MISSION accomplished.

0 views
Skip to first unread message

shahrul ezwan

unread,
Aug 1, 2011, 12:45:43 PM8/1/11
to engineering-te...@googlegroups.com
salam n hi.

just now, we had run a few trial in order to check the effectiveness of our IMBA bin. the result is great.
there are few thing did not settle yet.

1) the outer compartment.
   - this task hopefully shahril n leon can think how to complete it.

2) poster printing
  - khalida n rose will print it tomorrow.

our next meeting will be tomorrow night. the time n place will be tell soon. our agenda is to discuss the flow of our presentation.






--
Mohd Shahrul Ezwan Bin Ismail
Mechanical Engineering
President
Residential College Support Unit (RCSU)
University Technology PETRONAS (UTP)
Bandar Sri Iskandar,
31750 Tronoh,
Perak, Malaysia
.


Khalida Khalid

unread,
Aug 1, 2011, 1:08:50 PM8/1/11
to engineering-te...@googlegroups.com
POSTER ETP MAY 2011 new.jpg

Low Jun Leon

unread,
Aug 1, 2011, 1:11:27 PM8/1/11
to engineering-te...@googlegroups.com
Hei, I just found some boxes , hopefully can fit in.....I jz came back from v5....v4 n v3 din have big box
--
REGARDS,

LOW JUN LEON
PETROLEUM ENGINEERING
3RD YEAR 1ST SEMESTER
016-4362338

shahrul ezwan

unread,
Aug 1, 2011, 1:13:22 PM8/1/11
to engineering-te...@googlegroups.com
if u wanna test it, u can come to my room  to take the bin.

Low Jun Leon

unread,
Aug 1, 2011, 1:14:20 PM8/1/11
to engineering-te...@googlegroups.com
I come to ur block now le....u in which block? Room number?


On Tue, Aug 2, 2011 at 1:13 AM, shahrul ezwan <shahrul...@gmail.com> wrote:
if u wanna test it, u can come to my room  to take the bin.



shahrul ezwan

unread,
Aug 1, 2011, 1:15:50 PM8/1/11
to engineering-te...@googlegroups.com
v3a t4 2. if u arrive my blok, just text me, i bring the bin to you.

Mohamad Shahril Majid

unread,
Aug 1, 2011, 1:17:33 PM8/1/11
to engineering-te...@googlegroups.com
excellent work...i got a good feeling bout this... i'm sure we can pull this off.......

On Tue, Aug 2, 2011 at 1:08 AM, Khalida Khalid <shis...@gmail.com> wrote:



--
Ambition Beyond Vision



Mohamad Shahril Majid B Allapitchai
Petroleum Engineering
3rd Year 1st Semester
Universiti Teknologi Petronas
012-4250224 

Project Director,
Career Summit For Future Malaysian Leader(CASFUMAL) 2011,
Universiti Teknologi Petronas



Low Jun Leon

unread,
Aug 1, 2011, 1:53:27 PM8/1/11
to engineering-te...@googlegroups.com
Shahrul and I think that the bin alone is enough, we just have to put something to make it a bit higher. What do u think? Lets vote!

Mohamad Shahril Majid

unread,
Aug 1, 2011, 1:58:15 PM8/1/11
to engineering-te...@googlegroups.com
i still feel that the "ooomph" factor is there, if they cant see the bin... meaning they can only see sumthin like a big black cupboard like box.. and wen they throw food in, only plastic comes out... it adds to the curiosity factor as to how the thing works... so we kinda like have sumthing hidden that can WOW them...

shahrul ezwan

unread,
Aug 1, 2011, 2:00:22 PM8/1/11
to engineering-te...@googlegroups.com
yes,, but try to think how to do, we only have 1 day left.

alex liew

unread,
Aug 1, 2011, 2:00:24 PM8/1/11
to engineering-te...@googlegroups.com
i agree with shahril. it's not that hard anyways. we just have to find a big box, say like a desktop box. shahrul, i would still like to do testing with the stronger motor. please don't seal the weaker motor tight yet.

Low Jun Leon

unread,
Aug 1, 2011, 2:01:58 PM8/1/11
to engineering-te...@googlegroups.com
But the biggest box also cant cover the whole bin. I am afraid tmr those marts wont open so early. Only v5 mart has those boxes 

shahrul ezwan

unread,
Aug 1, 2011, 2:01:59 PM8/1/11
to engineering-te...@googlegroups.com
try to finish up the switch thing tonight. tomorrow we can paste it.

alex liew

unread,
Aug 1, 2011, 2:03:56 PM8/1/11
to engineering-te...@googlegroups.com
leon and shahril, i trust you guys can find it. the switch no problem, i have all the wire we need. i will bring it to our meeting tomorrow night and install there.

Low Jun Leon

unread,
Aug 1, 2011, 2:04:27 PM8/1/11
to engineering-te...@googlegroups.com
I am keeping the boxes. They just managed to fit in the bin, we need to cut and paste the boxes into a bigger box then


On Tue, Aug 2, 2011 at 2:01 AM, shahrul ezwan <shahrul...@gmail.com> wrote:
try to finish up the switch thing tonight. tomorrow we can paste it.



Reply all
Reply to author
Forward
0 new messages