 AM8/26/12
to etp-g28-...@googlegroups.com
sorry ...bru smpai utp.. this is my part..
conclusion and recommendation 
CONCLUSION etp.docx

Kok Jian Hao

unread,
Aug 26, 2012, 10:01:50 AM8/26/12
to etp-g28-...@googlegroups.com

Pero, 

The Procedure you did is overlapped with others, actually what Procedure/Methodology is what me and you present in the poster. You may add some pictures with it for more attractive purpose. 


Apih, 

You may need the data for engineering analysis. Attached is the file. 
Poster ETP group 28 editted.pptx
ETP presentation Slides.pptx

Kok Jian Hao

unread,
Aug 26, 2012, 10:04:10 AM8/26/12
to etp-g28-...@googlegroups.com
Nasih, 


We would need your economic analysis. :)

And we would like to use your printer for the printing is that okay?


Thanks.

safirul saharudin

unread,
Aug 26, 2012, 10:05:18 AM8/26/12
to etp-g28-...@googlegroups.com
I thought it is the procedure in the making of the prototype.. Its ok.. I'll try to finish it before tomorrow.

Nasih Saifullah

unread,
Aug 26, 2012, 10:25:15 AM8/26/12
to etp-g28-...@googlegroups.com
what you mean by economic analysis? yes okay no problem.

To unsubscribe from this group, send email to etp-g28-may-20...@googlegroups.com.
For more options, visit this group at http://groups.google.com/group/etp-g28-may-2012?hl=en.



--
Regards,
MUHAMMAD NASIH BIN SAIFULLAH
Electrical and Electronic Engineering
Universiti Teknologi PETRONAS

Kok Jian Hao

unread,
Aug 26, 2012, 10:33:57 AM8/26/12
to etp-g28-...@googlegroups.com
Yea, I just saw the Economic Analysis in your doc, Nasih. 


And we will have a meeting with our SV tomorrow at 3pm, and we plan to take some photos with him. 

So maybe dress smartly, and we may need your tablet tmr too, Nasih. 


Please bring along all your previous logbooks to submit to our SV too. 


See you all tmr.



apih Abidin

unread,
Aug 26, 2012, 11:15:42 AM8/26/12
to etp-g28-...@googlegroups.com

please check this one.. and for result , it already on discussion but im try to simplified it.. 
and anything commment about  conclusion?
Engineering analysis.docx

Joey lam

unread,
Aug 26, 2012, 9:55:03 PM8/26/12
to etp-g28-...@googlegroups.com
Apih, yang gantz chart tu, boleh letak date utk yg x de date punya?
date utk task allocation tu letak logbook punya date aje la...

safirul saharudin

unread,
Aug 26, 2012, 11:33:21 PM8/26/12
to etp-g28-...@googlegroups.com
procedure update.
Procedure.docx

Nasih Saifullah

unread,
Aug 27, 2012, 1:31:29 AM8/27/12
to etp-g28-...@googlegroups.com
i'm going to meet my lecturer at 2. you want me to help print the report or not? i'll go straight to block 19 after that.

Kok Jian Hao

unread,
Aug 27, 2012, 1:35:16 AM8/27/12
to etp-g28-...@googlegroups.com

Hi Nasih, 

Joey will send the report to you soon before 2pm.


Just clip it with stapler is good. 

THanks.

Nasih Saifullah

unread,
Aug 27, 2012, 1:36:16 AM8/27/12
to etp-g28-...@googlegroups.com
okayh.

Joey lam

unread,
Aug 27, 2012, 1:45:58 AM8/27/12
to etp-g28-...@googlegroups.com
sorry for the late. toom much to edit.
ENGINEERING TEAM PROJECT GROUP 28 final report compiled.docx

Joey lam

unread,
Aug 27, 2012, 4:37:41 AM8/27/12
to etp-g28-...@googlegroups.com
i editted the table of content, the numbering, the conclusion,recommendation, the graph marker, the error in numbering the figure in Nasih's part.

Lam Pei Shin
3rd year 1st sem

Chemical Engineering
Universiti Teknologi Petronas
0149038122
ENGINEERING TEAM PROJECT GROUP 28 final report compiled.docx

Kok Jian Hao

unread,
Aug 27, 2012, 1:01:59 PM8/27/12
to etp-g28-...@googlegroups.com
Apih, have you done your part?

apih Abidin

unread,
Aug 28, 2012, 8:55:45 AM8/28/12
to etp-g28-...@googlegroups.com
make some correction conclusion part. comment please.
CONCLUSION etp.docx

apih Abidin

unread,
Aug 28, 2012, 8:56:05 AM8/28/12
to etp-g28-...@googlegroups.com
sorry guys.. salah post. :D
Reply all
Reply to author
Forward
0 new messages