So first time user and I'm running through the Two Days to a Demo, I'm on the part wh
It took about 28 minutes.
Why does creating the data set portion take so long?
What is happening during the the creation?
Is it just separating out to 3 data sets?
The tutorial data set is 20GB, and it doesn't appear that DIGITS is using the GPU (TITAN RTX) to help with the separation I suppose that is ok, but I expected maybe something else.
Is there something else going on here or does it just take that long?