Hello All, 

We wanted to provide you a quick update for the gate project. We expect to have the target dates established after securing the county approval.

Quick updates below:

1. Drawing submitted by the contractor to the county for approval
2. Waiting on the county to schedule the review meeting with the contractor; should be sometime this week ( Lonnie to confirm)
3. County approval will be received after the review meeting; it will take about 2 weeks after the review meeting to get the approval from the county.
4. Contract will be signed after securing the approval from the county. We will be able to provide a definitive timeline once the contract is signed.

Attached is the pic of the drawing submitted to the county. This drawing shows the current measurements from the proposed position of gates and the road (Stoney point) in the current setting; we meet all necessary criteria to get the county approval.

PS: please keep this email thread only for gate related questions/updates.

Thanks,
Suhail
Sent from my iPhone

image1.JPG

Ravenswood BOD

unread,
Nov 1, 2016, 10:57:44 PM11/1/16
to Nagesh Kasichainula, Suhail Mehta, varad...@gmail.com
Hello All,

Quick update - we got the gate project approved from the county; will be signing the contract next week.

Detail to follow - stay tuned 😃

Cheers!
SM

Sent from my iPhone
--
You received this message because you are subscribed to the Google Groups "Ravenswood Residents Email" group.
To unsubscribe from this group and stop receiving emails from it, send an email to emailravenswo...@googlegroups.com.
To post to this group, send email to emailra...@googlegroups.com.
For more options, visit https://groups.google.com/d/optout.

Ravenswood BOD

unread,
Nov 13, 2016, 7:19:00 PM11/13/16
to Nagesh Kasichainula, Suhail Mehta, varad...@gmail.com, Rahul Lot 15 Sharma
Hello All,

Congratulation!  We have signed the contract for the Gate Project last week.  The work will commence from Tuesday, Nov 15th and we expect to have the gate installed by mid December.  Workers will be around from 8:30AM to 4:30PM everyday; we have been assured that there will be minimal interference for traffic coming in and out of the subdivision.  I will share detailed project schedule once I get it from the contractor.  

Thanks for your support and patience as we work towards becoming a gated community.

~SM 

Sent from my iPhone

Ravenswood BOD

unread,
Nov 15, 2016, 10:48:48 PM11/15/16
to Nagesh Kasichainula, Suhail Mehta, varad...@gmail.com, Rahul Lot 15 Sharma
Hello All,

Below is project plan and time line we received from the contractor:

 Ravenswood HOA

Stoney Point Road

Cumming, GA 30041

Attn.: Board Members  

Re: Controlled Access Gates Schedule for Community Entrance  

 

Work will start at 8:30 am and we will clean up and finish at 4:30 pm Monday – Friday and maybe some Saturdays depending on completed work and weather conditions. We will keep one side of the property open at all times so not to interrupt traffic or homeowners

                                                                                                                               

Tuesday November 15th – Friday November 18th    

Start ground work, saw cut asphalt, cut out for center gate island and cut in all loops. Remove asphalt and form for center gate island and new curbing by roadway

 

Monday November 21st – Wednesday November 23rd 

Trench and run conduit, install junction boxes, fittings and gooseneck pedestal boxes. Set hinge and catch post for pedestrian walk gate. Call in for electrical inspection and cover trenches 

 

Monday November 28th – Friday December 2nd 

Install curbing, and asphalt for front entrance to extend right side of roadway opening on Stoney Point Road. Bore under roadway and run conduit sleeves for gate operators and telephone entry equipment. Set gate hinge post and pour concrete for column footers, center island, gate hinge post, gate operator pads, telephone entry pedestal and protection bollards. Measure for gate leafs, perimeter fencing and pedestrian gate and start fabrication 

 

Monday December 5th – Friday December 9th

Run all power wiring and low voltage wiring for telephone entry system, gate operators and power fail inverters. Install visitor call box and paint bollards. Install Knox lock and receiver for transmitters. Build brick/stone columns and cap each column 

   

Monday December 12th  -  Friday December 16th 

Install Gate Leafs and pedestrian gates. Install fencing panels, gate operators and all access equipment. Wire gate system and touch up paint from welding operator arms. Test gate system to ensure all equipment is functioning properly and download data to visitor call box. Call Forsyth County and have final inspection on gate system 

Thanks,
Suhail



Sent from my iPhone

Rahul Sharma

unread,
Dec 5, 2025, 9:52:57 AM12/5/25
to morrissettema, emailra...@googlegroups.com

Hi Mike,

Email below and the attachment shows the Gate Entrance Plans that were submitted by the contractor to the county in October 2016.  The contract with the contractor was signed only after getting the county approval as is stated in the email as well.  County as well as Fieldstone should have all these records.  There are also emails in which Jim Sutton and Ryan Maki (both were Fieldstone Reps at that time) were in discussion with the County and the contractor on the abandonment.  And emails on the final inspection (Electrical cabling was the last inspection - the permit number image was shared by Shyam before).

Hopefully this helps Fieldstone and the County to get to the bottom of what seems to be misplaced paperwork at their end.

Kind Regards,

Rahul


From: Ravenswood BOD <ravens...@gmail.com>
Date: October 23, 2016 at 9:37:03 PM CDT
Subject: [Ravenswood Residents Email] Gate Project Update
Reply-To: ravens...@gmail.com



Shyam Mallavarapu

unread,
Dec 5, 2025, 10:06:37 AM12/5/25
to rshar...@gmail.com, morrissettema, emailra...@googlegroups.com
I’m going to send a note to Commissioner Laura Semanson and get her time to discuss this situation. I’ll include Mike and Rahul for now. 

Kevin Strange

unread,
Dec 10, 2025, 4:53:37 PM12/10/25
to rshar...@gmail.com, morrissettema, emailra...@googlegroups.com
Not that it matters but I think the Tmobile Fiber team is what caused this to be looked at. 

I got a VM from the Tmobile rep to say they were working on getting the final approvals to come in. They had run into issues with the HOA.  So when they were not able to just come in like they have in other neighborhoods they pushed to ask why and the county could nor produce the documents. 

Just my theory. 

On Fri, Dec 5, 2025 at 9:52 AM Rahul Sharma <rshar...@gmail.com> wrote:

Vishal Srivastava

unread,
Dec 10, 2025, 5:37:40 PM12/10/25
to kxst...@gmail.com, rshar...@gmail.com, morrissettema, emailra...@googlegroups.com
I am not sure why County is  answerable to greedy corporations, if something happens in the neighborhood because the gate is not operational, that person should sue T-mobile !!! Having said that nobody from our neighbourhood should subscribe to T-Mobile service which caused this trouble we should raise this in twitter / facebook and all social media how greedy corporation like T-Mobile are troubling citizens like us 🙂😃😀

Kevin Strange

unread,
Dec 22, 2025, 4:12:04 PM12/22/25
to shyam.ma...@gmail.com, morrissettema, Rick Dye, emailra...@googlegroups.com, rshar...@gmail.com, Adrienne Mayfield, Ravenswood BOD
Mike, 

Do we have an update from Fieldstone and Kyle? 

I am still not clear on the following:

  1. Who is covering the costs of the lawyers to clear up any right of way issues, surveys, etc?
  2. Shyam, in an email you sent on Dec 5th, you indicated you were reaching out to Commissioner Laura Semanson and copying Mike and Rahul. Did that happen and what was the outcome of that?
  3. Has anyone determined why we can not operate the gate until this is resolved? Considering it has been in place since 2016 and this is just a paperwork issue and does not impact any of the county public service workers gaining access to the community, but does impact our safety? 
  4. What is the date of our next HOA meeting? 

Thanks
Kevin 

Kevin Strange

unread,
Dec 28, 2025, 11:04:44 PM12/28/25
to shyam.ma...@gmail.com, morrissettema, Rick Dye, emailra...@googlegroups.com, rshar...@gmail.com, Adrienne Mayfield, Ravenswood BOD
Hello Shyam, 

Did you hear anything back from the commissioner you indicated you were reaching out to?  It would be great to determine why the gate can not be operated while this is resolved. 

I don't understand what issues the County could be experiencing now that haven't been an issue since 2016. 


Thanks
Kevin 

Shyam Mallavarapu

unread,
Dec 29, 2025, 12:45:13 PM12/29/25
to Kevin Strange, morrissettema, Rick Dye, emailra...@googlegroups.com, rshar...@gmail.com, Adrienne Mayfield, Ravenswood BOD
I reached out to Laura again this morning, I will get her time to meet and discuss the situation.

Thanks
Shyam M

Kevin Strange

unread,
Dec 29, 2025, 2:02:26 PM12/29/25
to Rick Dye, Shyam Mallavarapu, morrissettema, emailra...@googlegroups.com, rshar...@gmail.com, Adrienne Mayfield, Ravenswood BOD
Thanks Shyam.  

 I had family visiting and they were asking since the gate is open 24/7 are we more vigilant about keeping the doors locked. So even others sense the need for all security measures to be in place. I would feel a little more secure with the gate functional. I think this is the angel to take with the commissioner. Security. 

Kevin 

On Mon, Dec 29, 2025 at 1:06 PM Rick Dye <mari...@gmail.com> wrote:
Shyam,

Thank you very much!

Shyam Mallavarapu

unread,
Dec 30, 2025, 4:25:33 PM12/30/25
to Kevin Strange, Rick Dye, morrissettema, emailra...@googlegroups.com, rshar...@gmail.com, Adrienne Mayfield, Ravenswood BOD
Laura is going to get back in New Year, here is her response.

Not a lot of staff around this week due to the holidays and end of year vacations, but I will check. BOC last mtg was 12/18 and we are out until the new session starts 1/8.

Thanks
Shyam M