Re: MAHIPALPUR-VASANT KUNJ-NH-8 NEW ROAD

646 views
Skip to first unread message

REJIMON C K

unread,
Mar 15, 2011, 7:57:47 AM3/15/11
to DWARKA FORUM
Mr. Behl here come the response from UTTIPEC in the matter of Vasant Kunj-Mahipal Road.
There seems some positive response seem.
Now the ball in PWD court ? I am yet to get response from PWD in the matter.
Thanks to EM/DDA (NP Singh) for quick response in the matter.

Rejimon


 
On Wed, Feb 16, 2011 at 9:05 AM, purshotam behl <jaipu...@yahoo.co.in> wrote:
From the following news it seems to be a soothing  story , on papers and planning , as nothing has started yet , neither any techinical approvals have been granted to the underpass , at NH-8,  keepon wathching such news and feel , relaxed after crossing the tiresome Jaams here and there.
 

P.Behl.

9811113809





From: Dwarka Forum(Regd) <dwark...@gmail.com>
To: PWD En Chief <e...@pwddelhi.in>; PWD HQ <pwdhq...@gmail.com>
Sent: Tue, 15 February, 2011 10:41:10 AM
Subject: MAHIPALPUR-VASANT KUNJ-NH-8 NEW ROAD

To: Head
      PWD
 
Sir,
 
 
We would like to request you to disclose all the reports and documents related to this project  Andheria More to Vasant Kunj etc under Section 4 of RTI Act 2005 immediately.

This includes the report submitted by DMRC to your organisation. In case your office have any difficulty or reservation, let us know within 7 day.
 
Once the information uploaded, please inform us by email.
 
Thanking you

 
REJIMON C K.
President- Dwarka Forum
Sector 22, Dwarka, ND-77
 


 

On one side is putrid water and, on the other, a handful of houses on the barely noticeable mud road. Though it doesn’t look like anything significant right now, in a matter of months this road is expected to be converted into a 30-metre-wide bypass road to the ever-clogged Mahipalpur junction.

The Delhi Development Authority (DDA), which started constructing the road last week, is expected to complete it in six months — by August. “It feels like I spend half my life travelling through this stretch of road. Just to cover a few metres from Mahipalpur junction to Vasant Kunj takes anywhere between half-an-hour and 40 minutes,” said Satprakash Rana, Bijwasan MLA .

DS Constructions, the concessionaire for the Delhi-Gurgoan Expressway, stations two to four traffic marshals every day to regulate traffic at the junction. “Every evening, it is the same story; the traffic comes to a near-standstill here. There is a lot of honking, and people inadvertently end up fighting with each other,” said Naresh Kumar, a traffic marshall.

The new road starts just 10 metres from Ryan International School. Right now, there is nothing to indicate the presence of any construction activity except a yellow DDA board. However, going by the plans, the 1.6-km road is expected to cut across the unauthorised colony of Defence Enclave. A few houses in Defence Enclave, which currently fall in its route, will have to be demolished to pave the way for the 30-metre-wide road.

However, the residents don’t seem to be in a mood to take it lying down. “We were given provisional certificates of regularisation by the Delhi government, and now the DDA is planning to demolish our houses. We will not allow this,” Chattar Singh, a resident, said.

The road will meet the service lane of the NH-8, next to the Mahipalpur Cremation Ground, and the DDA has already begun digging work to facilitate this.

For several years now, the government had been drafting plans to decongest the Mahipalpur junction, without any sign of success. The project, which was initially a part of the Commonwealth Games emergency list, was yanked out of it a year before the event because the Delhi government was not confident about completing it on time.

Recently, Delhi airport authority DIAL held a meeting with Chief Minister Sheila Dikshit. After giving a presentation to demonstrate how the narrow Mahipalpur-Andheria Mor road was a veritable traffic nightmare, its officials told her that with the new Aerocity Metro Station coming up, they were planning to lay one more road connecting NH-8 and the Airport — beginning at the junction. However, Dikshit reportedly informed them that it will not be possible.

The main hurdle in the project has been land acquisition. As illegally extended colonies have sprouted on either side, the DDA has been left with very little space for executing the project. In 2009, the government had entrusted the Delhi Metro Rail Corporation with the task of carrying out a study of the area, and suggest ways to ease the traffic.

In an RTI reply to the planning that has gone into the project, the PWD revealed that the proposal for enhancing the corridor from Andheria Mor to Masoodpur was approved by the DDA in a meeting held on February 1, 2007. At Masoodpur, two alignments were suggested — first, to widen the road equally on both sides of the existing central verge to have 75 metres right of way, and the second, a bypass of the road. However, the proposal for the bypass was rejected.

However, widening of the road meant carrying out demolition work on the Masoodpur stretch. In a meeting held on May 24, 2007, it was decided that the PWD would prepare a revised layout plan of the elevated road at Masoodpur.

The PWD eventually submitted a proposal in April 2008 to construct a road-over-road at Masoodpur village and a by-pass from Ryan International School to the road leading to Dwarka at NH-8.

However, when Chief Secretary Rakesh Mehta visited the site on July 29, 2008, along with the PWD Engineer-in-Chief and other senior officials, they were not convinced about the idea of a road-over-road on the Masoodpur village stretch. Mehta requested the DDA to explore the land records and fix the centre line so that widening works could be taken up by the PWD. The DDA has not yet submitted its report.

The PWD then hired the DMRC to conduct a feasibility study of the area, and suggest ways for the construction.

The DMRC, in its reply, gave four options. However, none of the plans were approved due to demolition work that would have to be carried out.





--
REJIMON C K.
Each year 50million trees and 75 billion water is used to create 7  million tonnes of mail, over 40% of which is thrown away unopened. source : National Geographic so the next time you receive paper, think again  before you print. choose to receive emails instead .





RTI-Reply-UTTIPEC-on-Vasant-Kunj-Mahipalpur-58-D-6-28-2-2011.pdf

rajeev gmail

unread,
Mar 15, 2011, 9:14:01 AM3/15/11
to dwarka-r...@googlegroups.com

Excellent news sir , hopefully if done in 2011 dwarka traffic to and fro will be much better

 

Rajeev

--
"DWARKA-FORUM" :-- Dwarka Ki Awaaz
Visit Website www.dwarkaforum.org
Like us!! Click www.facebook.com/dwarkaforum
 
Police- 100 & 1090 Ambulance 102 & 1099, Fire 101, Traffic 1095/23010101, Dwarka PS: 28051584, ACP-28051587, DCP -28042984.
SDM-25017834, Child-1098, Women-1091, Sr. Citizen 1291, Postal 1914, AIIMS-26588700, Blood Bank, 23716441, ORBO 1060, Eye-1919, Disaster Management- 1070. LG Complaints 155355, CMO 155345, MCD-1266/25321235/23910419, DDA-24690431, DJB-1916, MTNL-198

purshotam behl

unread,
Mar 15, 2011, 12:49:20 PM3/15/11
to dwarka-r...@googlegroups.com
well done Rajimon Ji,
 The responce is positive , but still at planing stage since 2004. I wonder , nothing is finalized by any of the Dept. till date.
You are also aware that PWD had given the Drawings of this entire strech  last year , at UTTIP's  site .No tenders have been called so far. The traffic at the U turn of Raddison as well as at Toll plaza is beyond control at peak hours.
Let us see what PWD replies next.
P.behl
 





From: rajeev gmail <rajee...@gmail.com>
To: dwarka-r...@googlegroups.com
Sent: Tue, 15 March, 2011 6:44:01 PM
Subject: RE: [DWARKA FORUM] Re: MAHIPALPUR-VASANT KUNJ-NH-8 NEW ROAD

REJIMON C K

unread,
Jun 24, 2011, 12:14:01 AM6/24/11
to dwarka-r...@googlegroups.com
As discussed,
Please go ahead and if any other member interested in this may contact P. Behl
 
These new road will be of some help to all.
 
Rejimon
 

 

PUBLIC WORKS DEPARTMENT

GOVT. OF NCT OF DELHI

OFFICE OF THE PROJECT MANAGER

COMMONWEALTH PROJECT CIRCLE CW-12

Vikas Bhawan-II, Ground Floor, ‘E Block’

Near Metcalfe House, Upper Bela Road,Delhi-110054

Phone : 011-23814315, Fax 011-23813391

E-mail- commonwea...@gmail.com

 

No. 23(5)/Misc./PM/CW-12/                                                June                 2011

 

To

Shri C.K. Rejimon

President Dwarka Forum

Sector- 22, Dwarka

New Delhi-110 075

 

 

Sub. :  Transfer of application I.D. No. 718 received from C.K. Rejimon under Sub-Section

           (3) of section 6 of RTI Act-2005

 

Dear Sir,

 

This has reference to your communication through email addressed to Shri Rakesh Mishra, Engineer-in-Chief, PWD, as an appeal against Executive Engineer,  CW-122 subsequent to his office letter No. 54(28)/EE/CW-122/2010-11/319 dated 30.5.2011.

 

It is to submit that the letter, in question, as written in Hindi was unintentional and just as a noble cause to promote the National language as per Govt. Policy and as has also been explained by the Executive-Engineer, CW-122.  Shri Raj Pal Shivren, Executive Engineer, CW-121 has been looking after this Division as an additional charge since December, 2010, who was busy on the Ring Road, By Pass Project, its subsequent inspections by Shunglu Committee/ CAG and thereafter for compilation of the replies/reports till May, 2011.  The aforesaid letter as thus, was signed by Shri Bhim Sen, Asstt. Engineer, conversant with the Mehrauli-Mahipalpur Corridor proposal.  The non-disclosure of the name is also not deliberate, as the person can be easily identified by addresss and phone number given on letter head.  Still the concerned officers have been directed to take note of omissions for future. 

 

It is further to point out that the like Alignment Feasibility Studies for improvement of corridors are first submitted and only then uploaded on website by UTTIPEC for feedback.  This scheme when earlier submitted to DDA, was also uploaded.  Apart from this scheme, Executive Engineer, CW-122 has executed the work “Parking facilities and Road work at Rajghat Power Station”.  The features of the work are duly uploaded and updated time to time on PWD website and can well be viewed.

 

Coming back to the informations sought by you on the Mehrauli –Mahipalpur Road proposal, vide your earlier communication through email, addressed to Shri Ashok Khurana, Engineer Member, DDA, responded to you by EE-CW 122 vide above cited letter dated 30.5.11, it is to intimate as under;-

 

1.                          The reports and documents related to this project ‘Andheria Mod - Mahipalpur – NH-8’, are spread over 13 Correspondence Files (3 No. in Circle Office and 10 Nos. in Division Office) with three Reports (including DMRC report),

 

 

 

totalling to 3424 pages, apart from connected drawings, available in soft copy.   These drawings available in soft copy have already been forwarded to you through email on 2nd June, 2011 by Executive Engineer, CW-122. For obtaining the copies of the documents contained in reports and files as above, an amount of Rs. 6848/- is required to be deposited, otherwise the option of viewing these documents and reports in this office is always open.

 

2.                         Regarding the status of this project ‘Widening of Mehrauli- Mahipalpur Road from Andheria Mod to T-Junction with Aruna Asaf Ali Road’, it is intimated that this part length of the complete Mehrauli - Mahipalpur Corridor was not approved by UTITPEC and instead desired that PWD should submit comprehensive proposal for the complete Corridor improvement from Andheria  Mod to Mahipalpur – NH-8.  For the purpose,  PWD is still awaiting the demarcation  of land boundary for R.O.W. of the Corridor particularly at Masoodpur Village from the DDA. This matter is also under active monitoring by office of Hon’ble L.G.,  Govt. of Delhi   Unless the land boundary is made available without encroachments, it is not feasible for the PWD to plan the complete corridor and to submit comprehensive proposal to UTTIPEC. 

 

This is for your information please.    

           

Yours faithfully

 

 

 

(I.S. RANA)

Project Manager

 

Copy for information to ;

 

  1. The Engineer-in-Chief, PWD, GNCTD,  12th Floor, MSO Building, I.P. Estate, New Delhi.
  2. The Chief Engineer, Commonwealth Project Zone – CWI,        PWD, GNCTD,9th Floor, MSO Building, I.P. Estate, New Delhi.
  3. Shri C.K. Rejimon through email ‘dwark...@gmail.com’.

 

 

Project Manager

purshotam behl

unread,
Jun 27, 2011, 11:07:05 AM6/27/11
to dwarka-r...@googlegroups.com
Dear Rajimon Ji,
 Today I had been to the office of PWD,CW12 , and was very well attended by Sh. I.S. Rana and his staff . Number of bundles of files were there to be inspected , on this project. but when I told them my only  objective is to get the latest position of this excess of Dwarka , through NH-8 . they specifically told me that every thing is ready from our end , in these files , all the plans and proposals are ready ,but neither UTTIPEC or CM office is giving green signal to this project. The  reason being total political , as local MLA. Sh. Yoga Nand Sastri of masoodpur vill.is not allowing to widen the road passing through Masoodpur Vill. as it will attaract demolishing of  some properties.
Neither he is allowing any 3 lane flyover as proposed by PWD , through this village ,as that too will d evaluate the price of some shops  and on the other hand , UTTIPEC is not giving any approvals , to part of the project , unless the land is available in full , and NOC is granted by DDA.
Under the above circumstances , it seem that we will have to suffer for some  more years , unless, this type of 
politics is not Questioned , 
, In nutshell all the project is , an eyewash , and No solid or serious proposal for DWARKA's Exit.. 
Rest on seeing you,
P.Behl
9811113809

 REJIMON C K <reji...@gmail.com>
To: dwarka-r...@googlegroups.com
Sent: Fri, 24 June, 2011 9:44:01 AM
Subject: Re: [DWARKA FORUM] Re: MAHIPALPUR-VASANT KUNJ-NH-8 NEW ROAD
--
------------------------------------------------------------------------------

"DWARKA-FORUM" -- [Dwarka Ki Awaaz]
Visit Website www.dwarkaforum.org
Like us!! Click www.facebook.com/dwarkaforum
 
Police: 100 & 1090 Ambulance: 102 & 1099, Fire: 101, Traffic: 1095/23010101, Dwarka PS: 28051584, ACP:28051587, DCP: 28042984.

REJIMON C K

unread,
Jun 28, 2011, 4:26:07 AM6/28/11
to DWARKA FORUM
Behl Saab, Thax a ton for this iniative
 
So our suspicision cleared, it is the Politicians who are killing the various access to Dwarka , whether it this Mahipalpur or Dwarka-Palam VIhar.
 
I think we will need to take up with UTTIPEC and other authorities including RTI. I will also share the same with Pushpanjali Farmhouse RWA, Vasant Kunj RWA etc so that we all could united take up this.
For the Exit and Entry of NH-8 to Link Road need to work on long term with 100 Mtr road from u/p towards Najafgarh in awits principal approval for Rs. 150 Crore as I learned. So once this 100 Mtr and Dwarka-Palam Vihar (NPR) connectivity the Link road with NH-8 will be chocked.
 
Rejimon


----- Forwarded Message ----
From: purshotam behl <jaipu...@yahoo.co.in>
To: dwarka-r...@googlegroups.com
Sent: Mon, 27 June, 2011 8:37:05 PM
Subject: Re: [DWARKA FORUM] Re: MAHIPALPUR-VASANT KUNJ-NH-8 NEW ROAD

Dear Rajimon Ji,
 Today I had been to the office of PWD,CW12 , and was very well attended by Sh. I.S. Rana and his staff . Number of bundles of files were there to be inspected , on this project. but when I told them my only  objective is to get the latest position of this excess of Dwarka , through NH-8 . they specifically told me that every thing is ready from our end , in these files , all the plans and proposals are ready ,but neither UTTIPEC or CM office is giving green signal to this project. The  reason being total political , as local MLA. Sh. Yoga Nand Sastri of masoodpur vill.is not allowing to widen the road passing through Masoodpur Vill. as it will attaract demolishing of  some properties.
Neither he is allowing any 3 lane flyover as proposed by PWD , through this village ,as that too will d evaluate the price of some shops  and on the other hand , UTTIPEC is not giving any approvals , to part of the project , unless the land is available in full , and NOC is granted by DDA.
Under the above circumstances , it seem that we will have to suffer for some  more years , unless, this type of 
politics is not Questioned , 
, In nutshell all the project is , an eyewash , and No solid or serious proposal for DWARKA's Exit.. 
Rest on seeing you,
P.Behl
9811113809

 REJIMON C K <reji...@gmail.com> Sent: Fri, 24 June, 2011 9:44:01 AM
Subject: Re: [DWARKA FORUM] Re: MAHIPALPUR-VASANT KUNJ-NH-8 NEW ROAD
--
------------------------------------------------------------------------------

"DWARKA-FORUM" -- [Dwarka Ki Awaaz]
Visit Website www.dwarkaforum.org
Like us!! Click www.facebook.com/dwarkaforum
 
Police: 100 & 1090 Ambulance: 102 & 1099, Fire: 101, Traffic: 1095/23010101, Dwarka PS: 28051584, ACP:28051587, DCP: 28042984.

SDM-25017834, Child-1098, Women-1091, Sr. Citizen 1291, Postal 1914, AIIMS-26588700, Blood Bank, 23716441, ORBO 1060, Eye-1919, Disaster Management- 1070. LG Complaints 155355, CMO 155345, MCD-1266/25321235/23910419, DDA-24690431, DJB-1916, MTNL-198

N. Ramakrishnan

unread,
Jun 28, 2011, 4:40:36 AM6/28/11
to DWARKA FORUM, dwarka-r...@googlegroups.com
Good initiative by Behl Saab,
 
That particular stretch from Andheria Mode to Mahilpalpur is kept this way by the political class for a long time to safeguard their interest - it is a known factor. One classic example is the single lane flyover between Vasant Valley School and Masoorpur. 
 
The authorities have to think of a separate road bypassing the villages - widening and flyover options will be opposed by the market associations. All those shops in these two stretches are there only because of this busy stretch. If an option is given to them to fly over the market, the markets will be hit. It is logical that they will resist any such move through the politicians.
 
Rama
--- On Tue, 6/28/11, REJIMON C K <reji...@gmail.com> wrote:

REJIMON C K

unread,
Apr 26, 2012, 1:41:36 AM4/26/12
to dwarka-r...@googlegroups.com
Behl saab
Any update on this road which connet to Vasant Kunj?
I saw while landing from flight the road from Vasant Kunj to NH-8 connecting at Cremation Ground before Fly Over is almost ready but not opened.
Please share..
Thanks,
 
Reji

REJIMON C K.
Sent over wireless Network ... Google Nexus Phone.

purshotam behl

unread,
Apr 26, 2012, 4:10:08 AM4/26/12
to dwarka-r...@googlegroups.com
Rajimon Ji,
 The above road is almost complete , but needs final linkup near NH-8 and is not operational till now. may be waiting for some VIP,s date for  inauguration  .
P.Behl

JAIPUR AUTO SERVICE
--
Note:
To unsubscribe from this group, send email to Dwarka-residen...@googlegroups.com

gaurav malik

unread,
Apr 26, 2012, 6:39:20 AM4/26/12
to dwarka-r...@googlegroups.com
As per my information there is misconception about  Mr Yoganand shashtri MLA that he is neither allowing Flyover. Mr Yoganand shashtri MLA with resident of masoodpur visited LG house with the purposal of Flyover like Nairaina. LG have agreed to this .
The main concern of Traffic jam on Masoodpur stretch is
1) Parking of cars onhalf of road.
2) traffic coming from mahipalpur there is congestion while coming down from flyover , transformer is placed in between road due to which bottleneck occurs .

We are not aware of when work would start but till then we can remove encroachment on road . I have complained many times to UTTIPEC , PWD, Traffic police but I am not able to see any positive outcome .

Regards
Gaurav

27303310326-_location[1].PNG
Drawing1-Layout1[1].pdf
SUGESSTION_FORM[1].pdf
Reply all
Reply to author
Forward
0 new messages